Jump to content
Find Professionals    Deals    Get Quotations   Portfolios
Sign in to follow this  
shmj

Renovation....


Recommended Posts

I'm pushing my ID to finish my reno is 1 month.... he said he'll try his best but cant promise. :(

Anyways, just wanna have an idea how long it will ususally take to finish renovation.

Thanks for Sharing!!!

 

Share this post


Link to post
Share on other sites

Join 46,923 satisfied homeowners who used renotalk quotation service to find interior designers. Get an estimated quotation
1 month is a bit too short unless you have little things to do. Give him a bit more time. You do not want to sacrifice the quality right?

Boh pien leh.... gotta move in b4 the lunar 7th month.

I'll be doing a walk in wardrobe in the master bedroom, kitchen cabinets, vanity top & cabinets in toilet, simple feature wall in dining area, shoe cabinet, laminated flooring, tiles at the shoe cabinet area, small platform + painting & electrical works.... Too much?? !!

 

Share this post


Link to post
Share on other sites
Boh pien leh.... gotta move in b4 the lunar 7th month.

I'll be doing a walk in wardrobe in the master bedroom, kitchen cabinets, vanity top & cabinets in toilet, simple feature wall in dining area, shoe cabinet, laminated flooring, tiles at the shoe cabinet area, small platform + painting & electrical works.... Too much?? :drunk:

1 mth is rather rush.....maybe you wanna read about those articles on the outcome of rush work.

but 7th mth also near..... headache ah! :dancingqueen:

 

Share this post


Link to post
Share on other sites

1 month to settle reno is sure too rush already. As what MaCe state output of the final product will not to what you expected.

 

Share this post


Link to post
Share on other sites

headache leh... the reno started last Fri. today all the false ceiling will be finished.

I did tell the ID tt he can try to finish at least 80% of the works. The rest, he can still come in & do after we "officially" move in...

I trust him lah... cos my ofc reno done by him one... he's quite on & workmanship so far so good.

 

Share this post


Link to post
Share on other sites

It really depends on your contractor if he subout the various job or if he is doing all. Subout will take coordination and to see if the other party has other projects to rush too?

Who is your contractor?

 

Share this post


Link to post
Share on other sites
It really depends on your contractor if he subout the various job or if he is doing all. Subout will take coordination and to see if the other party has other projects to rush too?

Who is your contractor?

we are using Linewerkz

 

Share this post


Link to post
Share on other sites
Boh pien leh.... gotta move in b4 the lunar 7th month.

I'll be doing a walk in wardrobe in the master bedroom, kitchen cabinets, vanity top & cabinets in toilet, simple feature wall in dining area, shoe cabinet, laminated flooring, tiles at the shoe cabinet area, small platform + painting & electrical works.... Too much?? :bow:

hmm, these works should be able to be completed in a month bah

most of the carpentry stuff will be fabricated in the factory first mah

 

Share this post


Link to post
Share on other sites
hmm, these works should be able to be completed in a month bah

most of the carpentry stuff will be fabricated in the factory first mah

now left with the carpentry & toilet works...

just spoke to the ID & he said 95% shld be able to finish on time for handover on 3rd Aug....

pray hard hard he wont "tua" me.... else :bow::P

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  


×