nextstep 3 Report post Posted October 27, 2015 Show u soon!And of course! I will invite y'all if you guys wanna come if u invite I sure come, will bring tea also for u Share this post Link to post Share on other sites
bykaraanne 30 Report post Posted October 28, 2015 Sprayed handles:Ceiling fan with medallionSame fan but in 46" size for both bedrooms. The fans look comically large in the center with shorter blades... Lol. Prefer my current model look but works well. Also a bit low on the ceiling... Share this post Link to post Share on other sites
bykaraanne 30 Report post Posted October 28, 2015 Marble solid top coming SATURDAY!!SY Windows and Bifold doors supposedly today, Edmund wants to push it to after plumbing.Room doors TOMORROW!Carpentry touch up TOMORROW!glass door and vanity NEXT TUESDAY!Plumbing NEXT WEDNESDAY!Chemical washing NEXT SATURDAY!Handover also on Saturday. Monday all the furniture will come in.Then....... Paint door following Saturday! + paint touch up Share this post Link to post Share on other sites
Ahyong81 3 Report post Posted October 28, 2015 Lol so fast .... Share this post Link to post Share on other sites
hc28 0 Report post Posted October 28, 2015 Sprayed handles:Ceiling fan with medallionSame fan but in 46" size for both bedrooms. The fans look comically large in the center with shorter blades... Lol. Prefer my current model look but works well. Also a bit low on the ceiling...signature LV bag sighted! haha. the gold handles look nice with your cabinet laminates.for the fan, i think will be less obvious when its on. i think should be fine! Share this post Link to post Share on other sites
bykaraanne 30 Report post Posted October 28, 2015 Lol so fast ....My husband sayI must be the only one who move in with ALL THE DECOR bought HahahahaBut bad news - my solid top threatens to delay till mid Nov. so if really delay so long + Silestone have by next week, I might go Quartz Share this post Link to post Share on other sites
bykaraanne 30 Report post Posted October 28, 2015 signature LV bag sighted! haha. the gold handles look nice with your cabinet laminates.for the fan, i think will be less obvious when its on. i think should be fine!Hahaha, can't put anywhere else cus electrician was here. Thanks! Not shiny enough though.The fans cute la like baby fat fat one haha! Share this post Link to post Share on other sites
nextstep 3 Report post Posted October 28, 2015 swee swee liao, the handle looks good with the white cabinet. so if the solid top no stock are you going to wait or you will just go for the alternative? Share this post Link to post Share on other sites
doubleEM 4 Report post Posted October 28, 2015 lack of stock for the solid top is a definate bummer since my original choice with the granite was the same too.Don't know too many reno going on these days haha or lack of stones going around Gold looks great...its too fast too furious from here really. Congrats. Share this post Link to post Share on other sites
bykaraanne 30 Report post Posted October 28, 2015 I called to scold them LOL cus they promised us and then we scheduled everything accordingly. So not fair to my contractor as well.Lo and behold! Miracle! They can have the stock in on Tuesday and fabricate by next Friday / Saturday. Still not too bad. If really don't have, then I might get Silestone Lagoon. Share this post Link to post Share on other sites
Ahyong81 3 Report post Posted October 28, 2015 This week too fast and furious for you and me, but that also means that there will be a lot of issue going on... Share this post Link to post Share on other sites
bykaraanne 30 Report post Posted October 28, 2015 This week too fast and furious for you and me, but that also means that there will be a lot of issue going on... Yeah lor. Hai Share this post Link to post Share on other sites
doubleEM 4 Report post Posted October 28, 2015 I called to scold them LOL cus they promised us and then we scheduled everything accordingly. So not fair to my contractor as well.Lo and behold! Miracle! They can have the stock in on Tuesday and fabricate by next Friday / Saturday. Still not too bad. If really don't have, then I might get Silestone Lagoon.Good to hear it all worked out in the end Share this post Link to post Share on other sites
nextstep 3 Report post Posted October 28, 2015 finger x for you, hope they will have the stock.take a quick look at Silestone website, the Lagoon looks good as well. Share this post Link to post Share on other sites
bykaraanne 30 Report post Posted October 29, 2015 Good to hear it all worked out in the end finger x for you, hope they will have the stock.take a quick look at Silestone website, the Lagoon looks good as well.Yeah lor, hopefully they keep their promise and honor their word. Anyway my dining chairs also delayed with the TB seller, so even during move in still have quite a bit of stuff to come in. I think I'm impatient, wanna move in when everything is 95% ready, even decor, so small things put me off. But must learn to be patient and lean in with the house slowly being built up from the things we buy. Now time to wait. Hopefully they update/confirm with my contractor today, if not I will be forced to change supplier. Share this post Link to post Share on other sites