Jump to content
Find Professionals    Deals    Get Quotations   Portfolios
Sign in to follow this  
selenal

Jamsel's Home 7681

Recommended Posts


Join 46,923 satisfied homeowners who used renotalk quotation service to find interior designers. Get an estimated quotation
Here's the 3D computer drawings...

KITCHEN_2__copy.jpg

KITCHEN_copy.jpg

selenal, how did you run ur piping for the kitchen to ur sink area.

Did you run it across the bottom of the door to the original outlet point?

Did you change the size of the existing service balcony door?

 

Share this post


Link to post
Share on other sites
very very nice colours

interesting work area at your kitchen at the window :D

thank u thank u.. just hope the results look as good as the pictures..

pictures taken today...

Photo-0093.jpg

Photo-0095.jpg

Photo-0092.jpg

Photo-0096.jpg

 

Share this post


Link to post
Share on other sites

hmm.. look like u remove the door and run the piping to the washing machine area?

I have that idea too.. (actually after i see your house.. hee.. THANK!!)

can i know the cost of doing that.. pm me if you think the pricing is confidential.

 

Share this post


Link to post
Share on other sites

living and dining - bright vs pale yellow as suggested by ID cos his prev brown beige i say too common...

Photo-0099.jpg

Photo-0098.jpg

MBR- wanted something more striking... a darker pink perhaps.. bt was advised nt to..

Photo-0102.jpg

Photo-0103.jpg

bedrm 2 and 3.. feel that the colours are much nicer on the booklet...

Photo-0100.jpg

Photo-0101.jpg

no studyrm pic.. cos just a pale yellow or issit beige...

the door tat we dismantle frm the service balcony... hm... hope to sell away this...

Photo-0097.jpg

hmm.. look like u remove the door and run the piping to the washing machine area?

I have that idea too.. (actually after i see your house.. hee.. THANK!!)

can i know the cost of doing that.. pm me if you think the pricing is confidential.

i changed the door and re-run the piping.. the new door cost abt 200 and the re-running is ard 100plus i think.. nt very sure too.. cos we ammended the original quote and the lastest quote is still with my ID... not of much help..

 

Share this post


Link to post
Share on other sites

ooo very good very gooD! i regret not doin L shape for my Kitchen!! arghhhhhhhh!:dribble: nw have to go source for own trolley/table siannnnnnnnn!! ehhh ur MBR like same colour as mine heeee

Edited by candyprincess
 

Share this post


Link to post
Share on other sites

same colour ar?? haha... didnt really noticed.. haha.. i wanted a darker pink.. lol.. bt someone disagrees... i need alot of working top for the kitchen la.. tats y for the L.. even with the L i also find it nt enuf.. still must add on on another side...

now must psycho myself tat the yellow nt very sala..

Edited by selenal
 

Share this post


Link to post
Share on other sites
same colour ar?? haha... didnt really noticed.. haha.. i wanted a darker pink.. lol.. bt someone disagrees... i need alot of working top for the kitchen la.. tats y for the L.. even with the L i also find it nt enuf.. still must add on on another side...

now must psycho myself tat the yellow nt very sala..

hmm i also wanted darker but hubbs says nt too dark.. ID says wait look too indian style ... duh...

yeh i also need a lot of work top for kitchen and i didnt realise that im soooooooooooo short of it nw!:notti: Stupid overlooking on my part! :dribble::yamseng: so irritated with myself!!!! nw have to look for table to place there liao.... da!!@

 

Share this post


Link to post
Share on other sites
hmm i also wanted darker but hubbs says nt too dark.. ID says wait look too indian style ... duh...

yeh i also need a lot of work top for kitchen and i didnt realise that im soooooooooooo short of it nw!:bow: Stupid overlooking on my part! !! !! so irritated with myself!:D! nw have to look for table to place there liao.... da!!@

new updates..?? :P

 

Share this post


Link to post
Share on other sites

a little update:

carpentry is on the way.. gg to be completed by 25feb... some pics

Photo-0118.jpg

Photo-0119.jpg

Photo-0120.jpg

the ledge is too long.. gotta shorten it..

didnt take much pics of the carpentry.. only the kitchen area...

Photo-0108-1.jpg

Edited by selenal
 

Share this post


Link to post
Share on other sites

the smelliest place in the hse: shoe cabinet

Photo-0130.jpg

still gotta touchup some parts i think...

some shelves for displaying stuff

Photo-0129.jpg

my kitchen... waiting for the granite top to arrive on thurs

Photo-0125.jpg

Photo-0126.jpg

Photo-0128.jpg

my black black sink

Photo-0127.jpg

MBR wardrobe

Photo-0124.jpg

tv ledge

Photo-0123.jpg

side table

Photo-0122.jpg

MBR light

DSC01427.jpg

 

Share this post


Link to post
Share on other sites

no wonder..i saw the 3D drawings, the quality of the pictures are exactly same as what i am given, heh..then i look at ur first page of ur blog, same ID firm :notti:

looking forward to see your nice completed kitchen

 

Share this post


Link to post
Share on other sites

updates:

grills done.

kitchen top installed.

kitchen entrance swing door installed.

service balcony installed.

curtain rail installed.

shower glass door installed in MBR toilet.

doing last round of painting.

doing the carpentry touch-ups.

but.... my lights still not here yet... haiz..

going move over on the 8th...

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×