Jump to content
Find Professionals    Deals    Get Quotations   Portfolios
Sign in to follow this  
Hanna

5A resale flat with a budget (without ID)

Recommended Posts

After 12years, we decided to sell our current home and bought a 5A resale flat. After viewing for at least 5houses, we’ve settled for this house which is nearer to MRT but condition was seriously horrible. (By the way, we are diy buyer doing contra)

Long story short, after receiving about 10quotations, we knew we had to go for a contractor, it can save us 10-20k! 

Theme: “my style” — I see, I like, I buy

My second home should be something simple. I have always wanted the white look (for current house) but with 2babies of couse it’s impossible. So now that they’re in primary schooler, I will try to archieve that look.

Ok, I’ll try.... but er, definitely no white kitchen as I cook everyday. 

 

 

AB330703-3835-4B72-8E11-4977979F1778.jpeg

Edited by Hanna
 

Share this post


Link to post
Share on other sites

Join 46,923 satisfied homeowners who used renotalk quotation service to find interior designers. Get an estimated quotation

I have actually started with my renovation works. Should be ready (MUST BE READY) by 27th march or I will have nowhere to stay! I need to hand over keys to new owner of my current house by 28march. Yes, we requested for extention of stay since we were the contra party. 

 

 

Share this post


Link to post
Share on other sites

Tampoi Lighting Centre:

Bought —>

25 LED downlights

1 x fan with light (study room)

1 x ceiling light with 4 colour light (kitchen)

3 x ceiling light (bedrooms)

3 x small ceiling light (toilet and store room)

will be going again to grab this grey Elmark 52” ceiling light for living room and T5s.

0D90410A-3969-407C-A996-9B3FE381004C.jpeg

D7DABEE8-9F97-4DBA-A8D1-22AB820F5CFB.png

 

Share this post


Link to post
Share on other sites

Electrical works done ✔️

Hacking all done ✔️

Cement screed/ plaster wall done ✔️

Box up toilet piping and hollow walls done ✔️

5A73D0F1-02D6-4278-AEC1-0C8CBA1599EC.jpeg

1D72D67D-F9B6-49A4-94FB-E8C77AAE2E50.jpeg

4C0510DA-9EAC-402F-BD48-218E06DA218A.jpeg

681933DF-F7EE-49AA-A1F1-2CB9DD8D00DA.jpeg

 

Share this post


Link to post
Share on other sites

All ID exceeded our budget. 

3contractors shortlisted. Arranged for meet up at my house.

Why I picked contractors over IDs? 

Significant savings. All 3contractors quoted me about the same price.

 

...After adding in items last minute (boxing up pipes/ walls, etc), D941AAD2-FD45-4228-9C39-0B266A26C8F3.jpeg.bb04cd883302c4aedbe4d39ae705df21.jpeg183EDA0A-7B26-470D-B5CB-4A8133D72006.jpeg.1546ef7cbf5bd418e1030a0ab8a00836.jpegI raised my budget up alittle bit...

.. And alot of touching up as this house was covered with wallpapers. Never buy a house with wallpapers, you might never know what they’re hiding behind it. Holes! Cracks! 

 

 

 

 

 

Edited by Hanna
 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×