harky 1 Report post Posted August 7, 2020 (edited) Hi all... I got a 30yr old resale flat which the kitchen wall is half tiles. I had a idea is i dont want the kitchen to be full tiles.. and only want the center part to be tiled on both side (as part of the wall design and also for kitchen cooking/sink backing) . Will only had bottom cabinet, no top cabinet. Full wall will need to do plastering as i want center tiles & wall to be leveled. Will also overlay the floor tiles. 1. Do u think is idea that i remove the half tiles myself and ask contractor to plastering it ?? Because i see most pic, some kitchen which is half tiles, the contractor dont hack the one without tiles.. 2. If ask them to do remove the half tiles... they will charge me FULL WALL? Edited August 7, 2020 by harky Share this post Link to post Share on other sites