Jump to content
Find Professionals    Deals    Get Quotations   Portfolios
Sign in to follow this  
xlan

Xl-dreamhouse

Recommended Posts

Looking for good contractors? Click here for your request
Cabinet on top of the fridge are taken in. Means you need to measure from fridge towards the other end. I think so.

Hi,

Yup, so need to go down and measure etc..

Just that not sure if overcharged or not..

but anyway confirmed and sign liao.. so oh well.. :dancingqueen:

 

Share this post


Link to post
Share on other sites

Dont let this dampen your spirit.

Put the cost aside.

What matter most is the worksmanhip!

SIM...Why dont you have your own tblog, better this way.

And can share your pic also.

Hi,

Yup, so need to go down and measure etc..

Just that not sure if overcharged or not..

but anyway confirmed and sign liao.. so oh well.. :dancingqueen:

Edited by h4happy
 

Share this post


Link to post
Share on other sites
Can go to http://www.eubiq.com to take a look..

Hi, Binzz.

Thanks....

They are nice and tidy...but expensive... :dancingqueen:

May not need now cos my id has installed all the electrical points as required. Will consider in the future when points are not longer sufficient.

Thank you!

 

Share this post


Link to post
Share on other sites
Dont let this dampen your spirit.

Put the cost aside.

What matter most is the worksmanhip!

SIM...Why dont you have your own tblog, better this way.

And can share your pic also.

Hehe.. Yup.. the worksmanship most impt 8|

Ya, think will have a tblog keke.. but need to take some photos first i guess..

Currently havent taken a single one yet :)

In fact we also now lost in choosing all the designs etc..

and the paint colour.. :jawdrop:

 

Share this post


Link to post
Share on other sites

hahaha.. sorry guys.. was busy these few days.. seldom login...

n yes.. the Eupiq is indeed very NICE provided we have enough length for it in the kitchen.. i was adviced by Lance, my kitchen is too short to optimise the usage of Eupiq.. n for about at most 600mm it'd reach the stove area, which cannot have the Eubiq anymore.. for such a short track and stop in the middle of the kitchen will not look nice.. it'd b nice only if the track is running across frm wall to wall.. which means unless i have 1 full side of dry kitchen then more worth the installation.. so eventually i have already dropped the idea le..

simpleboi.. me too leh.. after signed on the dotted line.. actually didn't really refer back to my quotation every now n then to check on whether they have over-charged me.. but rather.. i looking forward to see the workmanship n more "freebies" along the way.. hahaha.. keep bargain with them to help change certain tings (small amount) FOC.. haahaa.. ok lah.. so far Lance is doing a gd job n v helpful.. haha..

yest nite went back to see the progress.. my 3 room's laminate flooring are almost done le.. like it very much.. white n bright.. :notti: .. n Lance had changed the light switches for me already.. kitchen entrance is building up as well.. :bangwall:

 

Share this post


Link to post
Share on other sites

Hi XLAN

Pics speak louder than words. hahahah

Can see your pic laminated floor, white and bright? Your laminate is white colour?

Thanks!!

HAPPY

 

Share this post


Link to post
Share on other sites
simpleboi.. me too leh.. after signed on the dotted line.. actually didn't really refer back to my quotation every now n then to check on whether they have over-charged me.. but rather.. i looking forward to see the workmanship n more "freebies" along the way.. hahaha.. keep bargain with them to help change certain tings (small amount) FOC.. haahaa.. ok lah.. so far Lance is doing a gd job n v helpful.. haha..

yest nite went back to see the progress.. my 3 room's laminate flooring are almost done le.. like it very much.. white n bright.. :lol: .. n Lance had changed the light switches for me already.. kitchen entrance is building up as well.. :rofl:

Yup, hehe my tiling works starting today.. however, I am at work so unable to go down see see.. think after work in the evening going down to take a look to see how :fire:

 

Share this post


Link to post
Share on other sites

laminates flooring from Supreme:

laminates2bi3.jpg

snow white color:

laminates4sh4.jpg

laid in MBR:

laminatesmbrkb1.jpg

laid in the other 2 bedrooms:

laminatesbedrm23xc3.jpg

Kitchen entrance is making in process.. but a bit worried if my new fridge can go through or not.. :sport-smiley-004:

kitchenentrancerm7.jpg

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×