stone78 0 Report post Posted January 19, 2017 Hi all, I need advice? i using contractors for my 4rm BTO which under standard flat (means flooring for living room and 3 bedroom no done by HDB) Do you know which start reno first? my understanding is 1. wet works for flooring 2. plumbing for gas and piping 3. 1st painting on wall and ceiling 4. install aircon 5. install electrical works layout (false ceiling and wiring) 6. install window grilles 7. carpentry 8. install electrical lighting 9. final painting and touch up 10. handover above mention is it the correct flow? please advice me Thanks Share this post Link to post Share on other sites
Arfan 64 Report post Posted February 3, 2017 Seems about right from the way you listed 1 Share this post Link to post Share on other sites
stone78 0 Report post Posted February 3, 2017 Thanks Arfan Share this post Link to post Share on other sites
BelindaSeah 171 Report post Posted February 7, 2017 Mine the painting was done first actually, but this depends on individuals Share this post Link to post Share on other sites
stone78 0 Report post Posted February 10, 2017 Hi Belinda, did you start reno recently? your cement screeding is done by HDB or ID? as cement to HDB need time Share this post Link to post Share on other sites
BelindaSeah 171 Report post Posted February 11, 2017 20 hours ago, stone78 said: your cement screeding is done by HDB or ID? Mine was done by HDB Share this post Link to post Share on other sites