xevex 0 Report post Posted March 23, 2016 (edited) Hi, can anyone pls advise if this is the norm for HDB reno? Rewiring whole house with additional charges for LEW (licensed electrical worker) single line drawing $300 ? I thought this should be included in the electrical quote already? On top of that, we need to engage PUB testing at $350 which I can understand. But why the drawing fee? Also, how many earth bonding points do I need for a 4rm hdb? No gas pipe. Was quoted 2 points @ $60 each. For changing sub main cable (less than 2metre), I was quoted $220. Is this acceptable? Thanks. Edited March 23, 2016 by xevex Add qns Share this post Link to post Share on other sites