Jump to content
Find Professionals    Deals    Get Quotations   Portfolios
Sign in to follow this  
OnePostWonder

Newbies @ Jalan Membina

Recommended Posts

Nope ! I have sponsorship for WMF pots and pans. It comes with a steamer too.

My sponsors got it at 40% discounts. Save me a big bulk ! :P

They have a contract to fulfil so they must finish EVERYTHING before 31 Dec 2007. No choice loh. the construction was delayed for so long.

Opps. But yours light should be prettier ya if compared to Ikea.

Yeah. heard from the site construction worker, must be completed by 31st Dec 2007.

Otherwise, they will be fined $1000/day.

Hope there's no quality issues though.

 

Share this post


Link to post
Share on other sites

Join 46,923 satisfied homeowners who used renotalk quotation service to find interior designers. Get an estimated quotation

Actually i prefer the ikea ones...those i hv now were chosen by my mom n i hv to give in.

Opps. But yours light should be prettier ya if compared to Ikea.

Btw, if anyone is planning to change their current toilet bowl system, pls let me know if i can "chop" the existing one supplied by HDB. :furious: I need to replace my toilet system at another location. Been looking for this particular brand "Potex" for a period of time leow. Seems like only HDB will supply this brand. :P

 

Share this post


Link to post
Share on other sites
Yeah. heard from the site construction worker, must be completed by 31st Dec 2007.

Otherwise, they will be fined $1000/day.

Hope there's no quality issues though.

Oh is it?

$1000 a day?

I think those getting keys on Nov & Dec better check carefully for defects! Sure many defects! :P

 

Share this post


Link to post
Share on other sites
Oh is it?

$1000 a day?

I think those getting keys on Nov & Dec better check carefully for defects! Sure many defects! :wub:

Yeap, indeed.

$1000 a day may not seems so much to the developer, who may have it done in hundred of millions for the whole estate :wub:.

 

Share this post


Link to post
Share on other sites

For those checking yr defects, pls check yr store room's power point too. My power point came loose when i was trying to remove my lamp from the switch. So lousy.

 

Share this post


Link to post
Share on other sites

hi welcome to the forum!

which unit are u at?

Hi Neighbours, I'm from blk 26B. Nice to meet u all. !!

Update on Keys collection & Renovation:

BLK 25A

- redbottle (Collected)

- loobhlinda (Collected)

- pert (Collected)

- scorpy (Collected)

- gadgetgal (Collected)

- elflinks

BLK 25B

- Linggie & KhooK

- MsBean

- h4happy (likely this Dec 07 or early Jan 08)

- marksng12

- Dtkiddy & yun11

BLK 26A

- crazycar & lovey

BLK 26B

- dunkmycar

- noellechua

- lynnnie

- dorcas

- Vacis + moonbell

- owens_avenue & genevie

- skysheep

BLK 26C

- elaine1205

- ZLia

- Cindy-Monkeybone

- chewy

- kitseng

BLK 26D

- OnePostWonder

- jj2

- Princess Momo

- rommie

- binzz (3 Nov)

- kriegs

- wonsen

- Velynn

- Simpleboi

- jazznpop

- Peng*Ling (1 Nov)

- Vitamin C

- draught (30 Oct)

BLK 27A

- xlan (Collected)

- nemofc (27 Dec, pending source contractor/ ID)

- bchew

- Yang Guo (Collected)

- Seafaith

- chaq

- Jasch

- glaminn

- dashe

- saeran

- almatador

- sparey

- glaminn

- osjusti

- nitehwk (Collected)

BLK 27B

- VinceDelfino (Collected)

- Beejoy (Collected)

Went thru the list, updates for the rest also, not sure got miss out anot.. smile.gif

 

Share this post


Link to post
Share on other sites

Hi all, for key collection, is it they gif out the upper floor first then slowly go down???

Can check for those who taking key, is ur HLE letter still in force???

 

Share this post


Link to post
Share on other sites
Hi all, for key collection, is it they gif out the upper floor first then slowly go down???

Can check for those who taking key, is ur HLE letter still in force???

Dont think so.

My neighhbour getting their key soon, their block 25a!!!

 

Share this post


Link to post
Share on other sites

how about kitchen door? anyone have better suggestion than having an open "swing" door? possible to do a sliding door ? how about the switch & SCV cable there...

any suggestion? care sharing.

 

Share this post


Link to post
Share on other sites
how about kitchen door? anyone have better suggestion than having an open "swing" door? possible to do a sliding door ? how about the switch & SCV cable there...

any suggestion? care sharing.

i'm doing a sliding door.. n it is a mirror on 1 side (facing living room).. the track n pelmet is outside the kitchen.. meaning on the foyer side.. when i close the kitchen door.. the main switch box can be seen loh..

initially was another idea.. to hv a thin feature wall cover all the way frm the main door to the HBS wall.. n a flip open "catch" at the main switch box.. but doing the feature wall means additional costs.. which i cannot afford liao.. sigh.. but the idea is nice la.. !!

 

Share this post


Link to post
Share on other sites

$1k /day? so little for a big project?

$10k is more convincing...maybe they understatement a "0" :jawdrop:

Yeah. heard from the site construction worker, must be completed by 31st Dec 2007.

Otherwise, they will be fined $1000/day.

Hope there's no quality issues though.

 

Share this post


Link to post
Share on other sites

BLK 25A

- redbottle (Collected)

- loobhlinda (Collected)

- pert (Collected)

- scorpy (Collected)

- gadgetgal (Collected)

- elflinks

BLK 25B

- Linggie & KhooK

- MsBean

- h4happy (likely this Dec 07 or early Jan 08)

- marksng12

- Dtkiddy & yun11

BLK 26A

- crazycar & lovey

BLK 26B

- dunkmycar

- noellechua

- lynnnie

- dorcas

- Vacis + moonbell

- owens_avenue & genevie

- skysheep

BLK 26C

- elaine1205

- ZLia

- Cindy-Monkeybone

- chewy

- kitseng

BLK 26D

- OnePostWonder

- jj2

- Princess Momo

- rommie

- binzz (3 Nov)

- kriegs

- wonsen

- Velynn

- Simpleboi

- jazznpop

- Peng*Ling (1 Nov)

- Vitamin C

- draught (30 Oct)

BLK 27A

- xlan (Collected)

- nemofc (27 Dec, pending source contractor/ ID)

- bchew

- Yang Guo (Collected)

- Seafaith

- chaq

- Jasch (collected, pending siurce contractor/ID)

- glaminn

- dashe

- saeran

- almatador

- sparey

- glaminn

- osjusti

- nitehwk (Collected)

BLK 27B

- VinceDelfino (Collected)

- Beejoy (Collected)

how about kitchen door? anyone have better suggestion than having an open "swing" door? possible to do a sliding door ? how about the switch & SCV cable there...

any suggestion? care sharing.

nemofc.. one of the Id i went to suggest a bifold door.. or if we want a sliding door then we will have to relocate the power and scv pt at the entrance side wall of the kitchen le...

heard from the ID Biolfd door is more expensive than a sliding door... so we might just consider relocating the power pt cos the pt will not be very accessible after we place a fridge there also mah :jawdrop:

Edited by jasch
 

Share this post


Link to post
Share on other sites

Hi Neighbours, I'm from blk 27A. Nice to meet u all.

Update on Keys collection & Renovation:

BLK 25A

- redbottle (Collected)

- loobhlinda (Collected)

- pert (Collected)

- scorpy (Collected)

- gadgetgal (Collected)

- elflinks

BLK 25B

- Linggie & KhooK

- MsBean

- h4happy (likely this Dec 07 or early Jan 08)

- marksng12

- Dtkiddy & yun11

BLK 26A

- crazycar & lovey

BLK 26B

- dunkmycar

- noellechua

- lynnnie

- dorcas

- Vacis + moonbell

- owens_avenue & genevie

- skysheep

BLK 26C

- elaine1205

- ZLia

- Cindy-Monkeybone

- chewy

- kitseng

BLK 26D

- OnePostWonder

- jj2

- Princess Momo

- rommie

- binzz (3 Nov)

- kriegs

- wonsen

- Velynn

- Simpleboi

- jazznpop

- Peng*Ling (1 Nov)

- Vitamin C

- draught (30 Oct)

BLK 27A

- xlan (Collected)

- nemofc (27 Dec, pending source contractor/ ID)

- bchew

- Yang Guo (Collected)

- Seafaith

- chaq

- Jasch

- glaminn

- dashe

- saeran

- almatador

- sparey

- glaminn

- osjusti

- nitehwk (Collected)

- fat bear

BLK 27B

- VinceDelfino (Collected)

- Beejoy (Collected)

 

Share this post


Link to post
Share on other sites
nemofc.. one of the Id i went to suggest a bifold door.. or if we want a sliding door then we will have to relocate the power and scv pt at the entrance side wall of the kitchen le...

heard from the ID Biolfd door is more expensive than a sliding door... so we might just consider relocating the power pt cos the pt will not be very accessible after we place a fridge there also mah :P

But can put the glass door at the other side right? Den no need to relocate any points??

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×