Jump to content
Find Professionals    Deals    Get Quotations   Portfolios
Sign in to follow this  
ZzzMonster

Second Home First Reno

Recommended Posts


Join 46,923 satisfied homeowners who used renotalk quotation service to find interior designers. Get an estimated quotation

ZzzMonster, you have a lot of carpentry! I have a lot as I want lots of storage space.

Yes, I need lots of storage space as well.... After staying in my current home for more than 10 years, I've accumulated lots of stuff. Despite throwing away some stuff, still got lots more 😅

I even find space in the yard to build cabinet...

Edited by ZzzMonster
 

Share this post


Link to post
Share on other sites

Yes, I need lots of storage space as well.... After staying in my current home for more than 10 years, I've accumulated lots of stuff. Despite throwing away some stuff, still got lots more

I even find space in the yard to build cabinet...

You are more extreme than me as I didn't build any cabinet in the yard :lol:

 

Share this post


Link to post
Share on other sites

When down today, carpentry is almost completed.... Probably another 1 to 2 more days?

Shoe cabinet and TV area cabinets about 90% completed, left doors

image.jpg3_9.jpg

image.jpg2_23.jpg

Haiku fan also fixed up. Isn't it pretty?

image.jpg2_27.jpg

Dining area cabinet also left doors, about 90%

image.jpg3_8.jpg

Edited by ZzzMonster
 

Share this post


Link to post
Share on other sites

Hi zzzmonster,

Do u mind pm me your id contact? My ec top soon n looking for id now. Intend to do lots of storage too. How much is yr Reno cost?

 

Share this post


Link to post
Share on other sites

More updates....

Study and wardrobe room took quite some time, maybe it's more complex, but glad that it's shaping up well, about 80% completed

image.jpg4_7.jpg

We like the laminate for the study table 😎

image.jpg2_24.jpg

Edited by ZzzMonster
 

Share this post


Link to post
Share on other sites

In my earlier post, the bed frame for the master bed room is done wrongly, too low and storage space not high enuf.

Today, the bed frame is taken out...

image.jpg2_25.jpg

The new frame has been brought in today, the carpenter said will install tomorrow

image.jpg1_36.jpg

The Quartz for both bathroom vanity top has been installed, next step will be installation of the sink

image.jpg1_37.jpg

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×