Jazz91 0 Report post Posted December 20, 2018 Hi, where did you get the dining table from? Share this post Link to post Share on other sites
jem 5 Report post Posted December 20, 2018 6 hours ago, Jazz91 said: Hi, where did you get the dining table from? Greyhammer. They are having sale now!!! Share this post Link to post Share on other sites
jem 5 Report post Posted December 21, 2018 Additional Box Up done today. So much difference in the look of the area. Impt to have ID who is flexible and have the staff to help do extras when required. Share this post Link to post Share on other sites
jem 5 Report post Posted December 21, 2018 (edited) ID brought us to factory to see large pieces of quartz to choose the design and cutting pattern of material from the large sheet. We saw a new material called Vulcan. We tried to cut it and it was really scratch resistant. Super nice design and patterns available, we did not take a second look at the quartz. We ended up buying the new Vulcan porcelain top. Have to top up cost too ? The patterns in the material and the matte black and white are super awesome. Do check it out at Lian Hin! Edited December 21, 2018 by jem Share this post Link to post Share on other sites
jem 5 Report post Posted December 21, 2018 Next to Kompacplus to see the large sheet of the material. Super friendly sales staff got the workers to pull out some samples. We know what we want for our bay window! Share this post Link to post Share on other sites
jem 5 Report post Posted December 22, 2018 Hall Cabinet is done!! Awesome workmanship! Share this post Link to post Share on other sites
jem 5 Report post Posted December 22, 2018 Kitchen Frame is up! Waiting for the Vulcan top to come in! Share this post Link to post Share on other sites
brokenx 0 Report post Posted December 23, 2018 On 12/20/2018 at 7:44 PM, jem said: Greyhammer. They are having sale now!!! hi, possible to PM the price? Share this post Link to post Share on other sites
jem 5 Report post Posted December 24, 2018 Toilet fittings and toilet bowl installed today! Share this post Link to post Share on other sites
jem 5 Report post Posted December 24, 2018 Painting also done. Vinyls are delivered today. Installing on Wednesday. Share this post Link to post Share on other sites
jem 5 Report post Posted December 26, 2018 Laying of Floor Vinyls today. So far on schedule. Good job by ID to follow up with the different contractors. Share this post Link to post Share on other sites
jem 5 Report post Posted December 27, 2018 Shower Screens are up! Share this post Link to post Share on other sites
jem 5 Report post Posted December 29, 2018 Hall is done!! Kompacplus is in. Niceeeee! 1 Share this post Link to post Share on other sites
jem 5 Report post Posted December 29, 2018 (edited) White PD door for the master toilet! The Louvre looks great! Edited December 29, 2018 by jem Share this post Link to post Share on other sites
jem 5 Report post Posted December 29, 2018 Black PD door for the toilet! Love the contrast! Share this post Link to post Share on other sites