JunLiang Chen 1 Report post Posted June 8, 2016 Sharing our experience with Rezt n Relax Interior design Senior designer: Stuart Sales designer: Cindy Points of view: During our initial negotiation process, cost of items such as Kitchen glass panel, kitchen cabinet kerb, plumbing services was not brought up and thus not included in the contract. ID had left these items out during negotiation (not sure if they are intentional) to match to my budget, though they were aware that I want the kitchen glass panel. Thereafter duri...ng renovation, ID would call to inform that the items was not included in the contract and therefore require additions to the variation order. Situation 1: 3D picture includes the glass panel in the kitchen (between top hung and bottom cabinet). As consumers, we do not know what items are included and which are not. For instance, the blum system dishracks was not stated in the contract and yet it was included. Situation 2: The kerb for kitchen cabinet was not included in the contract and ID requested to add onto the variation order. A reasonable Senior Designer would have known that installing the kitchen cabinet would also requires the kerb to be done. As a consumer, we would not know that these 2 items are separate as all we need ultimately is the kitchen cabinet to be there. Situation 3: Do note that plumbing services is not included in the contract, and will be charge separately. If possible, you may request them to state in the contract so that everyone is on the same page. This will allow you to know upfront a more reliable estimate of your renovation cost, and perhaps for your own comparison purposes. Word of advice: Do ensure that the items you require are included in the contract, thereby giving you a more complete picture of the renovation costs to be incurred. As for the 3D pictures, if possible, remove those items that were not part of the items negotiated as per the contract. Please move in only after the handover as what we had encountered during the touch ups was, ID responded that those defects were created by the developer and it was there before the renovation process started. This is to prevent ID from pushing their blame to others. Disclaimer: The above is solely based on my own personal experience and therefore should and only be used for referencing and the purpose is not to affect the final decision of the consumers. 1 Share this post Link to post Share on other sites
AndrewA 1 Report post Posted June 10, 2016 Hello JunLiang, Thanks for your post in reminding newbie like me.... I will pay attention to the above mentioned pointed out by you For your case, this is what I would consider the ID to be unethical. He is in a better position to understand what are required in the renovation as this is his job. We only renovate once (maybe twice) in our lifetime! He chose to act ignorance .... haiz.... Share this post Link to post Share on other sites