Skyfish88 0 Report post Posted August 7, 2015 Hi jimmya can pm me your id contacts Thanks Share this post Link to post Share on other sites
James Hong 2 Report post Posted August 7, 2015 (edited) Hi jimmya Please PM me your ID. Thanks. Edited August 7, 2015 by James Hong Share this post Link to post Share on other sites
Andrew New 3 Report post Posted August 7, 2015 Hi jimmya, Can pm me the id as well. Thanks. 1 Share this post Link to post Share on other sites
paopei 0 Report post Posted August 7, 2015 Hi, please pm your ID. Thank you Share this post Link to post Share on other sites
jimmya 3 Report post Posted August 7, 2015 hi,pm nid, skyfish already.all d best! Share this post Link to post Share on other sites
jimmya 3 Report post Posted August 7, 2015 Dear ALL fellow owners !just an advice. don't be like me, only 1 mth before getting my keys then i confirm my contractor..then i had to rush like **** on my house renovation concepts, designs, shop for furniture (based on the extra space that i have).eg. dining table not more than 1.5m length.... sofa max. lenght i can buy is 2.3m......especially the lightings bcoz all this can be hidden in the renovations behind the wall or cabinets so that we cannot see the wiresand look much nicer. Like for my case i only got 4 sat/suns to see all this.Go jalan besar, balestier, ikea, furniture mall, etc..... to shop shop.....then my wife fussy some more headacheand tiring man. If can, give yourself at least 2 mths.3d drawings also take 5-10 days, then amend again another few days.so 3 mths before hand will be very comfortable and less taxing on health. haha!!all d best! Share this post Link to post Share on other sites
Shazy 0 Report post Posted August 7, 2015 Hi can pm me your id ctc and company name? Thks Share this post Link to post Share on other sites
jefftan 0 Report post Posted August 8, 2015 hi,pls pm me ur contractor.want to meet him urgently.thanks Share this post Link to post Share on other sites
Watzson 0 Report post Posted August 8, 2015 hi can pm me the id ?thanks.Alex Share this post Link to post Share on other sites
Guest Vicki Goh Report post Posted August 9, 2015 Same here..i left 1 and the half month to collect keys...still have not confirmed anything yet Share this post Link to post Share on other sites
jimmya 3 Report post Posted August 10, 2015 hi vicki,then faster decide la unless u are not in a hurry to move in.dont forgot u still need to pay installment too, lol. Share this post Link to post Share on other sites
ericgan10 1 Report post Posted August 10, 2015 hi jimmy, met him on sat. check with u something.ur master bedroom, the dressing table u did to full height, the shelving compartments, can i design it to what i want?i forgot to ask him.ur kitchen if without the side walls, where to hide the gas pipe?must come with the walls?thanks Share this post Link to post Share on other sites
Guest Vicki Goh Report post Posted August 10, 2015 hi vicki,then faster decide la unless u are not in a hurry to move in.dont forgot u still need to pay installment too, lol.Hahaha..ya already have ID in mind just need to touch up only before signing ...erm i still have house to live now so not very in hurry too so i really want to make this house very good to live in... Share this post Link to post Share on other sites
davetan 0 Report post Posted August 10, 2015 hi jimmya,like ur designs... can pm me ur contractor...how long is the warranty? becoz a lot of id/contractors only giving out 1 -3 years warranty.most of the time, after warranty period over sure spoil.. i dun wanna waste time n money to repair.thanks Share this post Link to post Share on other sites
Guest Vicki Goh Report post Posted August 10, 2015 btw Jimmya..my house also punggol opal too... Share this post Link to post Share on other sites