Jas@Sandy 0 Report post Posted January 21, 2008 Hi Happy,Is it you collect the key already?Sandy Share this post Link to post Share on other sites
h4happy 1 Report post Posted January 21, 2008 Hi SanyHave not.Still waiting for the letter.Maybe this week or next week.If not, then likely will be mid feb 08 after cny.How about you?Everything ready and waiting for the key?HAPPYHi Happy,Is it you collect the key already?Sandy Share this post Link to post Share on other sites
Mirage 0 Report post Posted January 21, 2008 Hi Everybody,Just like to check with you guys/ladies, how do you check the power point and switches? I just collected keys and Electrical Power is not turned on yet. We can only check when we installed our lightings right? But won't it be too late, as we are given only 7 days to report any defects from day of collection of keys? Any advice is appreciated. miragesee like alot of thing to look out1) Rubber (HSS)2) Window screw3) Retractable screw (ONE POST WONDER)4) Power point5) Main Gate6) Any crack tiles in the kitchen floor7)sewage cap die la I dunno what more to look out if I go to my unit , is it better to call my ID to go together at least they can hunt and find more thing isit?AIyo now waiting for HDB letter for key collection , I call HDB officer but no answer . (I just need a estimate date of collection so I can make planning) Share this post Link to post Share on other sites
Jas@Sandy 0 Report post Posted January 21, 2008 Hi Happy,Yes, waiting for the key.I know the lift already work. i still haven't go down and see the flat. Which floor u live?Sandy Share this post Link to post Share on other sites
sparey 0 Report post Posted January 21, 2008 Anybody out there actually took out the kitchen electrical plug plastic cover provided by HDB (outside toilet)?Another thing is our doors, anyone vanish it? Heard that is good to vanish both toilet doors to protect from water. How about doors for all rooms?Hi Everybody,Just like to check with you guys/ladies, how do you check the power point and switches? I just collected keys and Electrical Power is not turned on yet. We can only check when we installed our lightings right? But won't it be too late, as we are given only 7 days to report any defects from day of collection of keys? Any advice is appreciated. mirageDefects can always report as and when we like no limitations one. I reported a few more defects 2 months later after I collected my keys Share this post Link to post Share on other sites
Mirage 0 Report post Posted January 21, 2008 Hi sparey,Thank you for the advice. mirageAnybody out there actually took out the kitchen electrical plug plastic cover provided by HDB (outside toilet)?Another thing is our doors, anyone vanish it? Heard that is good to vanish both toilet doors to protect from water. How about doors for all rooms?Defects can always report as and when we like no limitations one. I reported a few more defects 2 months later after I collected my keys Share this post Link to post Share on other sites
VinceDelfino 0 Report post Posted January 21, 2008 Another thing is our doors, anyone vanish it? Heard that is good to vanish both toilet doors to protect from water. How about doors for all rooms?i did vanish all the doors...very nice & shiny... Share this post Link to post Share on other sites
sparey 0 Report post Posted January 21, 2008 i did vanish all the doors...very nice & shiny... Is it??? Thought matt matt also nice... maybe can consider vanish all too How about the kitchen plug cover? Did you remove it? Was thinking will be troublesome to open the lid for switching on lights and will keep dust too Share this post Link to post Share on other sites
h4happy 1 Report post Posted January 22, 2008 Hi VINCECan show me the pic how vanish look like?Need to pay for vanish the main door?Thanks!!HAPPPYi did vanish all the doors...very nice & shiny... Share this post Link to post Share on other sites
draught 0 Report post Posted January 22, 2008 (edited) if i rem correctly... my ID's electrician did tat for us..wiring will be done by the electrician, but the wires will be long enough for the false ceiling ppl to adjust as requiredThanks for the reply...I will discuss further with me contractor then.. Edited January 22, 2008 by draught Share this post Link to post Share on other sites
almatador 0 Report post Posted January 22, 2008 opps... and I thought I was veri bad previously ;pJust to share...BRC actually dragged my rectification for 2 months after reporting. And on this fine day, while skimming through the HDB webby, I made an online defect report. True enough, a HDB officer called me, and finally within the next 2 wks, BRC came to see and rectify my problems.Didn't like the way they try to push off the problems, but given the choice, I would rather have nothing to do/ask of them.kitchen tiles could be damaged by chemical washing. mine for the kitchen tiles cement/glue came off, ask contractor to patch up, of course he's not happy.. but since he created the problem, he should take care of it!for me, i stay at 27B very easy to report defects.. hahah.. they know me by now, and also my husband's face..the sub con is unwilling to change my kitchen switch because my reno is completed. i told him, hey when i reported the defect my house was empty, now the house is filling up.. and they dare say this... i'll make a big noise to HDB if they continue pushing responsibility Share this post Link to post Share on other sites
kriegs 0 Report post Posted January 22, 2008 Hi Everybody,Just like to check with you guys/ladies, how do you check the power point and switches? I just collected keys and Electrical Power is not turned on yet. We can only check when we installed our lightings right? But won't it be too late, as we are given only 7 days to report any defects from day of collection of keys? Any advice is appreciated. mirageThe electrical and water are temporary turn on for u to facilitate checking of defects. There shld be a brochure inside your RCB unit to show you how to turn it on. Share this post Link to post Share on other sites
Simpleboi 0 Report post Posted January 22, 2008 Hi all,That time somebody asked bout the pic for the wire mesh in the toilets?Was it happy?Anyway, here's the photo of it.. Share this post Link to post Share on other sites
VinceDelfino 0 Report post Posted January 22, 2008 Is it??? Thought matt matt also nice... maybe can consider vanish all too How about the kitchen plug cover? Did you remove it? Was thinking will be troublesome to open the lid for switching on lights and will keep dust too did not remove the plastic covers. the purpose of having them there is to protect them from water dripping down (if any) from the water reservoir. you can remove them if your heater is not fix directly on top of the switches. however i must agree that i hit into them a couple of times after forgetting to close the covers. Share this post Link to post Share on other sites
h4happy 1 Report post Posted January 22, 2008 Hi SIMThanks....HAPPY Hi all,That time somebody asked bout the pic for the wire mesh in the toilets?Was it happy?Anyway, here's the photo of it.. Share this post Link to post Share on other sites