Vessel 0 Report post Posted May 24, 2007 Hi forumer,I just want to have a clear idea wat is defects?? 1) Toilet flooring and wall tiling not wash and have white cement stain all over?? 2) Do contractor clean up ur winodw grille clean up ur wall when they wanna hand over to u??3) If there a small chips or crack somewhere, is that a defects??4) Can i take photo of the defects and show to them in writing and have a deadline to complete??5) Should the deadline not completed can i forfeit the remaining amount?? (Eg. left 5 to 10% of the total sum)6) Kitchen wall and flooring not clean up properly as white stain found? is that a defects??7) Wat do the contractor need to do when they are to hand over?? 8) when hand over house wat r the things need to check??? izit suppose to be veri clean wif no dirt stain etc..Thank you Share this post Link to post Share on other sites
HSH21 1 Report post Posted May 24, 2007 (edited) izit suppose to be veri clean wif no dirt stain etc..For me .... Yes... my house is in that condition when the ID handed over... I only need to clean the internal of the capentary ...and I didn't find chip off anywhere...Btw... is your contract stated chemical wash or only general cleaning... chemical wash suppose to remove the white cement... not too sure about general cleaning... Edited May 24, 2007 by HSH21 Share this post Link to post Share on other sites
stdout 0 Report post Posted May 26, 2007 For me .... Yes... my house is in that condition when the ID handed over... I only need to clean the internal of the capentary ...and I didn't find chip off anywhere...Btw... is your contract stated chemical wash or only general cleaning... chemical wash suppose to remove the white cement... not too sure about general cleaning...vincent??? Share this post Link to post Share on other sites
Devilaz 0 Report post Posted May 26, 2007 Hi forumer,I just want to have a clear idea wat is defects?? 1) Toilet flooring and wall tiling not wash and have white cement stain all over?? who had make the white cement? From HDB contractor or ur renovator?2) Do contractor clean up ur winodw grille clean up ur wall when they wanna hand over to u??if they had provide a general cleaning then they will clean the grills for ur house3) If there a small chips or crack somewhere, is that a defects??cracks as in where?by default from HDB or was being done by ur renovator?4) Can i take photo of the defects and show to them in writing and have a deadline to complete??it really depends on who is at fault. If HDB, will be good to call town council and get them do to it asap.if it ur renovator then call and tell them to come down and see for themselves.5) Should the deadline not completed can i forfeit the remaining amount?? (Eg. left 5 to 10% of the total sum)it depends on how bad is the situation. if really that bad, then it will be good to tell them to all the things finish before paying them the money.6) Kitchen wall and flooring not clean up properly as white stain found? is that a defects??white stain as in? can it be clean off easily? if yes then not as a defect. if not ask ur renovator to settle for u.7) Wat do the contractor need to do when they are to hand over?? well all the things that you had pass to them before hand. and documents from them that the payment had 100% being settle.sign by both parties.8) when hand over house wat r the things need to check??? izit suppose to be veri clean wif no dirt stain etc..there are two types of wash chemical wash and general wash. chemical wash is mainly for tiles. general wash will be only the external cleaning part. internal as in cabinet, shelves will not be clean.Thank youhope it helps to solve on ur doubt. Share this post Link to post Share on other sites
HSH21 1 Report post Posted May 26, 2007 vincent??? What is this ?? don't understand... Share this post Link to post Share on other sites