nemofc 0 Report post Posted January 21, 2008 i din keep a copy.. so far so good.. but the kitchen switch is taking too **** long. i didn't have a copy as well but i rewrite 1 copy for myself.you can try calling them again about the switch or inform hdb branch office . Share this post Link to post Share on other sites
h4happy 1 Report post Posted January 21, 2008 From TYP blog : ""Hi allCalling out for help. My HDB shower set is missing and I need some kind soul to donate one set to me if u are changing urs.As it is very urgent, I need it either today or tomorrow, pls pm me & I will collect from u immediately.Thanks in advance.""Wow...someone stole it???Scary man! Share this post Link to post Share on other sites
nemofc 0 Report post Posted January 21, 2008 From TYP blog : ""Hi allCalling out for help. My HDB shower set is missing and I need some kind soul to donate one set to me if u are changing urs.As it is very urgent, I need it either today or tomorrow, pls pm me & I will collect from u immediately.Thanks in advance.""Wow...someone stole it???Scary man! that's too much liao... Share this post Link to post Share on other sites
jazznpop 0 Report post Posted January 21, 2008 wow wonder how they can steal the shower set??? Share this post Link to post Share on other sites
xlan 0 Report post Posted January 21, 2008 (edited) but the 1st moment of opening the dooor for the 1st time as owners is quite thrilling (haha xlan will know because i called her when i was at the door) hahaha.. ya ya.. hv fun saying all those silly things.. but was real funny.. hahaha.. last sat i did even more silly ting.. roll in the pinapple n keep saying wang ah.. strike toto ah.. wang ah.. by my definition, wadever thing i'm not satisfied i'll report as a defect, including wadever stain there is. haha... my hubby kept saying "this one can clean one can clean one..." i told him if can clean, it's also they clean, not me. the pros have the tools and chemicals to clean. i only have detergent.... hahahaha.. same same.. but i regret not having this mentally earlier.. now hv to clean everything myself.. real tiring.. so all others who jus got ur keys.. b4 reno.. go report all stains as defects.. else later kana push blames ard.. "no.. is ur reno contractor did it"... "no.. HDB contractor stained it"... etc etc... is v v v the sianz de loh... oh ya.. n who will 1 2 steal the shower head ah? is v lousy 1 leh.. water very weak de.. not nice to use 1.. ;c Edited January 21, 2008 by xlan Share this post Link to post Share on other sites
elaine1205 0 Report post Posted January 21, 2008 (edited) push them to do it fast. i send defect list many many times and have only sign only 2 so far even thru they have complete all of them.by the way, who gt the contacts of the uncle who weld the lockof the main gates?i din keep a copy.. so far so good.. but the kitchen switch is taking too **** long. Edited January 21, 2008 by elaine1205 Share this post Link to post Share on other sites
nemofc 0 Report post Posted January 21, 2008 hahaha.. ya ya.. hv fun saying all those silly things.. but was real funny.. hahaha.. last sat i did even more silly ting.. roll in the pinapple n keep saying wang ah.. strike toto ah.. wang ah.. hahahaha.. same same.. but i regret not having this mentally earlier.. now hv to clean everything myself.. real tiring.. so all others who jus got ur keys.. b4 reno.. go report all stains as defects.. else later kana push blames ard.. "no.. is ur reno contractor did it"... "no.. HDB contractor stained it"... etc etc... is v v v the sianz de loh... oh ya.. n who will 1 2 steal the shower head ah? is v lousy 1 leh.. water very weak de.. not nice to use 1.. ;cJust add on about Utilities, i heard from SP service that when we apply, technical people will write down the meter reading and claim from Town Council. So, No worries about the readings which the HDB contractor/s have used. So, not necessary to turn on the utilities first unless renov start. Share this post Link to post Share on other sites
elaine1205 0 Report post Posted January 21, 2008 fr TYP????i dun really understand this msg le. missing can meant misplaced also. or the renovation own guys steal it ? no further details to led on?From TYP blog : ""Hi allCalling out for help. My HDB shower set is missing and I need some kind soul to donate one set to me if u are changing urs.As it is very urgent, I need it either today or tomorrow, pls pm me & I will collect from u immediately.Thanks in advance.""Wow...someone stole it???Scary man! Share this post Link to post Share on other sites
nemofc 0 Report post Posted January 21, 2008 Hi LINYeah 11th floor show room liao (I think fm TH)...You stay at 10th floor?Better double check for any defects. You might miss it.1) Rubber (HSS)2) Window screw3) Retractable screw (ONE POST WONDER)4) Power point5) Main Gate6) Any crack tiles in the kitchen flooron top of that;please check if the sewage cap cover is there for both toilets, else, will face the same problem as me. immediate report if there's no cap.fr TYP????i dun really understand this msg le. missing can meant misplaced also. or the renovation own guys steal it ? no further details to led on?disagree. i suspect upon collecting keys, it's missing. just like mine, sewage cap missing. Share this post Link to post Share on other sites
draught 0 Report post Posted January 21, 2008 Like to ask ah, who shd be the one doing running of electrical wiring for lighting? The lights installer or the electrician?Although our flat do not req much cabling to do, but let say we have false ceiling, the wiring shd be prep by the false ceiling guy, light installer or have to get a electrician to do? Share this post Link to post Share on other sites
xlan 0 Report post Posted January 21, 2008 if i rem correctly... my ID's electrician did tat for us.. Share this post Link to post Share on other sites
OnePostWonder 0 Report post Posted January 21, 2008 Like to ask ah, who shd be the one doing running of electrical wiring for lighting? The lights installer or the electrician?Although our flat do not req much cabling to do, but let say we have false ceiling, the wiring shd be prep by the false ceiling guy, light installer or have to get a electrician to do?wiring will be done by the electrician, but the wires will be long enough for the false ceiling ppl to adjust as required Share this post Link to post Share on other sites
msbean 0 Report post Posted January 21, 2008 (edited) see like alot of thing to look out1) Rubber (HSS)2) Window screw3) Retractable screw (ONE POST WONDER)4) Power point5) Main Gate6) Any crack tiles in the kitchen floor7)sewage cap die la I dunno what more to look out if I go to my unit , is it better to call my ID to go together at least they can hunt and find more thing isit?AIyo now waiting for HDB letter for key collection , I call HDB officer but no answer . (I just need a estimate date of collection so I can make planning) Edited January 21, 2008 by msbean Share this post Link to post Share on other sites
nemofc 0 Report post Posted January 21, 2008 see like alot of thing to look out1) Rubber (HSS)2) Window screw3) Retractable screw (ONE POST WONDER)4) Power point5) Main Gate6) Any crack tiles in the kitchen floor7)sewage cap die la I dunno what more to look out if I go to my unit , is it better to call my ID to go together at least they can hunt and find more thing isit?AIyo now waiting for HDB letter for key collection , I call HDB officer but no answer . (I just need a estimate date of collection so I can make planning)Trying calling them 8.30am, after 9am they will be busy answering phone call Share this post Link to post Share on other sites
msbean 0 Report post Posted January 21, 2008 Ok tommor I try 830am have a morning call for them Share this post Link to post Share on other sites