hello88 2 Report post Posted August 8, 2007 Hi there, I am new here.I just brought a EM at Serangoon North. I also need to renov the whole place. Have not go for first appoint yet.But I have very tight budge cos paid $25k above valuation. Thinking of changing the whole house flooring. construct a new toilet at first floor.Can anyone share your designer layout of the EM..Got no $$ to get designerhey, jio u over to our EM thread over at HDB New/Resale Flats, Executive Condominiums. Click on EM owners under my signature. Then those in the thread can advise u. Share this post Link to post Share on other sites
shmj 0 Report post Posted August 8, 2007 Wah! yr toilet tiles berry nice leh! Share this post Link to post Share on other sites
BhongNCorrine 0 Report post Posted August 8, 2007 hey, jio u over to our EM thread over at HDB New/Resale Flats, Executive Condominiums. Click on EM owners under my signature. Then those in the thread can advise u.wow, didn't jio me ...and still dare to steal my customer !! welcome WelcomeHome ...... hmmmmm ..... Share this post Link to post Share on other sites
WelcomeHome 0 Report post Posted August 8, 2007 wow, didn't jio me ...and still dare to steal my customer !! welcome WelcomeHome ...... hmmmmm ..... Thanks... I want to construct a toilet at the first floor. just spoken to HDB staff, all kitchen needs to be water proof.... Oh that is new. I cannot remember whether I did that for my exisitng flat..Wow.. sometime really think why I want to move.. Share this post Link to post Share on other sites
hello88 2 Report post Posted August 8, 2007 (edited) wow, didn't jio me ...and still dare to steal my customer !! oops oops, thought u already 'old bird' and also u got a T-blog already. Lai Lai Lai, all welcome to go to EM thread. Thanks... I want to construct a toilet at the first floor. just spoken to HDB staff, all kitchen needs to be water proof.... Oh that is new. I cannot remember whether I did that for my exisitng flat..Wow.. sometime really think why I want to move..construct toilet at 1st floor quite easy la. They merely need to apply for HDB approval. I also did that so now I got 3 toilets to wash, 3 toilet for all family members to bathe as installed instant heater for all 3. Edited August 8, 2007 by hello88 Share this post Link to post Share on other sites
hello88 2 Report post Posted August 9, 2007 included u in our EM thread liao. See ya in EM thread Share this post Link to post Share on other sites
BhongNCorrine 0 Report post Posted August 10, 2007 included u in our EM thread liao. See ya in EM threadthk u ...thk u .... Share this post Link to post Share on other sites
BhongNCorrine 0 Report post Posted August 16, 2007 R-Day 40~~~~~~Finally, the plastering works are done. and that is the most messy work that i have seen ....I thought my bedroom, which i am staying now, is messy.Those plastering workers are really everywhere, even the tiler (ah wee) is shaking his head.Electrical work comes after the plastering works.....1 more day the electrical work will be done ..... Share this post Link to post Share on other sites
BhongNCorrine 0 Report post Posted August 16, 2007 (edited) sloopy window job ......... chipped-off grooveDented window panel ... Edited August 16, 2007 by BhongNCorrine Share this post Link to post Share on other sites
applefreak 1 Report post Posted August 16, 2007 that looks bad must die die make them redo Share this post Link to post Share on other sites
jamez 0 Report post Posted August 16, 2007 agreed.this is unacceptable standard. Share this post Link to post Share on other sites
eR1c 0 Report post Posted August 16, 2007 how come got dent?they use tools to pry it in ar?? Share this post Link to post Share on other sites
BhongNCorrine 0 Report post Posted August 17, 2007 how come got dent?they use tools to pry it in ar??not sure .... but my guess is mishandling during transportation and installation ....the worst ...they try to hid it ..... most of the dent is found on the outside facing of the window .....!! The aircon is UP .....and i must say .... quite a neat job by the GainCity's technician .... 3 cheers .... for the technicians .... Share this post Link to post Share on other sites
hello88 2 Report post Posted September 6, 2007 Hi,long time no update your T-blog. Reno should have been completed or near completion right? Love to see some pic soon Share this post Link to post Share on other sites
BhongNCorrine 0 Report post Posted September 9, 2007 (edited) Hi .....Was very very very ...... busy with work ...kena sent oversea twice in less than 2 mths ....don't even have time to look at the reno process ....C is the one who is doing the follow up .........and she is singing "Face black black " ..... liao ...everyone in the office is asking me how's my reno ...i was telling them ... i am not very sure .....scully, everyone moved into the new house liao ....i also .....DUNO ........ Edited September 9, 2007 by BhongNCorrine Share this post Link to post Share on other sites