candyprincess 0 Report post Posted August 7, 2007 eh urs is which blk ah? Share this post Link to post Share on other sites
Angelwrath 0 Report post Posted August 7, 2007 eh urs is which blk ah?510A Share this post Link to post Share on other sites
applefreak 1 Report post Posted August 7, 2007 Ok lunch time, post more later =)still cannot upload PDF leh, cannot print screen alsohow about selecting the pix at PDF then paste it in paint to save?me pix-freak, can't do without pix Share this post Link to post Share on other sites
Angelwrath 0 Report post Posted August 8, 2007 OOHHH, Applefreak so smart. should really rename to pixfreak le. LOLhere it goes, the floor plan =) Share this post Link to post Share on other sites
Angelwrath 0 Report post Posted August 8, 2007 (edited) More pics for the pixfreak! =)Day 3 of renoWasher and fridge baseElectrical points in MBR CitygasHHSProtection LayerTrade tool Edited August 8, 2007 by Angelwrath Share this post Link to post Share on other sites
vividip 0 Report post Posted August 8, 2007 Hey... we have got the same ID firm.. Urban Interiors. How much is your reno? Share this post Link to post Share on other sites
Angelwrath 0 Report post Posted August 8, 2007 Day 7 of renoStorage heater upCommon toiletPlumbling and lighting points for shadow lighting done. Tap for washer extendedTiled washer and fridge baseClose up shot of my living room homogenous tileHey... we have got the same ID firm.. Urban Interiors. How much is your reno?around $22k so far.How abt urs? and who's ur ID? Share this post Link to post Share on other sites
Angelwrath 0 Report post Posted August 8, 2007 MBR L-boxLiving room L-box / Gap for curtain trackFalse ceilingMBR toilet, dafault basin removedRain shower installedClose up of tiles and skirtingok, that's all i have for today. taken yesterday night. somehow my pics turn out to be purplish, dont know why. the air-con piping will be up by today, will take more pics when i go up to the new place.Meanwhile, enjoy the holiday and long weekend for some. 20 more days till handover! Happy National Day! =) Share this post Link to post Share on other sites
candyprincess 0 Report post Posted August 8, 2007 wow really fast wor! so far so good ya? btw is that ur original toilet tiling? Share this post Link to post Share on other sites
eR1c 0 Report post Posted August 8, 2007 Spam Chop from me after 2 days... hahaha...welcome welcome.. so when is ur completion date? Share this post Link to post Share on other sites
Angelwrath 0 Report post Posted August 8, 2007 wow really fast wor! so far so good ya? btw is that ur original toilet tiling?yup, the one i told u guys in the other sembawang thread. orange walls, yellow floor tiles and blue WC, basin. =.=Will be changing the bi-fold door though.Yup, so far so good. hopefully it continues.. LoL =)Spam Chop from me after 2 days... hahaha...welcome welcome.. so when is ur completion date?Thanks thanks! 28/8/07 =) Share this post Link to post Share on other sites
applefreak 1 Report post Posted August 8, 2007 wow your renovation is really 'fast and furious' wohthink mine started almost a month liao also about the same amount of things done only thanks a lot for the pix, really over them Share this post Link to post Share on other sites
Angelwrath 0 Report post Posted August 10, 2007 (edited) wow your renovation is really 'fast and furious' wohthink mine started almost a month liao also about the same amount of things done only thanks a lot for the pix, really over them lol.ya i admit my ID quite fast. chop chop only but i still cant wait for me to see the finished product.1 day finish electrical works1 day finish false ceilings2 days finish all tilings1 day finish all the plumbling and install them liaoETA is one month finish liao, applefreak think u better rush ur contractor wor.they gonna do the platform structure today. Stay in tune for more pics Edited August 10, 2007 by Angelwrath Share this post Link to post Share on other sites
mystique_j 0 Report post Posted August 10, 2007 Wah very fast.. can't wait to see more pics... Share this post Link to post Share on other sites
applefreak 1 Report post Posted August 10, 2007 hehehe no need to rush him coz i asked him to slowly slowly do the thingsdun want to leave my nest empty during the seventh month coz i believe 'yin' energy will gather good for me to have pple coming in and out of the unit during this time.now me left carpentry and plumbing and aluminium works only, think should be able to handover at the end of this month Share this post Link to post Share on other sites