bovi 0 Report post Posted July 3, 2017 (edited) On 01/07/2017 at 11:43 PM, Ecnalx said: Hi The entire kitchen will be covered by 4 glass panels of doors. They will be made of aluminium, so that they can be light enough to be top hung. Looking into the kitchen, the 2 panels on the left will be a foldable door. The most right panel will be a fixed door, and the 2nd panel from the right will be a sliding door (together with the most right panel). It is quite hard to illustrate, and will be easier if I just upload the pictures when installation is done next week. We relay the requirements to my contractor and he will be settling the measurement, procurement and installation. very interesting, cant wait for the pictures. thanks again! Edited July 3, 2017 by bovi Share this post Link to post Share on other sites
shuang 0 Report post Posted July 5, 2017 Hi, could you send me details of your contractor and those unselected contractors as well? Thanks! Share this post Link to post Share on other sites
Ecnalx 4 Report post Posted July 5, 2017 5 hours ago, shuang said: Hi, could you send me details of your contractor and those unselected contractors as well? Thanks! PM-ed. Share this post Link to post Share on other sites
Nasril11 0 Report post Posted July 9, 2017 Hi Ecnalx, can I have the contacts for contractor N and PTL (fb page name?) for their project viewing. Thank you! Looking forward to your complete reno journey, yr living rm is how I want mine to be too. Share this post Link to post Share on other sites
Ecnalx 4 Report post Posted July 9, 2017 5 hours ago, Nasril11 said: Hi Ecnalx, can I have the contacts for contractor N and PTL (fb page name?) for their project viewing. Thank you! Looking forward to your complete reno journey, yr living rm is how I want mine to be too. PM-ed. Share this post Link to post Share on other sites
saura 0 Report post Posted July 13, 2017 Hi, Mind sharing your contact for the shortlisted and chosen contractor? Thanks! Share this post Link to post Share on other sites
Ecnalx 4 Report post Posted July 13, 2017 7 hours ago, saura said: Hi, Mind sharing your contact for the shortlisted and chosen contractor? Thanks! PM-ed. Share this post Link to post Share on other sites
NiVleK 0 Report post Posted July 17, 2017 Interesting! Like the way you going for the smart home concept. My new place is also at the north! Hope the move from the west to the north is a good one. Haha Share this post Link to post Share on other sites
royaloak 0 Report post Posted July 19, 2017 Hi Ecnalx, could you share with me both your list of shortlisted and chosen contractor too? Thanks ! Share this post Link to post Share on other sites
Ecnalx 4 Report post Posted July 19, 2017 On 7/18/2017 at 7:12 AM, NiVleK said: Interesting! Like the way you going for the smart home concept. My new place is also at the north! Hope the move from the west to the north is a good one. Haha Thanks~ 11 hours ago, royaloak said: Hi Ecnalx, could you share with me both your list of shortlisted and chosen contractor too? Thanks ! PM-ed. Share this post Link to post Share on other sites
Stream 4 Report post Posted July 23, 2017 Hi, may I have the name of your contractor M S C. Tia Share this post Link to post Share on other sites
Ecnalx 4 Report post Posted July 24, 2017 23 hours ago, Stream said: Hi, may I have the name of your contractor M S C. Tia PM-ed. Share this post Link to post Share on other sites
blubugs 2 Report post Posted July 25, 2017 Hi, I shared many same sentiments as you - in terms of walk-in wardrobe, false ceiling, position of TV (especially this is so true "I dislike this feeling of discomfort and would think that there would be occasions where wifey or myself would be startled by each other.") and under-mount sink. 1) Can you share with me details of your main contractor M S C and also the aircon installer? 2) You chose homogeneous tiles for your flooring. I read online the main issues include tile cracks, hollow tiles and dirty grout in between tiles. Did you experience these and what is your review? 3) I see you did glass backslash for your kitchen wall. Is it easy to maintain? 4) If you can do it again, is there anything you would do differently? Thanks in advance Share this post Link to post Share on other sites
Ecnalx 4 Report post Posted July 25, 2017 7 hours ago, blubugs said: Hi, I shared many same sentiments as you - in terms of walk-in wardrobe, false ceiling, position of TV (especially this is so true "I dislike this feeling of discomfort and would think that there would be occasions where wifey or myself would be startled by each other.") and under-mount sink. 1) Can you share with me details of your main contractor M S C and also the aircon installer? 2) You chose homogeneous tiles for your flooring. I read online the main issues include tile cracks, hollow tiles and dirty grout in between tiles. Did you experience these and what is your review? 3) I see you did glass backslash for your kitchen wall. Is it easy to maintain? 4) If you can do it again, is there anything you would do differently? Thanks in advance 1) PM-ed. 2) Tile cracks - Not really. In fact, homogeneous tiles are sturdier than ceramic tiles. You can read a summary of the differences at BCA's link here: https://www.bca.gov.sg/Publications/EnhancementSeries/others/design2Ch3.pdf Hollow tiles - No such issue, as my flooring is done by my own contractor instead of HDB contractors. It is much less prone to sloppy work/mistakes as the contractor is responsible for his work. You can always get the contractor to rectify the parts which you are not satisfied with, up to a reasonable standard. Dirty grout - Yes, I foresee that the grout will turn from white to gray as time goes by. Will have to scrub the floor or to re-lay new layer of grout in the future. I think this cannot be prevented unless you use groutless flooring such as vinyl. But then again, we are against vinyl as it is not waterproof and is more prone to wear and tear. 3) Yes, easy to maintain. Just wipe with a cloth/wet wipe/paper towel. The oil/water stains goes away easily. 4) We do not have any regrets in the renovation (eg layout, position, design, carpentry). But I would do these things differently: a) Buy my blinds earlier - We are currently awaiting for the installation of our blinds which can only be installed in Mid Aug as they require 4 weeks to customise and prepare the materials. In the interim, we are using old bedsheets to cover the windows. b) Not buy my MBR TV - Super un-utilised. Only turned it on once to check whether it is working. Most of our time are spent in the living room. c) Install a "washing point" at service yard - Currently I am washing the dirty cloths/vacuum at the kitchen sink. Wifey is not very happy with mixing of dirt cleaning together with food cleaning at the kitchen sink. Share this post Link to post Share on other sites
Raylowwl 1 Report post Posted July 26, 2017 Hi Ecnalx, Could you share with me the contractor name n fb? I'll be doing my reno soon. Hows the carpentry standard? And possible to share your carpentry quotation.. Cos i may only be mainly doing wardrobe n kitchen? The same contractor did your electrical? Ray Share this post Link to post Share on other sites