gadgetgal 0 Report post Posted October 30, 2007 Nope ! I have sponsorship for WMF pots and pans. It comes with a steamer too.My sponsors got it at 40% discounts. Save me a big bulk ! They have a contract to fulfil so they must finish EVERYTHING before 31 Dec 2007. No choice loh. the construction was delayed for so long.Opps. But yours light should be prettier ya if compared to Ikea.Yeah. heard from the site construction worker, must be completed by 31st Dec 2007.Otherwise, they will be fined $1000/day.Hope there's no quality issues though. Share this post Link to post Share on other sites
bee joy 0 Report post Posted October 30, 2007 Actually i prefer the ikea ones...those i hv now were chosen by my mom n i hv to give in.Opps. But yours light should be prettier ya if compared to Ikea.Btw, if anyone is planning to change their current toilet bowl system, pls let me know if i can "chop" the existing one supplied by HDB. I need to replace my toilet system at another location. Been looking for this particular brand "Potex" for a period of time leow. Seems like only HDB will supply this brand. Share this post Link to post Share on other sites
h4happy 1 Report post Posted October 30, 2007 Yeah. heard from the site construction worker, must be completed by 31st Dec 2007.Otherwise, they will be fined $1000/day.Hope there's no quality issues though.Oh is it?$1000 a day?I think those getting keys on Nov & Dec better check carefully for defects! Sure many defects! Share this post Link to post Share on other sites
gadgetgal 0 Report post Posted October 30, 2007 Oh is it?$1000 a day?I think those getting keys on Nov & Dec better check carefully for defects! Sure many defects! Yeap, indeed.$1000 a day may not seems so much to the developer, who may have it done in hundred of millions for the whole estate . Share this post Link to post Share on other sites
bee joy 0 Report post Posted October 30, 2007 For those checking yr defects, pls check yr store room's power point too. My power point came loose when i was trying to remove my lamp from the switch. So lousy. Share this post Link to post Share on other sites
dunkmycar 0 Report post Posted October 30, 2007 hi welcome to the forum!which unit are u at?Hi Neighbours, I'm from blk 26B. Nice to meet u all. !! Update on Keys collection & Renovation:BLK 25A- redbottle (Collected)- loobhlinda (Collected)- pert (Collected)- scorpy (Collected)- gadgetgal (Collected)- elflinksBLK 25B- Linggie & KhooK- MsBean- h4happy (likely this Dec 07 or early Jan 08)- marksng12- Dtkiddy & yun11BLK 26A- crazycar & loveyBLK 26B- dunkmycar- noellechua- lynnnie- dorcas- Vacis + moonbell- owens_avenue & genevie- skysheepBLK 26C- elaine1205- ZLia- Cindy-Monkeybone- chewy- kitsengBLK 26D- OnePostWonder- jj2- Princess Momo- rommie- binzz (3 Nov)- kriegs- wonsen- Velynn- Simpleboi- jazznpop- Peng*Ling (1 Nov)- Vitamin C- draught (30 Oct)BLK 27A- xlan (Collected)- nemofc (27 Dec, pending source contractor/ ID)- bchew- Yang Guo (Collected)- Seafaith- chaq- Jasch- glaminn- dashe- saeran- almatador- sparey- glaminn- osjusti- nitehwk (Collected)BLK 27B- VinceDelfino (Collected)- Beejoy (Collected)Went thru the list, updates for the rest also, not sure got miss out anot.. smile.gif Share this post Link to post Share on other sites
jazznpop 0 Report post Posted October 30, 2007 Hi all, for key collection, is it they gif out the upper floor first then slowly go down???Can check for those who taking key, is ur HLE letter still in force??? Share this post Link to post Share on other sites
h4happy 1 Report post Posted October 30, 2007 Hi all, for key collection, is it they gif out the upper floor first then slowly go down???Can check for those who taking key, is ur HLE letter still in force???Dont think so.My neighhbour getting their key soon, their block 25a!!! Share this post Link to post Share on other sites
nemofc 0 Report post Posted October 30, 2007 how about kitchen door? anyone have better suggestion than having an open "swing" door? possible to do a sliding door ? how about the switch & SCV cable there... any suggestion? care sharing. Share this post Link to post Share on other sites
xlan 0 Report post Posted October 30, 2007 how about kitchen door? anyone have better suggestion than having an open "swing" door? possible to do a sliding door ? how about the switch & SCV cable there... any suggestion? care sharing.i'm doing a sliding door.. n it is a mirror on 1 side (facing living room).. the track n pelmet is outside the kitchen.. meaning on the foyer side.. when i close the kitchen door.. the main switch box can be seen loh..initially was another idea.. to hv a thin feature wall cover all the way frm the main door to the HBS wall.. n a flip open "catch" at the main switch box.. but doing the feature wall means additional costs.. which i cannot afford liao.. sigh.. but the idea is nice la.. !! Share this post Link to post Share on other sites
Yang Guo 7 Report post Posted October 30, 2007 I think is beside the window ceiling all the way to the tiolet door ceiling.yup yup,u r right Share this post Link to post Share on other sites
elaine1205 0 Report post Posted October 30, 2007 $1k /day? so little for a big project?$10k is more convincing...maybe they understatement a "0" Yeah. heard from the site construction worker, must be completed by 31st Dec 2007.Otherwise, they will be fined $1000/day.Hope there's no quality issues though. Share this post Link to post Share on other sites
jasch 0 Report post Posted October 30, 2007 (edited) BLK 25A- redbottle (Collected)- loobhlinda (Collected)- pert (Collected)- scorpy (Collected)- gadgetgal (Collected)- elflinksBLK 25B- Linggie & KhooK- MsBean- h4happy (likely this Dec 07 or early Jan 08)- marksng12- Dtkiddy & yun11BLK 26A- crazycar & loveyBLK 26B- dunkmycar- noellechua- lynnnie- dorcas- Vacis + moonbell- owens_avenue & genevie- skysheepBLK 26C- elaine1205- ZLia- Cindy-Monkeybone- chewy- kitsengBLK 26D- OnePostWonder- jj2- Princess Momo- rommie- binzz (3 Nov)- kriegs- wonsen- Velynn- Simpleboi- jazznpop- Peng*Ling (1 Nov)- Vitamin C- draught (30 Oct)BLK 27A- xlan (Collected)- nemofc (27 Dec, pending source contractor/ ID)- bchew- Yang Guo (Collected)- Seafaith- chaq- Jasch (collected, pending siurce contractor/ID)- glaminn- dashe- saeran- almatador- sparey- glaminn- osjusti- nitehwk (Collected)BLK 27B- VinceDelfino (Collected)- Beejoy (Collected)how about kitchen door? anyone have better suggestion than having an open "swing" door? possible to do a sliding door ? how about the switch & SCV cable there... any suggestion? care sharing.nemofc.. one of the Id i went to suggest a bifold door.. or if we want a sliding door then we will have to relocate the power and scv pt at the entrance side wall of the kitchen le... heard from the ID Biolfd door is more expensive than a sliding door... so we might just consider relocating the power pt cos the pt will not be very accessible after we place a fridge there also mah Edited October 30, 2007 by jasch Share this post Link to post Share on other sites
fat bear 0 Report post Posted October 30, 2007 Hi Neighbours, I'm from blk 27A. Nice to meet u all. Update on Keys collection & Renovation:BLK 25A- redbottle (Collected)- loobhlinda (Collected)- pert (Collected)- scorpy (Collected)- gadgetgal (Collected)- elflinksBLK 25B- Linggie & KhooK- MsBean- h4happy (likely this Dec 07 or early Jan 08)- marksng12- Dtkiddy & yun11BLK 26A- crazycar & loveyBLK 26B- dunkmycar- noellechua- lynnnie- dorcas- Vacis + moonbell- owens_avenue & genevie- skysheepBLK 26C- elaine1205- ZLia- Cindy-Monkeybone- chewy- kitsengBLK 26D- OnePostWonder- jj2- Princess Momo- rommie- binzz (3 Nov)- kriegs- wonsen- Velynn- Simpleboi- jazznpop- Peng*Ling (1 Nov)- Vitamin C- draught (30 Oct)BLK 27A- xlan (Collected)- nemofc (27 Dec, pending source contractor/ ID)- bchew- Yang Guo (Collected)- Seafaith- chaq- Jasch- glaminn- dashe- saeran- almatador- sparey- glaminn- osjusti- nitehwk (Collected)- fat bearBLK 27B- VinceDelfino (Collected)- Beejoy (Collected) Share this post Link to post Share on other sites
binzz 10 Report post Posted October 31, 2007 nemofc.. one of the Id i went to suggest a bifold door.. or if we want a sliding door then we will have to relocate the power and scv pt at the entrance side wall of the kitchen le... heard from the ID Biolfd door is more expensive than a sliding door... so we might just consider relocating the power pt cos the pt will not be very accessible after we place a fridge there also mah But can put the glass door at the other side right? Den no need to relocate any points?? Share this post Link to post Share on other sites