Jump to content
Find Professionals    Deals    Get Quotations   Portfolios
Sign in to follow this  
JoanneNg

3 Bedroom Penhouse

Recommended Posts

Hello everyone! 

My husband and I just got the keys to our penthouse. It's the first time we're actually so involved in the renovation. So excited and we can't wait to move into our new home! We have been reading the forum to do our research diligently. Thank you everyone for sharing your experience with us! Now it's our turn to journal down our renovation journey in this t-blog. 

Here goes our floor plan:

5a829e2e91866_12-01.jpeg.8f57d6c0d9c8db326b6e73284c2b02d4.jpeg

 

 

Rooftop.jpeg.8bbecc46e51eb47605639a2aca580ed6.jpeg

 

 
  • Like 1

Share this post


Link to post
Share on other sites

Join 46,923 satisfied homeowners who used renotalk quotation service to find interior designers. Get an estimated quotation

Time Constraint

We confirmed the purchase in late Dec & at around the same time we had found a buyer for our current unit, and we will need to vacate by 30th Apr, however the ph owner will only handover on 7th Feb. We intend to redo the whole house but the time is very tight, fingers crossed! So we wasted no time in finding a suitable contractor/designer, I actually intended to meet about 6 contractors/designers. But hubby said no, knowing how fickle minded I was, so we decided 3 is the max.

Contractors

  1. Uncle Leng from Poh S**** Design - Recommended by my friend. The contractor is very prompt in replying and follow up closely. The quotation is reasonable but it comes in lump sum total cost for each component of carpentry work, renovation work and etc instead of individual cost. We felt that there are lack of details and transparency in cost in the event that we decided to change certain requirement in our renovation. Only speaks Chinese.
  2. Ed**** from * and E - Got their contact through forum. Able to answer every question we throw at him, very experience. Do not provide any design inputs, more like a "I just do what you need" attitude. Quotation came 5 days later, after we reminded him everyday. Requested him to make a few amendments and the next quotation never came. WhatsApp took a long time to reply, after that I gave up.

Designer

  1. L** from A*** Design - Recommended by my friend who got her ph done by them too. Met him and his designer at their showroom in Dempsey Hill. He took a quick glance and offered us on what theme to do while the designer took down plenty of notes, I actually wanted Peranakan but he insisted on more of a posh style of feel. I wasn't too pleased but he slowly convinced me that this house should be designed in a way to bring out the whole feel. He told us he will return with a quotation, the meeting ended in 20 minutes without hubby and me saying much. Totally different experience from the contractors, but my friend assured this is how they work, so we decided to wait and see. 
 

Share this post


Link to post
Share on other sites

Follow up meetings on 19th Jan

  1. Uncle Leng final price was very competitive, however like I mentioned many things was under "Lump Sum". There was no measurements in the wardrobe all these, but he promised everything is can do. -.- 
  2. L met us at his restaurant (yes he runs a restaurant too), he provided us with a 90% accurate quotation list and 4x 3d drawings when we haven't confirm anything with him. We only realise the girl with him was actually in charge of design, and after that we created a group chat with the 4 of us inside. Whatever changes we wanted was done promptly, and we only managed to meet them on 15th Jan. Hubby and I was impressed that in the span of 4 days, they managed to do so much. We hoped they can bring such efficiency to the renovation process and we signed up with them the next day.
 

Share this post


Link to post
Share on other sites

19th Jan Follow up meetings

  1. Uncle Leng final price was very competitive, however like I mentioned many things was under "Lump Sum". There was no measurements in the wardrobe all these, but he promised everything is can do. -.- 
  2. L met us at his restaurant (yes he runs a restaurant too), he provided us with a 90% accurate quotation list and 4x 3d drawings when we haven't confirm anything with him. We only realise the girl with him was actually in charge of design, and after that we created a group chat with the 4 of us inside. Whatever changes we wanted was done promptly, and we only managed to meet them on 15th Jan. Hubby and I was impressed that in the span of 4 days, they managed to do so much. We hoped they can bring such efficiency to the renovation process and we signed up with them the next day. These are the 3d drawings:

 

Master Bathroom

 

5a82ab0161f6c_WhatsAppImage2018-02-13at4_03_20PM.jpeg.184a9e398f8faca6e74a63540484d65c.jpeg

 

Living Hall

5a82ab428be73_WhatsAppImage2018-02-13at5_09_05PM.jpeg.cbbfdcebfeb4d28865b726acc4a1ddd4.jpeg

 

Kitchen

5a82ab0214657_WhatsAppImage2018-02-13at5_06_16PM.jpeg.98503b682022888f6887a73a4d19a6e9.jpeg

 

Master Bedroom

5a82ab007796f_WhatsAppImage2018-02-13at4_03.20PM-2.jpeg.7e7094b5a088afa54d84f5a1fe905895.jpeg

 

Roof Terrace

5a82ab00e2828_WhatsAppImage2018-02-13at4_03.20PM-3.jpeg.c510a8a5aebe388aa16ef3912d6e15e4.jpeg

Edited by JoanneNg
Typo
 

Share this post


Link to post
Share on other sites

6th Feb 18 Key Collection

The day we have been waiting for . . . . . . .

 

Living Room

  • Will be dismantling all the wall laminates and carpentry

5a841cfe59ffe_WhatsAppImage2018-02-14at7_14_36PM.jpeg.41c866c929502fed8ef0798bce716c84.jpeg

 

Master Bedroom

  • Removing all carpentry

5a841cff45217_WhatsAppImage2018-02-14at7_14_44PM.jpeg.8eef21cc37ee84ad3b683de3424f4441.jpeg

 

WhatsApp Image 2018-02-14 at 7.20.03 PM.jpeg

 

Master Bathroom

  • Sorry bathtub, I have never liked you 

5a841cfed1152_WhatsAppImage2018-02-14at7_14.44PM-2.jpeg.80cb4f739b13b1fb339c1e8e5a2ae686.jpeg

 

Daughter's Room

5a841cffc1252_WhatsAppImage2018-02-14at7_14.45PM-2.jpeg.46e62cdadecf46bca1e3cc7858b121ca.jpeg

 

Common Toilet

  • Tiles cracking up, mirror far too huge.
  • Hacking everything

5a841d00433be_WhatsAppImage2018-02-14at7_14_45PM.jpeg.c6523695ddd5637e5ecb43fbc77963ec.jpeg

Edited by JoanneNg
 

Share this post


Link to post
Share on other sites

7th Feb 18 9AM - Site visit

After dropping my kids for school, I drop by about 9AM. Guessed what I saw, everyone is there and already put up all the protection and ready to go. So much difference in efficiency compared to my previous contractor. So after the project manager of the id firm finishing giving instructions, I left site with him.

5a841f614d0a8_WhatsAppImage2018-02-14at7_36_40PM.jpeg.f2282130ead0fa5921f59c026ff7bb3c.jpeg

 

7th Feb 18 5PM - Site visit

After picking hubby from work, we went to take a look as we were nearby.

 

Kitchen is beyond recognition. HAHAHAHA:D

5a8421252dbbf_WhatsAppImage2018-02-14at7_42_34PM.jpeg.4d55536274dab790beecf26abbcff4e0.jpeg

 

Bathrooms all equipped with water heater, looks very new. So we decided to re use it.

5a842125bac56_WhatsAppImage2018-02-14at7_42_35PM.jpeg.cabdccad2fe615a856cf63937640acda.jpeg

 

5a8421264d4dc_WhatsAppImage2018-02-14at7_42_36PM.jpeg.660acd0861a675e3f2114431287602ed.jpeg

 

5a842126b8fb6_WhatsAppImage2018-02-14at7_42_37PM.jpeg.903b82a187fe61c40fad2a15a14e2116.jpeg

 

Bathtub also gone

5a8421f2bb817_WhatsAppImage2018-02-14at7_47_32PM.jpeg.69ef2ceb29e101e81dd151c1b7269770.jpeg

 

There was this ugly basin for clothes washing, gone.

WhatsApp Image 2018-02-14 at 7.42.38 PM.jpeg

Edited by JoanneNg
 

Share this post


Link to post
Share on other sites

12th Feb 18

As promised by ID firm, we will complete hacking before CNY which is delivered. As the timing is very tight and we only have free time on weekend, we went to choose tiles quickly at Hafary. Given the amount of tiles we needed to buy, it only took us about an hour. Because ID had already shortlisted for me and hubby, really good service I think. I forgot to take photo of the whole piece of tiles as I was too busy, I only have these samples to show for.

 

This is for the the roof area where the artificial grass is, then we just put on top. Black and white marble, I like!

5a8424abbbe80_WhatsAppImage2018-02-14at7_57.02PM-2.jpeg.5384141cec122f346415a4a89dd87dd0.jpeg

 

Then ID suggested kids can have a more fun featured wall in the bathroom. So the colourful mosaic

5a8424ac5e396_WhatsAppImage2018-02-14at7_57_02PM.jpeg.3d0c8b8c325b8a17db144dab3019bc8e.jpeg

WhatsApp Image 2018-02-14 at 7.57.01 PM-2.jpeg

WhatsApp Image 2018-02-14 at 7.57.01 PM.jpeg

Edited by JoanneNg
 

Share this post


Link to post
Share on other sites

Hi Joanne Ng,  

Wonderful your updates, don't mind share me the contractor contact details with company name,

is the job carryout by L?? pls Pm me.

thanks in advance.

 

 

Share this post


Link to post
Share on other sites

Hi Joanne,

nice post and nice ID u have! May I have the contact information of your contractor pls? Thanks!

Edited by Yy2008
 

Share this post


Link to post
Share on other sites

Hello happy new year all readers,

Work has resumed on 3rd day. However I was on holiday, but I was updated daily on the progress. I only managed to visit today, and these are some of the works done.

I delayed quite a lot of their work, because I did not purchase any basin or w/c. Now I'm in deep ****.

However they did what they could, like most of the electrical, aircon, water pipes & tiling works . . . .

I bought the Peranakan tiles because it was nice however it doesn't really match the theme, but still designer said we can try to blend it in.

5a992b558dc9f_WhatsAppImage2018-03-02at6_40.02PM-2.jpeg.49d3a92921be557c1a3127241c271d81.jpeg

 

And my $14 mosaic   . . . . . . . .

5a992b5614572_WhatsAppImage2018-03-02at6_40_02PM.jpeg.1e0bd620a0eda72f4d27a3b03346e8ba.jpeg

 

Sigh now I'm so worried I can't move in time, because some of the work couldn't move on as planned. They couldn't install w/c, rain shower etc.

Edited by JoanneNg
 

Share this post


Link to post
Share on other sites

Start of this week,

I quickly went to purchase all the tapware, W/C, basin etc etc.

Luckily a lot of time was saved because ID has already shortlisted for me according to the measurements . We just need to basically go down to the shop and . . . . . . . pay.

As of today, 

My full marble bathroommmmmmmm.

 

5aa285f77576e_WhatsAppImage2018-03-09at9_01_47PM.jpeg.901560e0c82c6228e88f0cea6d5f8e46.jpeg

 

My impromptu breakfast table tiles.

 

5aa285f6d8c26_WhatsAppImage2018-03-09at9_01.47PM-2.jpeg.e4acac3bbd42c553c09a2d362925a0e1.jpeg

 

Share this post


Link to post
Share on other sites

Hello all, I've been away for holiday as it school holiday. But anyway I went up to take a look today and took some photos.

Basically all my equipments are there and partition and painting works done. I might be able to move in just before deadline. As updated by ID, tomorrow we will finish installing all the cabinets, then work is almost done. Will update tomorrow 

0ED3DC41-5B79-4A4A-9D3D-51691AD7C277.jpeg.9ba9c1cb70e7debd36e2cd451b2094c4.jpeg3449FB1F-A684-45D8-BA8B-2B391E0691BD.jpeg.ff2afeec1fa0de0b5567d011d2b0d978.jpegD4CD3F09-064B-4B53-97B5-16FCBFECCFAA.jpeg.5822c7373330158c1ec2d620f1b16e98.jpegC1CAA107-4759-44D6-9DD4-8EA654E5DE93.jpeg.53a9b78e9552b53f9f0bc4f9004dcc5d.jpegBA515B0C-6D31-4BA7-9C5E-4B0D12E94143.jpeg.c7ca921d1eb3f95ec97d8c1cd43e6e5d.jpeg0263C3C1-3E8C-4529-BAFA-FD5BA50C6312.jpeg.8557e847b9c469b57261f6fb407d8b79.jpeg549A3359-3748-461C-9534-50177AF37B2E.jpeg.30dfde59799dfcd2128b9bec2071d96e.jpeg

 

Share this post


Link to post
Share on other sites

Hi Joanne,

can u pls share which ID do u engage? I’m looking for an ID for my bto and yours seems doing a great job!

thanks

yy

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×