tjx3 0 Report post Posted June 13, 2015 (edited) As a aboveFor both toiletis a 4 rm HDBjust change of floor tite water basintoilet boilheater 5k is it enough?do intro me if u had a contractor which is good and within my budgetThanks Edited June 13, 2015 by tjx3 Share this post Link to post Share on other sites