greentea 0 Report post Posted July 27, 2007 1) first time you open the doors as the new owner.2) bed placement date (安床)3) moving in date. (入伙)*) 安神hi mace,so sleep on frame better or otherwise.i still blur leh..dunno.gif Share this post Link to post Share on other sites
MaCe 3 Report post Posted July 27, 2007 hi mace,so sleep on frame better or otherwise.i still blur leh..dunno.gifbed with frame ( below bed is empty/hollow ) is standard FS.4 pole bed (below bed is empty/hollow) with "curtains" all round is super FS. Share this post Link to post Share on other sites
moonbell 0 Report post Posted August 27, 2007 I need some advice... 1) Should we consult FS master while at the new flat, with ID 3D drawings to show layout and design OR without the drawings? Which is more worthwhile?2) How do they charge consultation fee? More ex with 3D drawings? Share this post Link to post Share on other sites
MaCe 3 Report post Posted August 27, 2007 I need some advice... 1) Should we consult FS master while at the new flat, with ID 3D drawings to show layout and design OR without the drawings? Which is more worthwhile?2) How do they charge consultation fee? More ex with 3D drawings?huh? if you engage a fsm, he will go to your flat. just show him your design and let him see which part needs to be change/rectified.FSM dont give you 3d drawings, they are not interior designers. Most will give you a floorplan with furniture/stoves/..etc 's layout. Share this post Link to post Share on other sites
currahee 1 Report post Posted August 27, 2007 btw if one is not intending to renovate first, so does it mean just find a date to open the door and can stay in... when wanna reno then do dong tu? thanks. Share this post Link to post Share on other sites
MaCe 3 Report post Posted August 28, 2007 btw if one is not intending to renovate first, so does it mean just find a date to open the door and can stay in... when wanna reno then do dong tu? thanks.then should choose date in the according order ;1) open doors2) house moving3) reno Share this post Link to post Share on other sites
moonbell 0 Report post Posted August 28, 2007 huh? if you engage a fsm, he will go to your flat. just show him your design and let him see which part needs to be change/rectified.FSM dont give you 3d drawings, they are not interior designers. Most will give you a floorplan with furniture/stoves/..etc 's layout.Thanks MaCe.Does FSM charges more consultation fee if I show him my ID's 3D drawing? Hubby wants to see FSM without the 3D drawings, as he's afraid FSM might "object" to certain design/features/position. What's the standard package for FS consultation? Share this post Link to post Share on other sites
MaCe 3 Report post Posted August 28, 2007 Thanks MaCe.Does FSM charges more consultation fee if I show him my ID's 3D drawing? Hubby wants to see FSM without the 3D drawings, as he's afraid FSM might "object" to certain design/features/position. What's the standard package for FS consultation? if you die die want to retain your designs - no point going to a fsm.FS consultation range from $300-$1k depends on your house type. anything more than $1k, those are conmen who advertise a lot, making you think that GOOD ones must be EXPENSIVE. Share this post Link to post Share on other sites
kajua 1 Report post Posted November 25, 2007 then should choose date in the according order ;1) open doors2) house moving3) renoWhat are the things to do for 1) Open doors2) house moving3) reno?Pineapple? Rice in corner ? charcoal stove? etc etc which one goes where ah? Share this post Link to post Share on other sites
kitty 0 Report post Posted December 5, 2007 beside date for moving do we also need to select date for stove and installation of new bed? Share this post Link to post Share on other sites
MaCe 3 Report post Posted December 5, 2007 beside date for moving do we also need to select date for stove and installation of new bed?stove is optional.bed = an chuang 安床 yes. Share this post Link to post Share on other sites
kitty 0 Report post Posted December 6, 2007 stove is optional.bed = an chuang 安床 yes.but i've an chuang at my current in-laws house already before i got marry....but will be buying a new bed for my houseso can still an chuang again? Share this post Link to post Share on other sites
MaCe 3 Report post Posted December 6, 2007 but i've an chuang at my current in-laws house already before i got marry....but will be buying a new bed for my houseso can still an chuang again?yes, it's a old chinese custom. in the past they will do anchuang until have kids. Share this post Link to post Share on other sites
khoonyew 0 Report post Posted December 8, 2007 yes, it's a old chinese custom. in the past they will do anchuang until have kids.Hi,I just moved in to my hse for 1 week and discovered that there are crack lines on the wall. Its have to be re-plaster and re-paint. I have done all the pray pray..... REno finish pray and move in pray. So when can the contractor come in to the touch again...... Do have have to choose a date to pray....... Share this post Link to post Share on other sites
MaCe 3 Report post Posted December 8, 2007 Hi,I just moved in to my hse for 1 week and discovered that there are crack lines on the wall. Its have to be re-plaster and re-paint. I have done all the pray pray..... REno finish pray and move in pray. So when can the contractor come in to the touch again...... Do have have to choose a date to pray.......to do touch ups? no need lah..... Share this post Link to post Share on other sites