Jump to content
Find Professionals    Deals    Get Quotations   Portfolios
Sign in to follow this  
Homeowner

Warderz Reno Blog

Recommended Posts

Looking for good contractors? Click here for your request

Whoa...now u have your own t-blog. Congrats on the coming reno! Mine is starting on the 5th...same as autumnzy..we can view each other's reno progress yah!

 

Share this post


Link to post
Share on other sites

Hi Hi, I'll be starting some time in March too! All the best! Cheers to a successful reno! :notti:

 

Share this post


Link to post
Share on other sites

Thanks to all well wishes, the quotes are as below,

Hacking/Demolition works

1.Dismantle kitchen top & shelves

2.Dismantle 2 toilet bowls

3.Labour to clear all debris & uploading of goods & materials

Masonry works

1.Supply and install laminate flooring @ living

2.Supply and install 10mm tempered glass shower screen @ toilets

Gates / Doors

1.Supply & install 1 wrought iron gate

Electrical/Plumbing & sanitary ware

1.Supply & install 2 shower sets

2.Supply & install 2 wc @ 2 toilets

3.Supply & install sink & tap

Painting /plastering

1.Supply labour to paint whole house using ICI paint

2.Supply labour to paint door/door frames/pipes

Ceiling & partition works and cornices

1.Supply & install L-box @ living area

2.Supply & install false ceiling @ dining area

3.Supply & install, false ceiling & L-box @ master bedrm

4.Supply & install false ceiling at bedrm passage

5.Supply & install false ceiling @ foyer area

Carpentry works

1.Design & fabricate 5ft laminate shoe rack @ entrance

2.Design & fabricate 8ft feature wall in gypsum board

3.Design & fabricate 2 nos of 2 ft laminate bedside table

4.Supply & install 4ft full height mirror

5.Design & fabricate 10ft headboard in laminate c/w cushion

6.Supply & install glass door c/w gypsum board

Kids Bedroom

1design & fabricate 7 ft casemwnt wardrobe

Master toilet

1.Design & fabricate 6ft laminate vanity cabinet

2.Supply & install 1 nos full height mirror

Common toilet

1.Supply & install 1 nos full height mirror

Others/remarks

1.Supply labour to acid wash whole house

2.Supply labour to install sink & shower set

3.Supply labour & material to rewire whole house

 

Share this post


Link to post
Share on other sites

My block is 682b, and its my pleasure to inform that the reno works have officially started today. Anyway if any of u guys, fellow bloggers are wondering how much is the cost of the reno, its 30k++.

My reno will just be a simple one. Anyway for lynzi and autumnzy which block are yours? And what are the concepts for ur homes?

 

Share this post


Link to post
Share on other sites
My block is 682b, and its my pleasure to inform that the reno works have officially started today. Anyway if any of u guys, fellow bloggers are wondering how much is the cost of the reno, its 30k++.

My reno will just be a simple one. Anyway for lynzi and autumnzy which block are yours? And what are the concepts for ur homes?

Mine is 684A. Modern theme, whole house black & red only. :good:

 

Share this post


Link to post
Share on other sites

Hi, looks like a lot of ppl living in north side...i also around there but i at sembawang.. :) !!

Looking forward to see more pictures from your reno.. :good::P

 

Share this post


Link to post
Share on other sites
How's your reno. coming? :seeya: The whole place must be hacked up now.

Ha ha ha, I'm quite impressed by the rate they are werkin.

1.Last Thursday they started with the hackings.

2.Friday, completed with the wiring for the house.

3.Saturday, completed fixing L box and false ceiling.

4.Monday completed backing for tv console and partition between the living rm and the dining area.

Will keep you guys updated on the latest.

:):):):bleah:

 

Share this post


Link to post
Share on other sites

Hi hi...my block is at 683D. Maybe we can arrange 1 day when all of us can go around to view each other's reno since all our blocks are within walking distance. My theme is modern minimalist. Mostly black and different shades of grey. Study will be in all white except for 1 wall, 1 sofabed and 1 cushion in the colour of tiffanyblue. Actually I wanted all white but hubby looooovvvvesss blue so gotta compromised since the rest of the house is mostly in my favour...haha!

Btw my reno started yesterday!! Can check out my t-blog on the progress..hehe.

Hirox, currently I'm still staying at my parent's place in sembawang. U can also join in the viewing reno club...hahaha.

Edited by lynzi
 

Share this post


Link to post
Share on other sites
Hi hi...my block is at 683D. Maybe we can arrange 1 day when all of us can go around to view each other's reno since all our blocks are within walking distance. My theme is modern minimalist. Mostly black and different shades of grey. Study will be in all white except for 1 wall, 1 sofabed and 1 cushion in the colour of tiffanyblue. Actually I wanted all white but hubby looooovvvvesss blue so gotta compromised since the rest of the house is mostly in my favour...haha!

Btw my reno started yesterday!! Can check out my t-blog on the progress..hehe.

Hirox, currently I'm still staying at my parent's place in sembawang. U can also join in the viewing reno club...hahaha.

My Hubby also insist that his study room mus be in blue.. his fav colour.. :notti:

 

Share this post


Link to post
Share on other sites

Haha...our hubbies seemed to prefer the same colour.

But come to think of it, I'm the one who will be using the room more than him as I always bring my work home and he doesn't. Even if he has work to do he can always go to his office...its just within walking distance...hehehe.

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  


×