hello, to-be-neighbour.

mine's 4 room n high floor. :dunno: already got my keys... n now still sourcing for ID.

good luck & happy searching... :D

yes, found some defects, and have put up photos earlier in this thread.. haha, maybe i am too ngiao, small small things also listed as defects :P ... after submitted my defect list, i found some more defects (loose door handle and the toilet floor traps cannot be opened)... need to call the branch office tmr to check if can add to the list or not... :dunno:

so did the brach office accept the liability based on the list of defects you've given them?

 

Share this post


Link to post
Share on other sites

Join 46,923 satisfied homeowners who used renotalk quotation service to find interior designers. Get an estimated quotation
Wow good luck and do remember to hunt for more id/contractors.

Bear in mind this (thru my experience), if you just want a plain, move in conditions or very little design/features, then fgo for contractors, no point paying id for contractors work.

But if you want features, designs...then go for id....

Btw, this morning I was at the bus stop, saw most of the blk already painted except blk25b and inner blocks.

Wow, guess this coming sat, more and more units are going full force...

Mine still waiting........ for the key.............. :dunno:

I might take some photos outside the bus stop if the rain is stopped and post it here ok?

But not go inside cos scare of those touting uncles.

Hi,

Is block 26B still having those barricades? Was wondering whether i sld drop by one day to have a look. Seems like you guys have been going to the showflat there often.

I just got my first draft from my ID. Still got alot to amend. Agreed with h4happy's comment on the searching of ID/contractors.

 

Share this post


Link to post
Share on other sites
Did anyone engage Tong Hong Renov? Any feedback abt their work? I will be getting quot from Meng Design as well. Still waiting for their Quot.

Tong Hong never ask them, first wncountered with one of the uncle piss me off........

Hey I heard that there is one contractor is now renovating....dont know which floor, from wonderhouse???

How is their worksmanship?

Good?

 

Share this post


Link to post
Share on other sites
dear all,

a quick qn- do contractors lay a plastic sheet followed by the cardboard or just the cardboard? which is the industry practice to protect your floorings?

thanks!

Hi Linggie,

They normally use special cardboard to protect the flooring. Make sure you dont let them remove them prematurely.

 

Share this post


Link to post
Share on other sites
yes, found some defects, and have put up photos earlier in this thread.. haha, maybe i am too ngiao, small small things also listed as defects :P ... after submitted my defect list, i found some more defects (loose door handle and the toilet floor traps cannot be opened)... need to call the branch office tmr to check if can add to the list or not... :dunno:

it's not ngiao, you are entitled for a good satisfying and fit to live in house after paying so much. any scratch or whatsoever defects should be reported directly,.. as long as it is before the reno (HDB Branch office told me so after my feedback saying the 7-days limit seems ridiculously short).

 

Share this post


Link to post
Share on other sites
so did the brach office accept the liability based on the list of defects you've given them?

no news from them yet, except to call to confirm that i have passed the key to the branch office...

i called the branch office hotline to ask if can add to the defect list after submission... the reply is yes, can add... can either call the TO-in-charge or fax in to bt merah branch office or report to the BSC at 27b... :)

 

Share this post


Link to post
Share on other sites
Hi,

Is block 26B still having those barricades? Was wondering whether i sld drop by one day to have a look. Seems like you guys have been going to the showflat there often.

I just got my first draft from my ID. Still got alot to amend. Agreed with h4happy's comment on the searching of ID/contractors.

Hi Neighbours,

Hi Dorcas,

Any news for 26B? Any indication from the workers there? Seems like the 1st Oct deadline for the main contractor for the whole estate will not be adhere to. Just hoping to start my reno by Christmas!:)

Ho Ho Ho!

 

Share this post


Link to post
Share on other sites
no news from them yet, except to call to confirm that i have passed the key to the branch office...

i called the branch office hotline to ask if can add to the defect list after submission... the reply is yes, can add... can either call the TO-in-charge or fax in to bt merah branch office or report to the BSC at 27b... ;)

how long do they need to replace the defects? 7 days as well? :)

 

Share this post


Link to post
Share on other sites
how long do they need to replace the defects? 7 days as well? :dunno:

i think there is no mention on the time needed for rectification... but usually 2 to 4 weeks depending on the extent of work needed to be done...

 

Share this post


Link to post
Share on other sites
Hi, neigbours, my unit is at 26D also..

I thought it may be easier to find our fellow neighbours if consolidated in a list those mentioned in here..

See below:

  1. green_tranquility - Blk 25
  2. dunkmycar - Blk 26B
  3. noellechua - Blk 26B
  4. lynnnie - Blk 26B
  5. elaine1205 - Blk 26C
  6. OnePostWonder - Blk 26D
  7. Princess Momo - Blk 26D
  8. rommie - Blk 26D
  9. binzz - Blk 26D
  10. nemofc - Blk 27A
  11. bchew - Blk 27A
  12. Yang Guo - Blk 27A

  13. hasibee - Blk 19 - new addition

 

Share this post


Link to post
Share on other sites

Hi HASIBEE

Tried to look at the beehive at Ctrl sg but unable to see the pic...

Dont know why.

You have already finish your 5 room renovation? (as seem in your signature remarks).

Can we tour your house?

Best Regards.

HAPPY

 

Share this post


Link to post
Share on other sites
Hi HASIBEE

Tried to look at the beehive at Ctrl sg but unable to see the pic...

Dont know why.

You have already finish your 5 room renovation? (as seem in your signature remarks).

Can we tour your house?

Best Regards.

HAPPY

Bro, he's @ block 19 lah

 

Share this post


Link to post
Share on other sites
Hi Neighbours,

Hi Dorcas,

Any news for 26B? Any indication from the workers there? Seems like the 1st Oct deadline for the main contractor for the whole estate will not be adhere to. Just hoping to start my reno by Christmas!:notti:

Ho Ho Ho!

Hi Vacis,

I am not sure too. Me also wish to start reno immediately. I even wish to stay there to celebrate our first anniversary with my hubby. Sigh!

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×