Tofu 0 Report post Posted September 28, 2015 Hi everyone,Have purchased a 5room resale of about 1300sq ft and was wondering if the below quote from an ID is reasonable?Am hacking some walls (about 35ft in total) and reflooring the entire flat with wall tiles of kitchen and bathroom but still seems to be very high at a grand total of ~$97500 (inclusive of GST)...Would appreciate if there's any advice or good referrals to contractors or IDs, thanks in advance!DEMOLISH / DISMANTLE / DISPOSAL - total of $6800-demolish wall between master room & passageway to kitchen (subject to hdb approval)-demolish store room wall (subject to hdb approval)-demolish wall between study & living room (subject to hdb approval)-existing kitchen wall tiles & floor tiles-existing kitchen cabinet-existing 2 bathrooms accessories / toilet bolw / shower set / bi-fold door-existing 2 bathrooms wall tiles & floor tiles-existing floor tiles **** / dining / 4 bedroomsPLUMBING WORK - total of $1670- Supply & install expose plumbing system in stainless steel finished at 2 bathrooms & kitchen --> this component alone is quote at $1020 out of $1670 total cost under this category- Supply labour to install kitchen sink/tap (by owner) at kitchen- Supply labour to install basin/tap(by owner) at 2 bath-Supply labour to install W.C.(by owner) at 2 bath-Supply labour to install shower set (by owner) at 2 bath-Supply labour to install spray hose set (by owner) at 2 bath-Supply labour to install accessories(by owner) at 2 bath-Supply labour to install 1 set storage heater (by owner)WET WORK - total of $32110- Haulage charges @ $1,000.00- Supply labour & material to plaster smooth damaged area after hacking @ $650.00- Supply labour & material to construct wall between master & passageway to kitchen @ $1,200.00- Supply & lay selected homogeneous floor tile (tile price $3.50psf) at kitchen & 2 bathrooms @$3,880.00- Supply & lay selected ceramic wall tiles (exposed area) (tile price $3.50psf) at Kitchen & 2 bathrooms @$9,300.00- Supply & lay waterproofing at kitchen / 2 bathrooms @ $450.00- Supply & construct kitchen cement mortar base with side tiles finished @ $480.00- Supply & construct shower kerb at master bathroom c/w full tiles finished @ $150.00- Supply &lay selected homogeneous floor tiles (tile price $3.50psf) at **** / dining / 4 bedrooms @ $15,000.00 PAINTING WORK - total of $2200- Supply labour / material to paint whole house with selected Nippon paint @ $2,200.00 GLASS WORK - total of $5530- Supply & install tempered glass shower screen at master bathroom @ $850.00- Supply & install aluminium frame tempered glass between study & living area @ $4,680.00 DOOR WORK - total of $800- Supply & install 2 set PD door at 2 bathroom entrance entrance @ $800.00 MISCELLANEOUS - total of $1350- chemical asid wash whole house new tiles area @ $450.00- General cleaning of whole house @ $450.00- Floor protection @ $450lll. FURNITURE FITTINGS : Design / construct / install in selected laminate finished - total of $40690 Living :- Full ht L shape feature wall c/w stucco wall & chalkboard paint @ $6,800.00- Full ht shoe cabinet @ $1,200.00 Kitchen :- Top hung kitchen cabinet @ $2,880.00- Bottom kitchen cabinet @ $2,250.00- Tall unit kitchen cabinet @ $800.00- Island bench cabinet @1,100.00- bar counter cabinet @ $880.00- full ht storage cabinet at bar area @2,550.00- selected quartz surface kitchen & island table top @ $5,100.00 Master bedroom :- L shape poles system wardrobe @ $3,500.00- Parapet ht storage cabinet c/w tidy unit drawer @ $1,680.00- Tv feature wall @ $3,500.00- bottom cabinet at recess area below window @ $1,200.00 Study Area :- suspended study table @ $1,500.00- top hung suspended storage cabinet @ $1,500.00- ful ht storage display open bookshelf cabinet @ $3,200.00- bottom cabinet at recess area below window @ $1,050.00 Thanks!! Share this post Link to post Share on other sites
Wade322 1 Report post Posted September 29, 2015 the quoted is on high side and for carpentry works they didnt mention that the length of each cabinet Share this post Link to post Share on other sites
jimmya 3 Report post Posted September 29, 2015 Hi tofu, very expensive, cabinets n floorings also.. Think u better check around. All d best! Share this post Link to post Share on other sites
Renowip 0 Report post Posted September 30, 2015 Hello...My 1st post!I am also reviewing the reno quotations.Whole house painting quoted around $1.5k.Carpentry is the killer if you have a lot of customised furniture ( I am still deliberating).Toilet makeover around $5-6k per unit.Kitchen I get quotes between $8-$14k.Vinyl overlay for living, 4 rooms and kitchen about $5k.Electrical works about $5k, excluding fittings Still looking around before I shortlist. Share this post Link to post Share on other sites
QuinKoh 0 Report post Posted October 2, 2015 Hi all, just wanted to share my renovation experience. Going through the process has been a real eye-opener for my husband and I. The short-listing process, the design process, the material selection process ... it really got quite tiring after a while. But thanks God for our ID - who also has real hands-on construction experience - who is helping us to achieve our dream home step-by-step. As I am still half-way in the process, I can't comment on the carpentry work. But if you are looking for a responsible and meticulous ID, I think you can give my ID a try. His tiling work stunned us ... I'm not sure how long it usually takes to complete the tiling process ... but ours took a good three to four days. I was really happy with the result when I saw how seamlessly the tiles were placed. We have just completed our ceiling and we are equally impressed! If you are interested, drop me a message at floracheong93@gmail.com. I will see if my id wants to link up with you. Share this post Link to post Share on other sites