Jump to content
Find Professionals    Deals    Get Quotations   Portfolios
Sign in to follow this  
ryvian

Ryvian Renovation Journey

Recommended Posts

Thanks bro! Yep that's good enough. still considering if I should get lights in there. My single light is bright enough already now! Haha.

I think what ppl usually do is include yellow lights for ambiance in there so you got 2 options when it comes to lights. :D

 

Share this post


Link to post
Share on other sites
Looking for good contractors? Click here for your request

Thanks bro! Yep that's good enough. still considering if I should get lights in there. My single light is bright enough already now! Haha.

I think what ppl usually do is include yellow lights for ambiance in there so you got 2 options when it comes to lights. :D

Yup! My single white light was bright enough for the toilet. The T5 warm light actually make the toilet look even better.

 

Share this post


Link to post
Share on other sites

Taobao Hauls Sneak Preview 2

We just realised that even though the items we bought from taobao are all those small items, there's too plenty to show every single items. These are the items we bought!

gallery_66736_7_295350.jpg

We are intending to settle down before we start unpacking all the taobao loots. I will try my best to show you guys as many of the taobao hauls actual photos as possible. Stay tune...

Edited by ryvian
 

Share this post


Link to post
Share on other sites

Yup! My single white light was bright enough for the toilet. The T5 warm light actually make the toilet look even better.

Haha I feel like don't need the trouble... don't know if I will regret it haha :P

 

Share this post


Link to post
Share on other sites

Oh ya! What's the shop with the $140pfr Caesarstone? I've been quoted super high prices!! Wanna call to check before I settle on my solid top. :( thanks!!

Kara, I will PM you on the contacts. I do not want the salesperson to get scolded for selling so cheap, spoiling the market. But the price was really low. Must go down bargain one.

 

Share this post


Link to post
Share on other sites

Living Room Part 1

living01_zpsop6wdoyk.jpg

living02_zpsmetatfqa.jpg

Wiring work in progress.

living04_zpsijpwrycn.jpg

False Ceiling in progress.

living05_zpsolji70q7.jpg

I got Steven to to construct curtain pelmet. So that I can hide my curtain pole.

living06_zpseqm56yr4.jpg

We had install this 6x4ft mirror at our dinning area

living07_zpsvnfpgelp.jpg

And very soon, the lights are up and first coat of paint is done! The downlights are provided by Steven. We don't have to go around to hunt for downlights.

living08_zpsyizntwtc.jpg

This is how it looked like at night!

living09_zpsl29nl5af.jpg

Our ceiling fan that we bought from JB is installed! I simply love it! As for the dining lights, We got it from Taobao. The dining lights cost me about S$60+.

Edited by ryvian
 

Share this post


Link to post
Share on other sites

Living Room Part 2

living10_zpsbpgk3sui.jpg

Our shoerack with storage seatee under construction.

living11_zpsvv14ixq2.jpg

living12_zpsai2ckqzz.jpg

Our shoerack is done! Very happy with the end product!

Next will be our featured wall with console!

living13_zpskjnkkzrr.jpg

living14_zpsbkabwpkv.jpg

living15_zpsjj7bwrm5.jpg

We felt that the mirror look too plain thus we decided to get Steven to add a frame around the mirror. I really like the mirror with the black frame!

living16_zpsomamabhj.jpg

This DIY clock is bought from Taobao! No drilling required!

living17_zpssqsfej4g.jpg

More photos!

living18_zps2hrqhyrp.jpg

living19_zpstguhppti.jpg

End product with my 65" television!

Edited by ryvian
 

Share this post


Link to post
Share on other sites

Bedroom 2 (Study Room)

  • Supply and install 1 set study table internal white PVC exterior laminate finish cum with soft close drawer track, hinges and door abs edging (13 ft) (table top width not more than 600mm) with tabletop wire management compartment
  • Supply and install top hung cabinet above study table in laminate finish (8.5 ft)
  • Supply and install spray paint glass for in between study table (20 sq) - PURE WHITE
  • T5 lights x2

bed2-01_zpsfuwa85nj.jpg

This is how it look like when we first step into the house.

bed2-02_zpsp6pdz3ky.jpg

Lighting and paintwork done!

bed2-03_zpsgtqtjbfk.jpg

bed2-04_zpsmldmwqzo.jpg

Carpenter at work!

bed2-05_zpsqifqt0qv.jpg

Carpentry is up! Except for the wire management.

bed2-06_zpsizqcrqjy.jpg

bed2-07_zpsjqpa53ev.jpg

Pure white back glass! We specially requested for pure white back glass than normal back glass.

bed2-08_zpsln8xhji9.jpg

bed2-09_zpsul7gbbko.jpg

bed2-10_zpsbt3slwmd.jpg

And finally, with our venetian blinds!

Edited by ryvian
 

Share this post


Link to post
Share on other sites

Bedroom 3 (Guest Room)

  • Supply and install 1 set sliding wardrobe (aluminium frame) internal white PVC exterior laminate finish

For this room, we did not do much except for venetian blinds and one wardrobe. Thus, I will make it short and sweet!

bed3-01_zpsgs6s6nhd.jpg

Before anything is done!

bed3-02_zpsyleveex1.jpg

After paintwork and light.

Finally

bed3-03_zpsbj4udke3.jpg

bed3-04_zpsss6qvpel.jpg

bed3-05_zpsiqby21mq.jpg

Edited by ryvian
 

Share this post


Link to post
Share on other sites

Master Bedroom

  • Supply and install 1 set 2 side exposed sliding door wardrobe (aluminium frame) internal white PVC exterior laminate finish
  • Supply and install 1 set full height dresser with top storage centre mirror and drawer set and 1 unit pull out storage (3 tiler) at bottom 1 side with internal white PVC exterior laminate finish and 1 side open shelves (3 ft)
  • Supply and install false ceiling at wardrobe area
  • Supply and install L-shaped L-box (15 ft)
  • Supply labour and material to box up recess area and reinstate skirting

mbr_01_zpsqcjg7jmk.jpg

False Ceiling

mbr_02_zpsdzk6s3a8.jpg

Box-up done.

Lights, fan and ceiling up!

mbr_03_zpskdi01vai.jpeg

This fan is specially for my wife when she's doing her make-up!

mbr_04_zpsk93huohm.jpg

Start of carpentry work!

mbr_05_zpsnqapwphg.jpg

mbr_06_zpscbjr1vzx.jpg

mbr_07_zpstpvtu9te.jpg

All done!

mbr_08_zpsnxvylan4.jpg

mbr_09_zpsd2l5zgau.jpg

mbr_10_zpsr2f73hi8.jpg

Edited by ryvian
 

Share this post


Link to post
Share on other sites

Living room (Final)

My living room is now equip with furnitures and curtain! Check it out!

living%20final_zps21ghgos4.jpg

Edited by ryvian
 

Share this post


Link to post
Share on other sites

Hi Ryvian,

Appreciate you could PM me Steven's contact & quotation, I really like your Study room carpentary works.

My email is phang_ck@yahoo.com

 

Share this post


Link to post
Share on other sites

I have a similar placement as you did for the master bed room. Where was your aircon placed and how were the pipes routed?

z01aircon_zpswfuaag5v.jpg

z01aircon2_zpsdsa7eoog.jpg

The aircon is actually at the other side.

I had the trunking link to my Bedroom 2 which then link to the toilet. Quite well hidden suggested by the aircon guy!

Edited by ryvian
 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×