applefreak 1 Report post Posted July 23, 2007 muz charge them rental leh, cannot stay FOC since the house was supposed to be handover to your. my sis charged the previous owner rental when they wanted to stay for 2mths after the supposed handover date.second that!and must make them sign agreement that they will maintain the place according to the valuation photosthat's what you have paid for mah Share this post Link to post Share on other sites
angielim 0 Report post Posted July 23, 2007 second that!and must make them sign agreement that they will maintain the place according to the valuation photosthat's what you have paid for mah Signed agreement to let them stay when we signed the OTP..wasn't in a hurry to move it then..so have to honour our agreement lor..hope they'll clear up everything when they move out this Sun!!Will take more pictures of the empty house then! Share this post Link to post Share on other sites
applefreak 1 Report post Posted July 23, 2007 yippee got more pix to see Share this post Link to post Share on other sites
waileong 0 Report post Posted July 24, 2007 You have a grandfather clock and a white pedestal, if you don't intend to use them in your house after the reno, please let me know through PM. Share this post Link to post Share on other sites
angielim 0 Report post Posted July 24, 2007 You have a grandfather clock and a white pedestal, if you don't intend to use them in your house after the reno, please let me know through PM.They are removing everything...so I'll be left with an empty house.. Share this post Link to post Share on other sites
MaCe 3 Report post Posted July 24, 2007 They are removing everything...so I'll be left with an empty house..I thot you are giving away all the wallpapers free? whahahaha Share this post Link to post Share on other sites
angielim 0 Report post Posted July 24, 2007 I thot you are giving away all the wallpapers free? whahahaha Anybody wants them?? hahaha... Share this post Link to post Share on other sites
applefreak 1 Report post Posted July 24, 2007 actually your place, just need to spray the cornices white will look very nice liaodun need too much renoas for the bathroom, maybe you want to ask your FSM to help see what can be done to retain them really really really love your bathroom Share this post Link to post Share on other sites
angielim 0 Report post Posted July 24, 2007 actually your place, just need to spray the cornices white will look very nice liaodun need too much renoas for the bathroom, maybe you want to ask your FSM to help see what can be done to retain them really really really love your bathroom Sigh...my approved reno loan is much lower than what's in my quotation...tragic..don't want to fork up too much cash 'cos still need to buy furnishings, lightings and toilet fittings... If really no choice than have to see what else I can cut down on...now waiting for ID to come up with a drawing so I can show my FSM...Everything seems so rushed! Supposed to start reno on 6/8...but nothing's done yet! Have to start before the lunar 7th month...otherwise have to wait so long! And I'm going Perth for a work trip for 2 weeks from 17/8...won't be able to check on the reno progress! Share this post Link to post Share on other sites
applefreak 1 Report post Posted July 24, 2007 that's why it's very important to get an ID you feel comfortablefor my renovation, although started one week liaobut i only went down once to take delivery of the lightseverything else i leave it to my contractor actually to start renovation just need to take hammer and knock knock on the tile can liaono need to really hack here and there Share this post Link to post Share on other sites
angielim 0 Report post Posted July 24, 2007 Yeah lor...but there's a time frame to finish all the wet works right?Hacking can only take place for 3 days..and all the tilings must be completed by end Aug leh..I've not even chosen any tiles or seen any designs! The reno loan take so long to process! It's finally processed today..but will only receive the bank drafts in another few days.. Share this post Link to post Share on other sites
applefreak 1 Report post Posted July 24, 2007 serious? you mean the seventh month thing or the hdb ruling?my unit hacking think took one whole week or moretiling should take around two to three weeks so eng Aug should still make itmaybe you want to check out the tile shops along balestier road to get an idea of what kind of tiles are available?or if you are in the west then toh guan there got one big showroom, but can't remember the name Share this post Link to post Share on other sites
angielim 0 Report post Posted July 24, 2007 serious? you mean the seventh month thing or the hdb ruling?my unit hacking think took one whole week or moretiling should take around two to three weeks so eng Aug should still make itmaybe you want to check out the tile shops along balestier road to get an idea of what kind of tiles are available?or if you are in the west then toh guan there got one big showroom, but can't remember the name Think 7th month also no good for hacking leh..my parents asked me to finish all the hacking before 7th month..It's a HDB ruling i think...i just received the reno permit they sent...only 3 days for hacking works.. Share this post Link to post Share on other sites
applefreak 1 Report post Posted July 24, 2007 if hacking done within three days, should be before seventh month mahas long as hack before 13 aug, which is at least 3 weeks away shouldn't be a problem right? Share this post Link to post Share on other sites
angielim 0 Report post Posted July 24, 2007 if hacking done within three days, should be before seventh month mahas long as hack before 13 aug, which is at least 3 weeks away shouldn't be a problem right?eeehhh....think so leh..my FSM say doesn't matter..but our parents said no no.. Share this post Link to post Share on other sites