Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

Recommended Posts

Hi

Would like to share and records my renovation journey :)

Our new house is a 5-room BTO in AMK and here's our floor plan:

BBF27E8C-6F54-4321-BA2E-E707CBC2FF72_zpsGotten key on Jan 2017 :sport-smiley-018:E78F0129-E3EC-4A8D-B605-4A9EC6D9C099_zpsAA9B7EEF-064D-4857-8589-3B2E488C7BC7_zps35887A6E-5394-4E2D-B0ED-B12869D70D0E_zpsview from service yard :thumbsup:CFAA7379-77BE-49E3-AAEE-62BAC67F4951_zpsView from aircon ledgeC9B53166-86A2-4CAB-898F-38882E197D49_zps

Edited by Ken Lam
 

Share this post


Link to post
Share on other sites

Join 46,923 satisfied homeowners who used renotalk quotation service to find interior designers. Get an estimated quotation
34 minutes ago, KFC1189 said:

Really fast but nice renovation! Your window views are fantastic!

Thanks KFC1189

Not really fast renovation, actually key collected since Jan

 

Share this post


Link to post
Share on other sites

Electrical works

7 Feb 17671CEC9B-0138-4AFE-9891-02FD9C308A57_zpsceiling fans purchased from JB641EA7E6-7DDD-4041-80E3-E42919D0F8D8_zpsElectrical wiring are concealed for some requested places e.g. fans, lighting, 13A power point7254F4DA-50CB-4FCD-908E-152AC9B87A77_zps34387374-B12A-4DBC-8326-1DBE133A45C4_zpsBefore adding lighting point and lighting on/off switch42EDAD8A-E4D0-41CF-A139-059D5F049D35_zpsAfter added concealed lighting point and lighting on/off switchC1B7D108-0935-4825-8BC4-49BE42120D16_zpsBefore adding concealed 13A power point and lighting point 29CC8C70-EEC1-4A93-91A4-CD1A18008479_zpsAfter added concealed 13A power point and lighting pt 146EB5F3-AEC2-4233-B9BE-A5104C7926C8_zps 12943307-FAA2-40C9-8F26-29DFF6554449_zps26D47683-B238-44AA-B0C7-A59673CC4270_zpsA9E3B015-A448-4A3B-BBCA-3A7CA1571FD8_zpsWe are pretty happy with the workmanship so far.

Plumbing work2A97BCF5-AFA6-4D70-BB04-D798082F1B58_zpsCold water piping to gas heater and hot water out  piping to bathroom 90984FF3-CF2A-41D2-B265-E1B7AC2465E4_zps

Edited by Ken Lam
 

Share this post


Link to post
Share on other sites

Living, master room cove light holder, L-box, curtain pelmet,  passageway aircon trunking gas piping box up - Contractor N

14 Feb 1721EEA726-997A-4B63-B5F7-50696B108DF7_zps BF395969-ABD8-4E48-834F-485393A93733_zpsaircon trucking boxup63D798A2-32DA-4BD8-BC55-8C8DD76C21F5_zpsGas piping boxup3FB3C39F-B0EF-4B50-986C-D4BD85569364_zpsA709656D-35C9-4E06-B052-89F74694F7E2_zps4A85B9EC-B178-4D17-BA67-D5BBF7A125DA_zps74CF2E89-16DE-4621-8880-F0E8CCFC181E_zps84840E13-DCDB-46BC-BC2B-4174E834DA0A_zps

Grilles and service yard windows are up:)1A6BE58F-51E0-4BC7-9188-126A3C10ACC1_zps11B939EA-D53D-44F7-96A6-C96ABE208F6E_zps47FC04A8-E9AE-4518-89A0-8C9B6EFB36C3_zps51D1B049-8F56-4C3F-BFB6-440C590B4F05_zps

Painting - selected Dulux ambience all 6F997B6F-DF45-448C-8314-6398F9B74689_zps89A5CB03-0D8A-4ABE-B4C3-F5DD419D2EA4_zps6E1DC05E-6F8D-4EB1-A043-5475603010D3_zps0892EC5C-C081-40C6-BB7A-BC76229EF5D3_zpsA2DE8871-E4D2-41C4-8274-CA27AF334EBB_zpsB11CF5F7-FDDA-4D8C-90A2-9E3B49AF282B_zps48C1FB46-6650-4D21-8AF9-7635401EF772_zps

Edited by Ken Lam
 

Share this post


Link to post
Share on other sites

Carpentry works35697944-082D-4287-A1E8-2B048010C469_zps13 Mar 178779DDBA-7601-4CF5-B901-301CC3562F2F_zps

Kitchen! 90% done! Wait for glass backsplash and plumbing works. One of my favorite spot :good:4D23262F-90BE-4E2C-BC63-1BEB8C3342C0_zps64A1BB60-810B-466E-9B3A-51A57F68D210_zps

Selected Quartz surface 8015 :)

I love the colours personally.. :P

CE724C27-C0C3-4FA7-89C5-5C50989E3B94_zps17CA1355-AF53-44CD-B2D2-0950DE7C0C59_zpsCE978A62-E12C-44B5-8B44-6D173BD67A72_zps697B2DFF-6767-42A5-B5BF-51F396AF9A9E_zps0B9B204A-A498-49D0-9FC0-E2A64264BD97_zps3FA02337-A99C-47A5-BD86-8C684E142FDC_zps736AD996-3B4C-4F9D-B249-1E88EE1808B2_zps07551B3F-C3F2-49F5-95F9-A5781B2B8B65_zps

16 Mar update on carpentry work

like the study desk, very close to our idea :good:58AAA884-41C4-4DF8-B0A9-D740145BAE77_zpsB54B64FC-A552-41EF-A103-09B8D7E17A95_zps027CB9F9-453F-4BB9-88B1-AA798E5ED6D7_zpsBedroom 225750CFB-E586-43E6-8BFC-4DB5629F9E4E_zpsDD8211E0-D5DD-43FE-AE26-E5835CB32B20_zpsBedroom 19334FBB5-1D28-442A-9091-D19D85FF454D_zps

Edited by Ken Lam
 

Share this post


Link to post
Share on other sites

Went up to our place yesterday and saw the kitchen clear frameless bi-folding tempered glass door are installed!3140541A-F58B-4E02-B63C-F646DD8692A3_zps0FFBD93D-4259-492E-93B8-AFE07DA68004_zpsB64D3D11-A7BB-448D-8562-B54C92EDEA09_zps

Unfortunately one of the wall tile crack when they drill the wall to install the door. :(661D93CE-E825-4988-93D8-61D9544E92F0_zpsBF821A71-BF22-4049-A7A7-F7E0799614A9_zpsreplaced one of tile and install back the glass door.125F8E06-6F75-4C32-B126-2425E6BD597A_zps

Edited by Ken Lam
 

Share this post


Link to post
Share on other sites

Very interesting that you're handling this without an ID or main con =) works look good!

Edited by spooky
 
  • Like 1

Share this post


Link to post
Share on other sites

ohhh you doing DIY reno? im tempted to as well, but would it be difficult to coordinate works between different people? or when anything goes wrong they'll start pointing fingers at each other. 

so far i tried asking individual quotes for carpentry, glass sliding doors, aircon, painting. not any cheaper than what contractors & IDs have quoted me. maybe i just dont have the right contacts.

 

Share this post


Link to post
Share on other sites
11 hours ago, matchalatte said:

ohhh you doing DIY reno? im tempted to as well, but would it be difficult to coordinate works between different people? or when anything goes wrong they'll start pointing fingers at each other. 

so far i tried asking individual quotes for carpentry, glass sliding doors, aircon, painting. not any cheaper than what contractors & IDs have quoted me. maybe i just dont have the right contacts.

So far went well for my simple DIY reno.

Maybe I'm lucky getting the right contacts.

 

Edited by Ken Lam
 

Share this post


Link to post
Share on other sites

electrical & plumbing Jackie 91824672

False ceiling, cove light holder & L box 
Nick 94502746

Carpenter
Ah Gen 90022016

Edited by Ken Lam
 

Share this post


Link to post
Share on other sites

Hi Ken, I notice your kitchen bi-folding glass door blocks the kitchen switches when it is open. So if you want to turn on the kitchen light, first you have to close the kitchen door, then turn on the switch and then reopen the kitchen door. This is not ideal in my opinion. You may want to relocate the switches to the other side of the wall.

 
  • Like 1

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×