On 11/30/2016 at 3:23 AM, soulforger said:

Slightly more than our initial budget (around 5-10%) because later on we have opt in for few optional items (e.g. acid wash kitchen and toilet flooring, upgrade paint from ICI pentalite to Delux wash & wear, get new main gate and door, change the kitchen sliding door to slide & swing door, add 1 more power point, get BLUM lever for dish rack and DTC slow close track, box up trunking etc).

But I think the detail quote really helps to prevent/minimize any surprise, at least for our case, most of the cost increase is due to us opt in for better options.

Only at one point we found the lighting installation charge at updated quote (electrician update Ray after job completed) become much higher than first quoted, upon checking the quote ourselves then find out Ray quotes base on previous number of lighting points which is part of our fault for overlook the quantity lah, haha... 8|

Based on previous quotation and we've expected 5-10% more than our budget when we opt in those items. 

Received the final quotation yesterday for last 10% payment upon completion and to our surprise the total doesn't exceed our budget (30k), hahaha... :yeah:

 
  • Like 1

Share this post


Link to post
Share on other sites

Renovation Progress - 24 Nov 2016, Day 34

Judging our renovation will be completed 20 Nov, we have request Vincent to proceed with curtain installation. He has scheduled 24 Nov 11:30am, since we don't have much annual leave left, we have gave him the number lock passcode and he proceed to install the curtains on scheduled date.

I'd expect some may interested to know his contact after seeing his work, his phone number is  nine three eight four nine two two eight, if you would like know to know how much we spent, please pm me, thanks.

Living room - The door smith is installing the gate and door at the same evening and tied the curtain to right hand side to not hinder his work...

20161124_200044.jpg

Master bedroom

20161124_200202.jpg

Bedroom 2 - Found this color looks much nicer than the MBR curtain, haha.

20161124_200230.jpg

 

Share this post


Link to post
Share on other sites
12 hours ago, fifteenmay said:

nice reno! hse looking very cozy!

 

Thanks! It looks cozy because no furniture yet, hopefully will still feel cozy once we put in furnitures, haha.

 

Share this post


Link to post
Share on other sites
11 hours ago, soulforger said:

Thanks! It looks cozy because no furniture yet, hopefully will still feel cozy once we put in furnitures, haha.

confirmed will be !:P

 

Share this post


Link to post
Share on other sites

Renovation Progress - 26 Nov 2016, Day 36

Renovation done with plumber install the sink mixer, paint touch up and put on kitchen sliding & swing door. get the washing machine and fridge delivered by mega discount store and perform first round of clean up.

Plumber has installed our Blanco Spirit-S pull out sink mixer, very solid build and looks very stylish, it has a smooth action and the pullout is extremely useful from prevent water from spill out.

15170806_10154356889623743_9069434189953

We bought Electrolux fridge and washing machine, the ETE5720AA fridge comes with auto ice maker (still have to fill water bottle though) which is quite handy. We also bought the SimpleHuman bag dispenser, this holder is really a wonderful buy, it looks slick yet hold loads of carrier bags and they are so easy to pull out.

15203184_10154356888728743_7024397109713

Kitchen - Install the Slide & Swing door

15220258_10154356889583743_5362177310423

Final round of touch up paint, really love the charcoal slate color, you may think that the dark grey will make the room smaller, but it is an interesting versatile neutral color which just make other things pop :)

15241303_10154356889803743_4810625156660

 

Share this post


Link to post
Share on other sites

hi there! would you be willing to share your id/contractor contact and your quotation please?
just bought a place with a similar layout too!

also, did you leave the access to the boxed up pipes behind the washing machine? am thinking of doing a tabletop which would mean no access to the pipes if anything goes wrong!

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  


×