SimEl 0 Report post Posted July 30, 2007 Surveyed about 7 ID firms before finally deciding to seal the deal with Max's Image Consultants at HDB Hub. ID is Kasey.Upon agreeing on the deal, 3D images were ready about 4-5 days later...efficient! Received the green light from HDB and started our reno about 1 week later, around 12 July. Let's call this "R" day R + 2 days : Attached are some images of our home after the hacking works were completed... Share this post Link to post Share on other sites
SimEl 0 Report post Posted July 30, 2007 Very glad indeed that the reno was moving real fast. As we have pretty much hacking to do to re-furbish the whole house, it was to our surprise at which the work was done.About R + 1 week later, the tiling at kitchen as well as toilets were up.They went on to lay the base for our kitchen cabinet...more to follow Share this post Link to post Share on other sites
lifestyle 0 Report post Posted July 30, 2007 (edited) Hi SimEl,Welcome to RenoTalk. Spam #1 chop from me You place remind me of our old place too. Those pipes & bathroom kerbs. Are you planning to box up those long kitchen pipes?All the best in your reno. What will your theme be? Edited July 30, 2007 by lifestyle Share this post Link to post Share on other sites
SimEl 0 Report post Posted July 30, 2007 It's now approximately R + 2 weeks....Next to follow were the L-Boxes in the living and all the bedrooms. The aircon man, also a contractor from Kasey, subsequently came to run the pipings and installation of aircons. Electrical wirings were being run round the whole house, gas pipings..Plastering of walls + base coat painting soon followed...our home is starting to take shape! So far, very good experience with the IDs This is how it looks now more to follow...Hi SimEl,Welcome to RenoTalk. Spam #1 chop from me You place remind me of our old place too. Those pipes & bathroom kerbs. Are you planning to box up those long kitchen pipes?All the best in your reno. What will your theme be? Hi Lifestyle, thanks. Our theme is Modern resort. ya... we'll be boxing up the pipes as part of the cabinet. As you can see, I have not taken so many pics yet and am trying to update all the sequence of work that has been completed to date Finally....now is R + 2.5 weeks ~ 29 Jul , all the required painting is almost done, the lightings and fans are being fixed up. Just realised they have wased the kitchen floor and toilet floors. Guess they're preparing for the cabinets and laminate flooring which is due this coming week... Share this post Link to post Share on other sites
jamez 0 Report post Posted July 30, 2007 (edited) Welcome to renotalk! #2 spamchop from me! love the black rose/flower/plant tiles in ur kitchen. looking forward to more pics. Edited July 30, 2007 by jamez Share this post Link to post Share on other sites
applefreak 1 Report post Posted July 30, 2007 welcome to renotalk, me spam chop number 3 you're place is really shaping up nicely Share this post Link to post Share on other sites
eR1c 0 Report post Posted July 30, 2007 Me is Spam #4! Reno looking good... more pix. Share this post Link to post Share on other sites
SimEl 0 Report post Posted August 6, 2007 Hey everyone, thanks for all the "spam chops" It's now ~ R + 3.5 weeks! .....all going smooth...Supreme Laminate flooring for is up and some paint touch ups and layering...This is how it's looking...Bedroom:Living + Dining:Next to come..the BIG chunk..all the carpentries..... !! Share this post Link to post Share on other sites
audreymarilyn 0 Report post Posted August 6, 2007 hi,wats ur entire quotation like? it seems u hacking away everything n doing everything fm scratch? coz i'm looking for ID now. u mention u spoke to 7 ID b4 deciding on this one rite. wat was it tat made u choose them?Audrey Share this post Link to post Share on other sites
jamez 0 Report post Posted August 6, 2007 laminate flooring lookz good! looking forward to more pics! !! Share this post Link to post Share on other sites
CRYSTALNG 0 Report post Posted August 6, 2007 Elo Neighbour =) ...though not sure where u stay but we stay in the same estate ! have fun reno-ing me also now in the process Share this post Link to post Share on other sites
applefreak 1 Report post Posted August 6, 2007 your living + dining area looks bright and cheerymust be cosy having dinner there Share this post Link to post Share on other sites
eR1c 0 Report post Posted August 8, 2007 Nice Transformation! Share this post Link to post Share on other sites
SimEl 0 Report post Posted August 22, 2007 Have been quite a while since I last updated...so busy with everything else Anyway, it's now R+5.5 weeks, all the carpentries are almost done up and we really have quite a bit of carpentry work around the house...the living/dining area with the lights up:Our shoe cabinet cum divider at the door way( one of those things we're really happy with) The kitchen cabinets:Our 'changing room'! a room which we've made into a changing room, with full walk-in cabinet and complete mirror on one full side of the wall!Cool! Carpentry has taken quite a bit of time. Although there were some minor mistakes here and there, our ID and carpenter gladly modified them to our liking...Good job so far! Share this post Link to post Share on other sites
applefreak 1 Report post Posted August 22, 2007 ooooh lah lah, your shoe cabinet looks good is that a bicyble i see behind? so envious that you've got a changing room, me only have space for a 6ft wardrobe Share this post Link to post Share on other sites