Thank you for your reply.

I know the Floorplanner software is able to calculate the total floor area for you. I used it to draw my layout plan and it calculated the floor area for me automatically. 

Your storeroom will be very big. Is it a walk in type or just a huge floor to ceiling storage cabinet?

 

Share this post


Link to post
Share on other sites

Join 46,923 satisfied homeowners who used renotalk quotation service to find interior designers. Get an estimated quotation

Funiture Purchases

We’re actually very kiasu homeowners. Some stuffs we bought was way way ahead even before the sale completion of the flat. I remember we bought our mattress during Robinson's black friday sales last year!
 

From Hipvan:

We bought all these during the last xmas sale. I got to know Hipvan from the sideads of Facebook with all their interesting cushions pics but I’ve never clicked on them before. Last December we were walking around millennia walk (usually we go there for Harvey norman or Commune), I saw Hipvan’s pop up store. Their shutters were half down already but we saw a sofa that we wanted to try on. So the fiancé bravely walked in and asked if we could briefly try on it. Fiance likes the simplicity and slim legs and I gave my nod for it. We bought it during their xmas online sale:

Jervis L-shape sofa and ottoman in Grey:

t8oylv.jpg

11ipgcg.jpg

Besides the sofa, we also got these chairs that are so common these days. But its quite a lasting design and it suits our theme.

2n7dyte.jpg

 

 

From Comfort Design

The Fiance wanted to get a C-shape side table. We wanted to customise it but our carpenter quoted it way too high so we decided to get it from the retail shop. We saw the offers from Comfort Design and decided to take a look at their showroom in Eunos. We bought it as it was a good size and came in some simple black table top.

 2vctaqf.jpg

We also got the rocking chairs, compatible with our dining chairs that we got from hipvan on our 2nd visit to the store.

346uyqx.jpg

 

 

From Taobao

We bought ½ of the house lights from Taobao. We will be using the LED strip for our light cove which we bought almost one whole big roll from Taobao.

 The rest of the lights that we got from Taobao will be more of decorative lights for the house.

The floor lamp for the living room (as per what is seen in the 3D sketch):

1557341.jpg 

hrk50l.jpg

The floor lamp and pendant light for the masterbedroom (as per what is seen in the 3D sketch):

rlicrp.jpg              mx0qv7.jpg

dxfz3q.jpg

 

We bought our laundry sink from Taobao as well. It arrived in a box with wooden crate as shown below. We took out the sink during lunch time as the carpenter needs to open the sink hole for the plumber to install it. The actual product looks very decent and the exterior of the sink is somehow wrapped with some material...which is quite nice to touch.

Site pics:

jh31bl.jpg

Actual product pic:

r90abo.jpg

There's one item that takes forever to arrive SG, i think its still awaiting to be shipped out (sigh). 
It's our coffee table. This type of coffee table is sooooo hard to find in SG! There is just something that we don't like for similar dimensions that we saw in SG.
So when we saw this in Taobao, we knew its the one! Now im praying that it arrives with no damage as there is a 5mm of tempered glass on the table top.

334nker.jpg

 

 

I will soon blog about our sanitary fixtures purchases and the items we got from ikea =)

 

 

Share this post


Link to post
Share on other sites

Laminate Selection

On and off we’ve been discussing about the laminates we gonna have for our kitchen and bedroom carpentry. Most of the carpentry will be using white matte laminates except for the doors of the cabinets. 

My Fiance liked the Lam Chuan laminate that my mum chose when she got all her kitchen cabinet replaced as this laminate has matching edge band. However, i find the colour abit towards the darker side. 

Here is how the Lam Chuan’s laminate looks at my mum's place and the product code shown on their site:

21esyld.jpguan86.jpg

 

 

Then EDL has this new 2016 Collection and we went to take a look at their catalogue. Some laminates look very good but it’s a pity that their grains are too deep. It will take a lot of effort to clean in the future.

We selected a few as shown below. Samples were given to us but I think we dint take a pic on those samples so can only grab the image from their online catalogue.

 

s3n9le.jpg

The porcelein teak has a green undertone and the white wash oak has a pinky/red undertone. If i remember correctly, i think the fiance commented that the light hipster oak is on the lighter side because he think the kitchen might just look washed out with the white laminates around. In the end, we chose New Teak and New Teak 1. The difference between the two is that one has a mild grain texture the other one is kinda matte. The textured kind will go into the master bedroom carpentry and the matte ones will be in the kitchen. These are the actual laminate pics:

2rq0bgm.jpg

fyl4m1.jpg

 

Since we have decided to get the laminates from EDL, we are also getting this white matte laminates from them. All exterior carpentry (anything that can be seen except the doors) will be in this white matte laminate called Porcelein.

2dso70i.jpg

 

The carpentry is currently going on...hopefully by early next week everything will be done!

 

 

Share this post


Link to post
Share on other sites

Carpentry Day 2 & 3:

After Day 1's installation of the cabinets to the corners each belongs to. The carpentry work on Day 2 and 3 has been rather consistent.

 

Walk in wardrobe

The walk in wardrobe was in place at the end of Day 2 and completed by Day 3.
The uncle in Day 2 was sticking the PVC on the top edge of the walk in wardrobe when i reach my new place after work. It was all done on Day 3!
The fiance took out his jeans to try on the height of the trousers rack. LOL.

nyw8z9.jpg

 

Kitchen Island

The half the island was up on Day 2 when i visited after work and the second half up at the end of Day 3.
The box on top of the half island is the sink counter and the hole for the sink is cut on day 3 noon time.
I find the island was abit way too long and we'll be cutting 4 inches away at the end thats nearer to the bedroom side.


2e3pimo.jpg

 

Cabinets along the windows

Eh..Somehow i dint took pics of the progress of the cabinets along the windows on Day 2.
Therefore can only show the difference of Day 1 and 3.
On Day 3, they are already gluing the matte white laminates on the exteriors of the cabinets. Also they have completed the installation of the top cabinets by the end of Day 3.

mmsepf.jpg

 

 

Cooking area, Laundry Area

This is the area where our hood and hob are and at the other side is the laundry area where we have the laundry sink and washing machine inside the cabinet.
The raw areas behind will be covered with white tiles when the carpentry is completed. 

wmcjkp.jpg

When the carpentry is formed, the shape of the house is more or less visible. We're really looking forward to completion!

 

 

 

Share this post


Link to post
Share on other sites

Contractors / IDs

I noticed that I’m probably the only that is not blogging in a sequence. Haha.

It dint occur to me to actually blogged about it until one fine day when I was researching stuffs for the upcoming renovation back then and I chanced upon the T-blog.

After we confirmed the deal with the previous own of our flat, we immediately bought the floor plan from hdb as the one that the owner’s agent provide doesn’t seems to be to scale. It’s the hand drawn kinda floorplan:

126ciz6.jpg 

 

My fiancé then get to work on the design of the house. My basic idea of the house is that the place must be bright, no dark looking house. So he worked according to the layout of the house and what we can afford to. Though the fiancé is working in the industry, but most of his contacts deals with high end projects thus affordability becomes a problem.

We then started researching, googling, friend’s contacts for contractors and IDs.

These are the few contractors/IDs that we have visited with our design and scope of works required from them:

1) Diamon’ Tif

They are the first contractor company we visited. They were running a Christmas promo. What attracted us over was the promo that they have. As we have a long kitchen and having island in mind, carpentry cost will be one of the bulk of the reno cost. The promotion that they were having was that the kitchen cabinet cost $70 pfr. They have their own in house carpentry and they give 5 years warranty instead of the usual 1 or 2 yrs in the industry.

However, as usual like what most IDs do, the $70 is limited to a certain length, which is usually 10 ft top and bottom. We sat there for about 2 hours explaining what’s required and how to go about achieving the design.

About 3 weeks later, their quote came back and it was one of the highest.

 

2) Taaxa

The previous owner’s agent introduced us his own contractor that did the reno for his place. We requested for a meet up since most contractors do that with their potential clients to understand their needs. This contractor dint and just requested us to email our requirements.

His price was almost 30k more than Diamon’Tif! We will probably spit out anything in our mouth upon seeing the quotation. Of course, there wasn’t any purpose to really do a meetup anymore.

 

3) Renoguyz

We went to see him after reading reviews of him being one of the most reasonably priced contractor in the market. He’s one of the last few contractors we met. Having some experiences with previous contractors and ID firms, we realised that they can take a pretty long time to calculate how much profit they should earn.

Nick is very efficient. He’s able to quote every item immediately on his pc after we go through the specifications. The quotation is on our hands before we left. We’re actually very impressed no matter what his price is.

I guess everyone that went to him somehow or another suffered from his bluntness and sarcasm. The first comment from him after my fiancé intro himself was… People like u all very hard to manage one. Hahahaha!

We dint use him ultimately, but should anyone asked for contacts, we’ll be glad to recommend him.

 

4) D Trend Interior Design

We visited them one weekend and had a discussion for an hour or so….but their quote never came back at all. Not recommendable at all.

 

5) Hoong Fatt Heng Reno

Marco was the one that attended to us. He tried his best to give us his best quote as possible though there are certain works he’s not able to go as low. We have since recommend him to some of our friends as well. When we approached him, they are still not GST registered yet.

GST in reno is a horrifying figure. The amount is enough for you to do a lot a lot of other works.

 

6) SW Contruction

A close friend recommended us to him. Very close to what we want (probably a lot of “friendship price”) but the only thing is they are GST registered. With that, they actually lose out the opportunity.

 

Ultimately, we chose to be our own main con and coordinate everything ourselves. It's really not easy to manage some stuffs and people should you choose to be ur own main con.

Our home that definitely has our sweat and blood!

 

 

Share this post


Link to post
Share on other sites
On 13 July 2016 at 4:06 PM, Starryun said:

Funiture Purchases

We’re actually very kiasu homeowners. Some stuffs we bought was way way ahead even before the sale completion of the flat. I remember we bought our mattress during Robinson's black friday sales last year!
 

From Hipvan:

 

We bought all these during the last xmas sale. I got to know Hipvan from the sideads of Facebook with all their interesting cushions pics but I’ve never clicked on them before. Last December we were walking around millennia walk (usually we go there for Harvey norman or Commune), I saw Hipvan’s pop up store. Their shutters were half down already but we saw a sofa that we wanted to try on. So the fiancé bravely walked in and asked if we could briefly try on it. Fiance likes the simplicity and slim legs and I gave my nod for it. We bought it during their xmas online sale:

 

Jervis L-shape sofa and ottoman in Grey:

 

t8oylv.jpg

11ipgcg.jpg

Besides the sofa, we also got these chairs that are so common these days. But its quite a lasting design and it suits our theme.

 

2n7dyte.jpg

 

 

From Comfort Design

 

The Fiance wanted to get a C-shape side table. We wanted to customise it but our carpenter quoted it way too high so we decided to get it from the retail shop. We saw the offers from Comfort Design and decided to take a look at their showroom in Eunos. We bought it as it was a good size and came in some simple black table top.

 

 

 2vctaqf.jpg

We also got the rocking chairs, compatible with our dining chairs that we got from hipvan on our 2nd visit to the store.

 

346uyqx.jpg

 

 

From Taobao

We bought ½ of the house lights from Taobao. We will be using the LED strip for our light cove which we bought almost one whole big roll from Taobao.

 

 The rest of the lights that we got from Taobao will be more of decorative lights for the house.

The floor lamp for the living room (as per what is seen in the 3D sketch):

 

1557341.jpg 

hrk50l.jpg

 

 

 

The floor lamp and pendant light for the masterbedroom (as per what is seen in the 3D sketch):

 

 

rlicrp.jpg              mx0qv7.jpg

dxfz3q.jpg

 

We bought our laundry sink from Taobao as well. It arrived in a box with wooden crate as shown below. We took out the sink during lunch time as the carpenter needs to open the sink hole for the plumber to install it. The actual product looks very decent and the exterior of the sink is somehow wrapped with some material...which is quite nice to touch.

Site pics:

jh31bl.jpg

Actual product pic:

r90abo.jpg

 

 

 

There's one item that takes forever to arrive SG, i think its still awaiting to be shipped out (sigh). 
It's our coffee table. This type of coffee table is sooooo hard to find in SG! There is just something that we don't like for similar dimensions that we saw in SG.
So when we saw this in Taobao, we knew its the one! Now im praying that it arrives with no damage as there is a 5mm of tempered glass on the table top.

334nker.jpg

 

 

I will soon blog about our sanitary fixtures purchases and the items we got from ikea =)

 

 

 

Hi I like the coffee table and the sink. How's the quality of both ? Can you pm me the link ? Thank you 

 

Share this post


Link to post
Share on other sites
On 7/15/2016 at 4:35 PM, Edger03 said:

Hi I like the coffee table and the sink. How's the quality of both ? Can you pm me the link ? Thank you 

Hi, 

We have not used both items so can't really comment much about the quality. The sink doesnt look bad, just a little lighter than and the kitchen sink that we got in SG. It's graded as 304 stainless steel. 
As for the table, its probably still in china. Got it through ezbuy..slow like mad.

Link for the sink: https://detail.tmall.com/item.htm?id=27407184816&toSite=main

Link for the table: https://item.taobao.com/item.htm?id=530687146101&toSite=main

 

Share this post


Link to post
Share on other sites

Carpentry Day 4 & 5

The carpentry work has entered into its 4th sand 5th day. Progress is good by the end of Day 4.

The island’s formica has been glued!
300vcif.jpg

 

The formica for the front panels of the tall cabinets by the windos are up as well.


2rx8e9l.jpg

The cabinet doors of the cooking and laundry area installed. The cement board on the wall has been installed too.
16gh7qc.jpg

 

The cabinet to cover the MCB and shelfing for shoes done and also a narrower shoe shelfing installed too!

168cuc0.jpg  x6jvvk.jpg

 

Went over during lunch time and I think their work for the day is to clean up the interiors of the WIW and seal the gaps with silicon.

 

Share this post


Link to post
Share on other sites

Door Selection

We went to Yontat a total of 3 times just to get all the door stuffs done. 

The first time we went was to see see look look and asked for a quotation for 4 plain classic hollow doors for the rooms and walk in wardrobe and lookout for the veneer we want for the main door in case we need to change. The second time we went was to confirm the doors for the rooms.  

All along getting a main door was not a priority as the previous door was not in a too bad state when we took over the house. We were thinking maybe we could just refurbish it abit and it will look machiam all new. But the poor door’s condition got worse during the wet works. When we had the new tiling done, the door was abit too low and we had to saw the bottom off abit so that the tiles will not be scratched. We had to say bye bye to the main door. 

This is the first choice of veneer for the main door back then:

rvzjm0.jpg

 

Then when I knew we have to change the door, I went to source for a digital door lock. We’re more inclined to Samsung’s digital lock but Singapore was selling the P718/P728 at about 1 – 1.1K. Its even more expensive than my fire rated main door. Then a friend recommended me to get an export set and so I got it slightly lesser than 50% of what is sold in SG. However, they only have the gold version for export set.

 It's still super worth  :good: 

2lbnaj5.jpg

 

So…the gold digital lock and the veneer that we chose back then doesn’t seemed to match and we went for the 3rd time to choose a veneer that matches the gold digital lock.. and tahdah! That’s our new door!

Door before installing the digital lock:



vw9i96o.jpg

 

Door after installing the digital lock:

2m64ba1.jpg

 

We’re doing the track doors for the master bedroom entrance and the entrance into the walk in wardrobe.
Opted for this so that the doors don’t hinder the switches and its somehow looks more pleasing this way together with the walk in wardrobe door. 
Pardon the painting of the doors as we've only painted the base coat..the white paint layer not done yet.

Track doors opened:

2rgj0vp.jpg

 

Track doors closed:

i5yyk5.jpg

 

 

We imported 2 doorframes that will ultimately have a flush finish with the wall or looking frameless.
This is one of the doors that supposed we’re making to have a flush finish. This door is a pull out door and the other is a push in door. However, I only have the pull out door pic.

We only had the base coat done so the finishing is still not in the desired state and colour.

2zgwv38.jpg

 



 
  • Like 1

Share this post


Link to post
Share on other sites

DIY Project 1

We’ll be doing a few DIY stuffs for the house and this one is the first one!


All along the hubby to be wanted a floating platform bed frame for our bed. Such bedframe looks kinda suspended in the air which he thinks it looks totally awesome.

These are the examples of floating platform bed.

s2y2on.jpg  

t4v2ic.jpg

 

14988s4.jpg

 

Asked around for a few quotes and he decided to do his own floating platform bed after all the carpenters gave us a 4 figure quote. I tried to ask one carpenter myself and they quoted me price starts from 2.2k. Super -.- . He then started to go figure out how to get that done and got all the materials and tadah~ we got a floating platform bed frame at a fraction of what we were quoted! Our carpenter will help us to stick the laminate at the side of the bed frame so that everything will look more refined. We'll put LED strip around the bed to create the feel similar like the pics above.

 2epnars.jpg  105d281.jpg

 

 

Share this post


Link to post
Share on other sites
On 7/18/2016 at 3:40 PM, Starryun said:

Hi,

 

CAn u help me to know where to find the export quality samsung lock

 

thanks

Door Selection

 

We went to Yontat a total of 3 times just to get all the door stuffs done. 

 

The first time we went was to see see look look and asked for a quotation for 4 plain classic hollow doors for the rooms and walk in wardrobe and lookout for the veneer we want for the main door in case we need to change. The second time we went was to confirm the doors for the rooms.  
 

 

All along getting a main door was not a priority as the previous door was not in a too bad state when we took over the house. We were thinking maybe we could just refurbish it abit and it will look machiam all new. But the poor door’s condition got worse during the wet works. When we had the new tiling done, the door was abit too low and we had to saw the bottom off abit so that the tiles will not be scratched. We had to say bye bye to the main door. 

 

This is the first choice of veneer for the main door back then:

rvzjm0.jpg

 

Then when I knew we have to change the door, I went to source for a digital door lock. We’re more inclined to Samsung’s digital lock but Singapore was selling the P718/P728 at about 1 – 1.1K. Its even more expensive than my fire rated main door. Then a friend recommended me to get an export set and so I got it slightly lesser than 50% of what is sold in SG. However, they only have the gold version for export set.

 

 It's still super worth  :good: 

2lbnaj5.jpg

 

So…the gold digital lock and the veneer that we chose back then doesn’t seemed to match and we went for the 3rd time to choose a veneer that matches the gold digital lock.. and tahdah! That’s our new door!

 

Door before installing the digital lock:

 

 


vw9i96o.jpg

 

 

Door after installing the digital lock:

2m64ba1.jpg

 

We’re doing the track doors for the master bedroom entrance and the entrance into the walk in wardrobe.
Opted for this so that the doors don’t hinder the switches and its somehow looks more pleasing this way together with the walk in wardrobe door. 
Pardon the painting of the doors as we've only painted the base coat..the white paint layer not done yet.

 

Track doors opened:

2rgj0vp.jpg

 

Track doors closed:

i5yyk5.jpg

 

 

We imported 2 doorframes that will ultimately have a flush finish with the wall or looking frameless.
This is one of the doors that supposed we’re making to have a flush finish. This door is a pull out door and the other is a push in door. However, I only have the pull out door pic.

We only had the base coat done so the finishing is still not in the desired state and colour.


2zgwv38.jpg

 

 

 

 

 

 

Share this post


Link to post
Share on other sites

Hello,

contractor applying for hdb reno permit. He requested for us to have our IC address changed to the new apartment. He said requirement by HDB.  Please advise if this is required by HDB for themto issue the permit.

 

thanks

 

Share this post


Link to post
Share on other sites
On 9/21/2017 at 9:47 AM, Teebag said:

Hello,

contractor applying for hdb reno permit. He requested for us to have our IC address changed to the new apartment. He said requirement by HDB.  Please advise if this is required by HDB for themto issue the permit.

 

thanks

I don remember clearly on this but I think I changed my IC address after I move into my new house.

(Hope this helps)

 

Share this post


Link to post
Share on other sites
On 21/09/2017 at 9:47 AM, Teebag said:

Hello,

contractor applying for hdb reno permit. He requested for us to have our IC address changed to the new apartment. He said requirement by HDB.  Please advise if this is required by HDB for themto issue the permit.

 

thanks

Dont think this is necessary. My ID just applied for the permit last week and I didnt have to do this. But maybe its because mine is a resale and the flat is still currently under the names of the sellers? We all have to sign an indemnity form though.

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  


×