bernice 0 Report post Posted August 30, 2007 is it.... thanks mace.jus called up mrs quek, she will email me the details soon. once this settle, hopefully by end of next wk will be ready liao. Share this post Link to post Share on other sites
MaCe 3 Report post Posted August 31, 2007 is it.... thanks mace.jus called up mrs quek, she will email me the details soon. once this settle, hopefully by end of next wk will be ready liao.you will be amaze by how his worker varnishes the door...... !! no horse run! Share this post Link to post Share on other sites
bernice 0 Report post Posted September 5, 2007 decided to get classic door from patrick, yesterday went back to check out, the toilet bi-fold door is up.now friday, carpenter will install the cabinet and sat to ask the ppl to install the accessories, the hob, hood and oven will delivery by sat 2-5pm. my fridge, dryer, washer will arrived on Monday.....wonder when the plumber will come as my toilet cabinet need to saw for room for the piping....shower screen and sliding glass door for kitchen is not up yet!so excited!!!! Share this post Link to post Share on other sites
applefreak 1 Report post Posted September 5, 2007 pix pix pix !! Share this post Link to post Share on other sites
MaCe 3 Report post Posted September 5, 2007 so excited!!!!pics lah..... Share this post Link to post Share on other sites
bernice 0 Report post Posted September 5, 2007 (edited) ok ok....Service Balcony - tall unit not up and waiting for dryer, washer and oven.MBR with wall light and window grilles upLiving RM with Zen lighting! Edited September 5, 2007 by bernice Share this post Link to post Share on other sites
MaCe 3 Report post Posted September 6, 2007 wah..move in liao! Share this post Link to post Share on other sites
bernice 0 Report post Posted September 6, 2007 haven't moved in yet.... lot of stuffs not in.... Share this post Link to post Share on other sites
bernice 0 Report post Posted September 12, 2007 kitchen cabinet is up!tall unit with oven.my island! Share this post Link to post Share on other sites
bernice 0 Report post Posted September 23, 2007 almost completed but got some hicupps... the 2nd chemical wash was not clean at all. well, will wait after everything completed to see anything done?kitchen completed without accessories mounted on it.my kitchen island, washer, dryer arrival.my custom made altar, tuesday 25-sep going to AN-SHENG. (thanks mace for the dates!) Share this post Link to post Share on other sites
bernice 0 Report post Posted November 4, 2007 move in 3wks ago.... latest pic of ready furniture!my simple dining areamy living rmliving rmkitchenmy island Share this post Link to post Share on other sites
applefreak 1 Report post Posted November 5, 2007 love your kitchen, the contrast is very niceand the island !! Share this post Link to post Share on other sites
bernice 0 Report post Posted November 6, 2007 thank Q!heeeheee after much planning manage to squeeze in my island! Share this post Link to post Share on other sites
butterflykisses 0 Report post Posted November 6, 2007 so cool got island! haha i wanted one but space doesnt allow. Share this post Link to post Share on other sites
h4happy 1 Report post Posted November 6, 2007 Hi BerniceWhat kitchen top you use?How much?Is it expensive?Thanks!HAPPY Share this post Link to post Share on other sites