joeyzes 0 Report post Posted March 17, 2016 Hi Jimmy, can you please pm me the contact? Thanks a lot. Share this post Link to post Share on other sites
kelvinwee 3 Report post Posted March 17, 2016 Hi jimmy Actually i feel weird thats the price is to cheap.. Cos u know why? thats i know some contractor they quote u low price n make u to sign the contract after that they charge this n that or maybe they using bad quality product to do ur house... I have been cheap before so better don believe.. I m not a rich guys but i prefer pay more n stay safe Share this post Link to post Share on other sites
jimmya 3 Report post Posted March 17, 2016 Hi kelvin wee, Thanks for ur worries, I have finished renovated already. All my pictures are in page 10 of my thread. U can see from there. Hdb registered contractor, big company, 5 yrs warranty, own factory, workmanship good as well. U can try meeting him up. Responsive guys. No harm anyway nothing to lose for is. Haha. Compare around! Pm u guys already. Anyway my pictures are in pg 10 u can see from there. All d best ! Share this post Link to post Share on other sites
kelvinwee 3 Report post Posted March 17, 2016 only 5 years warranty ? oh ok.. sure Share this post Link to post Share on other sites
Tan Alan 0 Report post Posted March 17, 2016 Hi jimmya, Can you please pm me the ID contact too. Thank you very much Share this post Link to post Share on other sites
Laozhabor 0 Report post Posted March 17, 2016 Wow the price look okay!!! Share this post Link to post Share on other sites
jimmya 3 Report post Posted March 18, 2016 Hi kelvin wee, ya 5yrs warranty which I think is a lot bcoz the rest of the companies is abt 1-2 yrs. moreover they are among top few bigger companies. I went to abt 7-8 Coys last year looking around, even one of them have lifetime warranty. So funny. Where got things lifetime one. What things can be use for so long, cannot think of it. Anyway we just want the best for our house. As long as u are happy, go ahead with the person u feel comfortable with. All d best bro! Share this post Link to post Share on other sites
walterwhite 0 Report post Posted March 19, 2016 (edited) Hello fellow members of Renotalk. Sorry for hijaking your thread. I tried to create my own thread but there seemed to be some error. Moderator, If you could move this post to a new thread please do so. Thanks! I am particularly new to this scene as this is my first time renovating my house after 20 years. Was given a quote by an ID/Contractor. Could you gurus please take a look to see if it is acceptable? I decided to renovate my kitchen and 2 toilets. The quotations are as such below: No Description Amount A. a.) 1. 2. 3. 4. 5. 6. b.) 1. 2. 3. 4. 5. c.) 1. 2. 3. 4. B. a.) 1. 2. 3. 4. 5. C. 1. 2. D. a.) 1. 2. 3. 4. b.) 1. 2. 3. 4. 5. 6. c.) 1. 2. 3. 4. 5. 6. E. 1. 2. 3. 4. 5. F. 1. G. 1. H. 1. I. 1. J. 1. 2. 3. 4. 5. 6. 7. MASONRY WORKS @Kitchen To supply labour, tools & materials to install waterproofing screeding at kitchen $380 floor and wall area. To supply labour, tools & materials to top up floor & wall leveling using prepack 3 in 1 mix $700 cement/sand at kitchen flooring. To supply labour, tools & materials to lay (Size: 300mm x 600mm) heavy duty homogenous $2,150 floor tiles at kitchen floor. (215 sqft.) To supply labour, tools & materials to lay (Size: 300mmx 600mm) homogenous/ceramic wall $4,850 Tiles at kitchen wall. (approx. wall area 485 sqft.) To supply labour, tools & materials to construct kitchen cabinet concrete base at kitchen. $450 To supply labour, tools & materials to install waterproofing screeding at kitchen $380 floor and wall area. @Master Toilet To supply labour, tools & materials to install waterproofing screeding at master toilet floor $180 and wall area. To supply labour, tools & materials to top up floor and wall leveling using prepack 3 in 1 $900 cement/sand at master toilet. To supply labour, tools & materials to lay (Size: 300mm x 600mm) homogenous floor tiles $1,100 at master toilet. (Approx area 68 sqft.) To supply labour, tools & materials to lay (Size: 300mm x 600mm) homogenous wall tiles $2,800 at master toilet. (Approx area 280 sqft.) To supply labour, tools & materials to construct shower kerb at master toilet. $190 -2- @Common Toilet To supply labour, tools & materials to install waterproofing screeding at common toilet floor $200 and wall area. To supply labour, tools & materials to top up floor and wall leveling using prepack 3 in 1 $900 cement/sand at common toilet. To supply labour, tools & materials to lay (Size: 300mm x 600mm) homogenous floor tiles $950 at common toilet. (Approx area 55 sqft.) To supply labour, tools & materials to lay (Size: 300mm x 600mm) homogenous wall tiles $2,600 at common toilet. (Approx area 260 sqft.) CARPENTRY WORKS @Kitchen To supply labour, tools & materials to fabricate & install top hung kitchen cabinet using $2,805 selected laminated finish c/w swing door panel with abs edging internal carcass using white pvc panel with adjustable shelf. (Approx size: L-25.5ft. s D-1 ft. x H-1150mm.) To supply labour, tools & materials to fabricate & install Bottom kitchen cabinet using $2,420 selected laminated finish c/w swing door & drawer panel with abs edging internal carcass using white pvc panel with adjustable shelf. (Approx size: L-22 ft. s D-2 ft. x H-830mm.) To supply labour, tools & materials to fabricate & install tall unit cabinet c/w swing $720 door panel with abs edginginternal carcass using white pvc panel. (Approx size: L-6 ft. s D-1 ft. x H-1150mm.) To supply labour, tools & materials to install 4 sets heavy duty soft close drawer $300 track at kitchen cabinet. To supply labour, tools & materials to fabricate & install suspended vanity cabinet c/w swing $400 door panel using selected laminated finish at master toilet. (Approx size: L-3.5 ft. x D- 400mm x H-500mm.) QUARTZ STONE @KITCHEN To supply labour, tools & materials to install Quartz stone work top at kitchen cabinet. $2,420 (Approx size: L-22 ft. x D-2 ft. x 20mm height profile.) To supply labour, tools & materials to install Quartz stone work top at vanity cabinet. $350 At master toilet. (Approx size: L-3.5 ft. x D-2 ft. x 20mm height profile.) PLUMBING WORKS @Kitchen To supply labour, tools & materials to install exposed (cold) stainless steel water inlet piping $680 Work at kitchen sink & washing machine. To supply labour and tools to install kitchen sink & water tap mixer. $150 To supply labour and tools & install new 40mm water outlet pvc piping works at kitchen sink $300 and washing machine. -3- To supply labour and tools to install water tap for washing machine. $120 @Master Toilet To supply labour, tools & materials to install exposed (Hot/Cold) stainless steel water inlet $300 piping work at master toilet. To supply labour and tools to install wash basin & hot/cold water tap mixer at master toilet. $150 To supply labour and tools & install new 40mm water outlet pvc piping works at wash basin $150 at master toilet. To supply labour and tools to install water tap for washing basin at master toilet. $150 To supply labour, and tools to install spray gun c/w stainless steel water piping work c/w on/off $120 Mini vale at master toilet. To supply labour, tools & materials to install instant water heater at master toilet. $120 @Common Toilet To supply labour, tools & materials to install exposed (Hot/Cold) stainless steel water inlet $300 piping work at common toilet. To supply labour and tools to install wash basin & hot/cold water tap mixer at common toilet. $150 To supply labour and tools & install new 40mm water outlet pvc piping works at wash basin $150 To supply labour and tools to install water tap for wash basin at common toilet. $150 To supply labour, and tools to install spray gun c/w stainless steel water piping work c/w on/off $120 Mini vale at common toilet. To supply labour, tools & materials to install instant water heater at common toilet. $120 ELECTRICAL WORKS To supply labour, tools & materials to install new lighting point at kitchen. $120 To supply labour, tools & materials to install new lighting point at common toilet. $120 To supply labour, tools & materials to install new (2 x 13A) double power point x 4 nos. $720 at kitchen To supply labour, tools & materials to install new cooker hood power point 1 x 20A $120 on/off switch at kitchen. To supply labour, tools & materials to install new (1 x 20A) water heater power point c/w $190 on/off switch socket at common toilet. GENARAL CLEANING WORK To supply labour and tools to provide acid cleaning to upon completion of all works. $400 PAINTING WORKS To supply labour, tools & materials to paint kitchen and part of living room cornices $600 ceiling using NIPPON paint finish. CEILING WORKS To supply labour, tools & materials to install simple cornices **** room. $400 SHOWER SCREEN To supply labour, tools & materials to install 10mm thick tempered clear glass shower screen $580 c/w 1 fx and 1 panel swing door panel at master toilet. PD DOOR To supply labour, tools & materials to install powder coated Aluminium frame with acrylic $760 panel PD door at master & common toilet. -4- To supply labour, tools & materials to install powder coated aluminium frame with acrylic $680 panel PD door at kitchen entrance. To supply labour, tools & materials to install new aluminium frame with clear glass $180 casement window at master toilet. To supply labour, tools & materials to install new aluminium frame with clear glass $180 casement window at common toilet. To supply labour, tools & materials to install ceiling fan at bedroom. F.O.C To supply labour, tools & materials to install ceiling fan **** room. F.O.C To supply labour, tools & materials to install 1 no. power point **** room. F.O.C Grand Total Amount $: $36,125 Please give me your valuable advice. Thanks alot! Edited March 19, 2016 by walterwhite Share this post Link to post Share on other sites
zaterdag 0 Report post Posted March 19, 2016 Hi Jimmy can pm me your contact? Thank you Share this post Link to post Share on other sites
jimmya 3 Report post Posted March 19, 2016 Hi walterwhite, no no worries we are here to share informations. Some price like plumbling n electricity quote on the high end tats y can give free items. While carpentry on the lower side which have to make sure that the workmanship is good. Coz kitchen cabinet varies from 110 - 170 per ft. I think can ask for abit lesser yay my opinions. Nego with them la. All d best! Share this post Link to post Share on other sites
7ustus 0 Report post Posted March 28, 2016 (edited) Hi jimmya, not sure if this is still an active thread, but how's the workmanship and quality like so far? Seeing that your works have been done for almost half a year. Pardon me as we will be getting our keys soon and thought the process though tiresome would be easy since we know what we want, but boy! we cannot be more wrong with all the IDs and contractors there eyeing us like walking carrot heads. can share your contacts via PM? TIA! Edited March 28, 2016 by 7ustus Share this post Link to post Share on other sites
Luner 0 Report post Posted March 29, 2016 Hi Jimmya, Nice of you to share the progress of your reno with us. I'm looking around now for reno ideas and contacts for my new house. Can PM me your ID contacts? Share this post Link to post Share on other sites
Sanman 0 Report post Posted March 29, 2016 Hi Jimmya, could you pls share your ID contact details Thank you very much Share this post Link to post Share on other sites
TrilsikA 0 Report post Posted March 29, 2016 Hi JimmyA, I know I'm new here but is it ok if you shared with me your ID contact details? Appreciate it, Thank you. Share this post Link to post Share on other sites
jimmya 3 Report post Posted April 1, 2016 Hi guys pm u already, i have my pictures in my page 10 u can take a look. Simple Reno. All d best! Share this post Link to post Share on other sites