summerrr 0 Report post Posted January 5, 2020 Hi guys, renovated my BTO flat 2 years back. so back then i did an overlay of the floor tiles over the hdb tiles. however i recently realised that there is a corner of the toilet where there is ponding during to floor gradient problem. So now i am considering to re-do my bathroom floor ties to solve the ponding issue. is it possible to just hack the overlay tiles and keep the original hdb tiles intact? will my waterproofing membrane be affected? or if i were to really re-do my flooring i have tp hack everything away, re-do the waterproofing as well? anyone done this before? Share this post Link to post Share on other sites
kangeroo168 10 Report post Posted January 30, 2020 yes you can hack away the top tile, but of cos, you must overlay with new tiles after the works. of cos, there is a small chance that the waterproofing might be damaged.. but it all depends on how the overlaid tiles are installed. Share this post Link to post Share on other sites