Jump to content
Find Professionals    Deals    Get Quotations   Portfolios
Sign in to follow this  
jimmya

Is This Quote Cheap And Reasonable?

Recommended Posts

Looking for good contractors? Click here for your request

Hi there

Can u pm me this ID pls.

Thanks

Hi all,

I received this from my ID, is it reasonable? So far this is the lowest that i had got from 5 IDs.

Do advice.

Thanks

Construct 50mm kitchen base 11.5ft - $420

Construct fridge base - $150

Construct washing machine base - $150

Supply cement, material n labour to lay 600x600 Homogeneous tiles for living room - $3360

Supply cement, material n labour to lay 600x600 Homogeneous tiles for master bedroom room - $1800

Supply cement, material n labour to lay 600x600 Homogeneous tiles for bedroom 2 - $1180

Supply cement, material n labour to lay 600x600 Homogeneous tiles for bedroom 3 - $1100

Supply labour to install 1 gallon heater - $120

Supply labour to install kitchen sink & tap on existing point - $100

Supply labour & material to lay 2” conceal drainage PVC for kitchen sink and washing - F.O.C.

Design, Fabricate & Install est(11.5ft) Kitchen top cabinet in solid-ply finish with high grade EDL/LAMITAK laminate - $1495

Design, Fabricate & Install est(11.5ft) Kitchen top cabinet in solid-ply finish with high grade EDL/LAMITAK laminate - $1495

c/w Blum Hinges

c/w Color polygon

- all doors in ABS Trimming

- 1 set of hydraulic hinge gas spring

- 1 set of sand blast glass panel

- 1 set of cultery tray

- 1 nos.of 2 tier dish drainer

- labour to install cooker hood & hob - F.O.C

Design, Fabricate & Install 8ft tv console - $1040

Design, Fabricate & Install 8ft Feature wall - $1600Design, Fabricate & Install Full Height Shoe Cabinet - $850

Design, Fabricate & Install Full Height Sliding Wardrobe est 6ft - $1560

Supply Labor & Materials to construct LBOX **** area - $1120

Custom made & install 11.5ft Quartz - $1265

Fabricate & install Glass Casement door at kitchen Entrance - $550

Fabricate & Install Shower Screen casement door at master bathroom - $500

Fabricate & Install Shower Screen sliding door at common bathroom - $550

Painting of whole unit using Nippon Original Paint using 5 nos. Colors - $1250

- all internal wall with Nippon Vinilex 5000 paint

- ceiling using Nippon Maxtex white color paint

Corrugate Paper for Protecting Existing Flooring - $180

Whole house general cleaning - $200

Chemical Washing - $200

Total $22235.

Do advice and help me out.

thanks

 

Share this post


Link to post
Share on other sites

Hi jimmya, how's renovation coming along for ur nice house, don't mind can share with me ur contractor contact? And also, how long before the contractor will come back with a quote?

 

Share this post


Link to post
Share on other sites

hi gfkid,

so far so good, had done up my laminate floors and lightings andkitchen cabinet too.

will post some pictures tonite. was busy at work and rushing everything.

pm u guys already.

all d best!

 

Share this post


Link to post
Share on other sites

So sorry was busy with work... laminate flooring up. but still have click clat sound, they says need time to stable.

well we shall see.

med_gallery_70346_8_48046.jpgmed_gallery_70346_8_58261.jpgmed_gallery_70346_8_34937.jpgmed_gallery_70346_8_90027.jpg

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×