hongss 3 Report post Posted July 24, 2007 Hi,im working on a tight budget on reno but i would like to replace the floor and wall tiles of 2 toilets and kitchen. I was thinking overlaying the tiles rather than hack and re-lay. But im not sure how much difference in terms of cost will i be able to save?the big question: is it worth to overlay? Share this post Link to post Share on other sites
deathcoth 0 Report post Posted July 24, 2007 Hi,im working on a tight budget on reno but i would like to replace the floor and wall tiles of 2 toilets and kitchen. I was thinking overlaying the tiles rather than hack and re-lay. But im not sure how much difference in terms of cost will i be able to save?the big question: is it worth to overlay?not worth it.just hack it n replace ... wont be few hundred more compare to the thousands on the tiles spend. Share this post Link to post Share on other sites
1000miles 0 Report post Posted July 25, 2007 Hi,im working on a tight budget on reno but i would like to replace the floor and wall tiles of 2 toilets and kitchen. I was thinking overlaying the tiles rather than hack and re-lay. But im not sure how much difference in terms of cost will i be able to save?the big question: is it worth to overlay?It is not worth it. If the original tiles has hollow section, your new tiles may pop out next time. When u knock on the tiles, the sound is different from the rest, a hollow sound can be heard. There are several topics on Overlaying Of Tiles, you can look at it. Share this post Link to post Share on other sites
MaCe 3 Report post Posted July 25, 2007 Hi,im working on a tight budget on reno but i would like to replace the floor and wall tiles of 2 toilets and kitchen. I was thinking overlaying the tiles rather than hack and re-lay. But im not sure how much difference in terms of cost will i be able to save?the big question: is it worth to overlay?if you plan to stay in the house for just 3 yrs then overlay.or else then the savings you have now will not be enough to cover whatever problems that arises from the tiles in future. Share this post Link to post Share on other sites
Devilaz 0 Report post Posted July 25, 2007 agree on what MaCe mention.but if u are staying 5 years or more.Hack and replace new ones. If you are on tight budget. Why not u settle things one by one. Like settle tiles and done up kitchen and both toilets. then capentry will hold until you are ok with it then u can go for second half.Dont need one short do all. u will dry up fast. Share this post Link to post Share on other sites
hongss 3 Report post Posted July 25, 2007 agree on what MaCe mention.but if u are staying 5 years or more.Hack and replace new ones. If you are on tight budget. Why not u settle things one by one. Like settle tiles and done up kitchen and both toilets. then capentry will hold until you are ok with it then u can go for second half.Dont need one short do all. u will dry up fast.Thanks for all the advise. I will know what to do liao.. Share this post Link to post Share on other sites
Devilaz 0 Report post Posted July 25, 2007 okiez... all the best on ur coming reno... Share this post Link to post Share on other sites
MaCe 3 Report post Posted July 26, 2007 Dont need one short do all. u will dry up fast.like me now eating grass.... Share this post Link to post Share on other sites