bluberi 0 Report post Posted March 15, 2007 wonder how much they will charge to change the tiles to matt homo ones...it's not so much the colour but my parents are not really very youngso there's a risk of them falling down, which is something i intend to prevent with no efforts sparedinstalling grip bars in the MBR toilet, no top cabinet in the kitchen, minimum furniture - these are the things that i will do. any other things i can do to make my home safer? please let me know so that i can include them in my quote there is a fellow forumer Compassvale who bought a unit in ur blk. tink she topped up $1+ per sq feet for homo tiles in shiny surface. i was supposed to call the tiles contractor to buy tiles, up till today i still nv call. http://www.renotalk.com/forum/index.php?showtopic=5012 Share this post Link to post Share on other sites
applefreak 1 Report post Posted March 16, 2007 (edited) called my hdb techinical oic today but she's on course no idea if she even went down to take a look or notwill try to call her again on monday to ask when she's going downmost prob will take half day and go down with heri think the forummer actually live directly upstairs from mebut her study's wall is missing...or she had it hacked away before HDB did the rectification???so your floors hacked and relaid liao?did you top up or accept the white tiles?if i top up means got to fork out another 1k for the tilesummm...now in many minds about how i want my kitchen to lookwill post some simple draft that i have came up for the kitchen when i get home Edited March 16, 2007 by applefreak Share this post Link to post Share on other sites
bluberi 0 Report post Posted March 16, 2007 (edited) oh, the TO on course? no wonder today i called many times no answer... wan to ask her wan can complete rectification so i can get back my keys in order to start reno asap.yes, the forumer stays above u. tink she paid the contractor to hack the study room wall for her. i'm asking my ID to hack my study room wall also.. gonna put up glass instead and i want to study entrance to be at the left side instead of center.my whole unit tiles (except kitchen, service yard and 2 toilets) has been changed FOC b4 i collected my keys. in fact, it was changed when the Nov WIS started.. but i ask the TO to help get their contractor hack my kitchen and service yard FOC since she can't change those tiles, i'll pay my ID to supply and lay new tiles, cost mi $1600... Edited March 16, 2007 by bluberi Share this post Link to post Share on other sites
applefreak 1 Report post Posted March 16, 2007 ummm makes me wonder...my neighbour told us that a few months ago got contractors do work in the unit lehbut apparently the tiles are not changed. wonder what they did inside...only things i am sure is that the wall are quite newly painted, the kitchen tiles looks new too.bluberi, check with you ah, the kitchen tiles are the same ones ah?how about the toilets?sure they didn't change the floor tiles, the windows or the balcony doorswhat exactly did they do in the unit???dun tell me upstairs leak water so they had to do works in my unit Share this post Link to post Share on other sites
bluberi 0 Report post Posted March 16, 2007 ummm makes me wonder...my neighbour told us that a few months ago got contractors do work in the unit lehbut apparently the tiles are not changed. wonder what they did inside...only things i am sure is that the wall are quite newly painted, the kitchen tiles looks new too.bluberi, check with you ah, the kitchen tiles are the same ones ah?how about the toilets?sure they didn't change the floor tiles, the windows or the balcony doorswhat exactly did they do in the unit???dun tell me upstairs leak water so they had to do works in my unit i also dunno wat they did inside the unit, u need to ask the TO leh. dats wat i did b4 i collected my keys, the TO said they replaced floor tiles for mi (dun include kitchen, service yard and 2 toilets). my unit also repainted. but the contractor funny lor, nv remove the barricades dat was used during WIS'05 in my HHS, even got an old shirt n some tiles. i actually wanted to keep the tiles, but by the time i wan to go n take, they already removed everything fm the HHS. ur kitchen, service yard and two toilet tiles are the same as mine. how come u said the kitchen tiles looked new leh. see from ur picture, half of the kitchen floor tiles grouting is whitish (dunno izit coz of the sunlight) and the other half looked dirty. maybe they changed oni part of the kitchen floor tiles. does the wall tiles has any cracks? i've got a wall tile with a big crack under the service yard lourved window, and the HDB contractor oni used white cement to seal the crack, not replace it is one tile so expensive until they can't replace?? i spent a bomb oni my unit leh. still got two cracked wall tiles outside the common toilet but i haven check if they also used the same method. for cracked wall tiles in the common toilet, they did replaced it with new ones. muz be they dun have the kitchen wall tiles liao but dun wan to hack and change for mi FOC, so ask contractor to seal cracks with white cement. Share this post Link to post Share on other sites
applefreak 1 Report post Posted March 16, 2007 (edited) my wall tiles are okay, all looks quite new to me lehmaybe bcoz of the shine bahthink they went in to check see what needs to be donebut the grouting between the wall tiles are dusted with white powderfloor tiles cannot make it one, uneven and stained badlybought somethings i like for my room. hehehesome more kitchen layout, please give me your commentsentrance from main door on left, exit to yard on right and lower right is to toilet and passageway Edited March 16, 2007 by applefreak Share this post Link to post Share on other sites
ah_kiat 0 Report post Posted March 16, 2007 (edited) my wall tiles are okay, all looks quite new to me lehmaybe bcoz of the shine bahthink they went in to check see what needs to be donebut the grouting between the wall tiles are dusted with white powderfloor tiles cannot make it one, uneven and stained badlybought somethings i like for my room. heheheMymelody bought the same clock for our future study room too... Dunno why you gals like this so much ! haha... Edited March 16, 2007 by ah_kiat Share this post Link to post Share on other sites
ivory 0 Report post Posted March 17, 2007 Hey Applefreak...passing byOkie let me start my vote for the kitchen layout. I wld prefer layout 2 and 3. But....Layout 2: Like the L-shape of stove but the dryer next to the stove does seem a little oddLayout 3: This is nice. This is the island something kinda concept right? Only consideration wld be the 60cm distance.So seems like I'm just as undecided! !! Share this post Link to post Share on other sites
bluberi 0 Report post Posted March 17, 2007 dats a cute clock u got there... but tink my hubby will ban the cute things fm our MBR. but i got a nice princess heart-shape mat fm my sis leh, i die die will put it outside my MBR toilet !! i prefer the first and second layout. but like wat ivory said, how come got dryer beside the stove? i tot dryer should be in the service yard. or dat is a dishwasher? my kitchen layout is almost the same as the first layout. but my stove is not so near the tall cabinet. Share this post Link to post Share on other sites
hobbes11 0 Report post Posted March 17, 2007 happened to read into your reno blog; just some info for you. Me too bought an EA @SK and have submitted my defects list one month ago b4 CNY and as of today nothing has been rectified yet at all. sigh.......very bad of them cos already taken 3 mths conservancy charges and not doing anything. Share this post Link to post Share on other sites
Edwin Yap 0 Report post Posted March 17, 2007 How much n where did u buy this clock? My wife loves melody. Perhaps I shall buy for our new home to give her a sweet surprise.. Share this post Link to post Share on other sites
ah_kiat 0 Report post Posted March 17, 2007 How much n where did u buy this clock? My wife loves melody. Perhaps I shall buy for our new home to give her a sweet surprise..I bought mine from Isetan Sanrio. I saw the clock at Taka Sanrio too...maybe you want to drop by and take a look...hope it helps...not sure where applefreak bought it from though... Share this post Link to post Share on other sites
applefreak 1 Report post Posted March 17, 2007 (edited) ah kiat - guess it's a girl thing, just like boys with toys bah the clock and the tissue holder will be in my roommy room will be the kuromi room oh dear, that's bad. that'll mean i have to hound the poor girl day and night to make sure that all rectifications be done by apri !! initially thought no place for the dryer at the yardbut went down again today and realised that the spot for my washing machine is quite big so will be putting the dryer therethe washer will be moved to the end, right under the future windowswent down to nan wah and almost got all my lights liaogot matching covers for the lights for MBR and MBR bath, one big one small with the same designgot another set of matching cover, three small one big for the kitchen area. big one for the kitchen, small one for toilet, yard and the walkwaythese six lights cost me $125 and comes with energy saving bulbsinstallation charges are $35 for first light and $8 for subsequent onesfree delivery for orders above $300i'll see if i can find cheaper contractors to do the installation or nottomorrow will be going down to buy the lights for the living room and study.will most prob be getting those with two light bulbs, one yellow and one white. will take photos of them and post it up when i go down tomorrow.btw the sale ends tomorrowthe spending has begun!as for the clock, i bought it together with the tissue box at kittyland located at level 3 of Amara hotel arcade, tanjong pagar Edited March 17, 2007 by applefreak Share this post Link to post Share on other sites
bluberi 0 Report post Posted March 17, 2007 happened to read into your reno blog; just some info for you. Me too bought an EA @SK and have submitted my defects list one month ago b4 CNY and as of today nothing has been rectified yet at all. sigh.......very bad of them cos already taken 3 mths conservancy charges and not doing anything.hobbes11, mi also submitted my defects list b4 CNY... till now oni the major defects has been rectified but i consider oni abt 50% done. fm my last visit on mon till yesterday morning, there wasn't anything else done liao. need to call SK branh office to nag the TO again.ah kiat - guess it's a girl thing, just like boys with toys bah !!the clock and the tissue holder will be in my roommy room will be the kuromi room oh dear, that's bad. that'll mean i have to hound the poor girl day and night to make sure that all rectifications be done by apri initially thought no place for the dryer at the yardbut went down again today and realised that the spot for my washing machine is quite big so will be putting the dryer therethe washer will be moved to the end, right under the future windowswent down to nan wah and almost got all my lights liaogot matching covers for the lights for MBR and MBR bath, one big one small with the same designgot another set of matching cover, three small one big for the kitchen area. big one for the kitchen, small one for toilet, yard and the walkwaythese six lights cost me $125 and comes with energy saving bulbsinstallation charges are $35 for first light and $8 for subsequent onesfree delivery for orders above $300i'll see if i can find cheaper contractors to do the installation or nottomorrow will be going down to buy the lights for the living room and study.will most prob be getting those with two light bulbs, one yellow and one white. will take photos of them and post it up when i go down tomorrow.btw the sale ends tomorrowthe spending has begun!as for the clock, i bought it together with the tissue box at kittyland located at level 3 of Amara hotel arcade, tanjong pagari hope my defects will be done by next week... coz oni left those minor minor defects to be done. if we dun keep on calling the TO, tink she'll slowly slowly get our defects done. we where got so much time to wait. my reno loan gonna start at end apr liao leh, i dun wan to start re-paying loan when the reno has nt started.u working at tg pagar?mi juz bought Xbox 360, can play games and compliment my pioneer HTS. Share this post Link to post Share on other sites
hobbes11 0 Report post Posted March 18, 2007 hobbes11, mi also submitted my defects list b4 CNY... till now oni the major defects has been rectified but i consider oni abt 50% done. fm my last visit on mon till yesterday morning, there wasn't anything else done liao. need to call SK branh office to nag the TO again.i hope my defects will be done by next week... coz oni left those minor minor defects to be done. if we dun keep on calling the TO, tink she'll slowly slowly get our defects done. we where got so much time to wait. my reno loan gonna start at end apr liao leh, i dun wan to start re-paying loan when the reno has nt started.u working at tg pagar?mi juz bought Xbox 360, can play games and compliment my pioneer HTS. o at yours have started to do something, mine not enough a single job done. so fed up with them, 2 weeks and another 2 weeks they say they will do it. DO you have the contact for the TO at SK office? Is this the only one person whom we can speak to? Also check with you something: must we let HDB do the cement screeding or i cant let my contractor handle it? Thanks. Share this post Link to post Share on other sites