Nana Chan 0 Report post Posted May 12, 2015 (edited) Orh those sewage piping you didnt change out? Is advisable to change it. Just my 2 cents Oh.. you mean the big pvc pipe connecting upstair and downstair? It didn't come across my mind that those can be changed until you mention it.. Cos my parents house is also resale and they also choose to paint it over, many years now I see no problem..If not wrong for those big pvc pipe connecting to upstair and downstair.. can only change the middle part (joint area). Edited May 12, 2015 by Nana Chan Share this post Link to post Share on other sites
mummychua 4 Report post Posted May 12, 2015 Oh.. you mean the big pvc pipe connecting upstair and downstair? It didn't come across my mind that those can be changed until you mention it.. Cos my parents house is also resale and they also choose to paint it over, many years now I see no problem..If not wrong for those big pvc pipe connecting to upstair and downstair.. can only change the middle part (joint area). we are not allow to change the big waste pipe. Share this post Link to post Share on other sites
Nana Chan 0 Report post Posted May 12, 2015 HI...can you share your ID details with me? Thank you in advance =)Hi~ sorry i missed your msg yesterday.. Just pm-ed you.Good luck! Share this post Link to post Share on other sites
Nana Chan 0 Report post Posted May 12, 2015 we are not allow to change the big waste pipe. Hi~ I just asked my ID and he said can be change..but then only the middle part of the pipe can be change. Very expensive too $800 per toilet pipe.He suggested to leave it for now, if in future really got leakage can call up HDB/PUB to change and it will be cheaper as they have their own tendered or in house technician for that. Share this post Link to post Share on other sites
Nana Chan 0 Report post Posted May 12, 2015 (edited) Updates from Yesterday~Mitsubishi Electric Multi Split Air ConditionerMXY- 4A28VA C/WMSY - GE18VA X 1MSY - GE13VA X 1MSY - GE10VA X 2 Edited May 12, 2015 by Nana Chan Share this post Link to post Share on other sites
Nana Chan 0 Report post Posted May 12, 2015 (edited) Window Installation~Electrician at work~ Edited May 12, 2015 by Nana Chan Share this post Link to post Share on other sites
Nana Chan 0 Report post Posted May 12, 2015 (edited) Old clothes rail removed..Rewiring in progess..All pictures above are live updates by Dennis, while both of us busy at work.. Edited May 12, 2015 by Nana Chan Share this post Link to post Share on other sites
Nana Chan 0 Report post Posted May 12, 2015 (edited) MBR Toilet.. Sorry for the poor images.. inspection at night. XDCommon Toilet..Service Yard washing machine base.. Kitchen floor & wall, with bottom cabinet base all nicely done up.. Edited May 12, 2015 by Nana Chan Share this post Link to post Share on other sites
Nana Chan 0 Report post Posted May 12, 2015 And below are the laminate & all the design related stuff we selected at the beginning of our reno..All our carpentry works will be light wood grain + high gloss white. Simple and easy.. Living - Tv swivel & Shoe cabinetMBR - Closet ExteriorMBR - Closet InteriorKitchen - Kompacplus Boston Cherry work top + High gloss white cabinetsEvorich HERF Flooring - Amsterdam Eggshell for Living + 3 BedroomsT268 Veneer Doors for Living + 3 Bedrooms Share this post Link to post Share on other sites
Nana Chan 0 Report post Posted May 12, 2015 (edited) Handle for Main Veneer Door (Living)Handle for 3 Bedrooms Veneer DoorsMBR + Common Toilet Solid Top + Vanity Cabinet - PA627 OPAL + High Gloss WhiteBi Fold Door for Common Toilet and Service Yard - MF81 + White Powder Coated FramePD Door for MBR Toilet - MF92 + White Powder Coated Frame Edited May 12, 2015 by Nana Chan Share this post Link to post Share on other sites
Nana Chan 0 Report post Posted May 12, 2015 (edited) (Timeline provided by Dennis) :Next up~12th May - Change all water pipes to stainless steel / Doors Measurement (done)13th May - Debris Removal (done)15th May - Running of City Gas Pipe (done)16th May - Plaster expert to do finishing for the windows along corridor (done)18th May - Chemical Wash to prepare for overlay flooring (done)18th May - Wrought Iron Gate Installation (done)19th May - Evorich HERF Flooring Installation / All other window works & window grilles installation (done)So far no major hiccups and we've been quite happy with how everything is turning out.. Small issues along the way are rectified promptly and apologised to which is cool.. PS: Dennis upgraded our service yard fixed glass panel from silver frame (quoted) to white powder coated frame in order to match our chosen door. Such thoughtful gesture..really made my day. Edited May 20, 2015 by Nana Chan Share this post Link to post Share on other sites
Nana Chan 0 Report post Posted May 18, 2015 (edited) Shopping Time~Did more shopping over the weekend..Here's what we bought.Rinnai Instant Heater (Common Bathroom)42” LG ULTRA HD 4K TVVelvet Hangers~Washing Machine Rack4 Tier Slim Movable RackWhite Pine Wood Fold-able Side Table Edited May 18, 2015 by Nana Chan Share this post Link to post Share on other sites
Nana Chan 0 Report post Posted May 18, 2015 (edited) Roman Numerals Clock Princeton 707 Instant Heater (Champagne Colour) - For MBR Bathroom....Getting these soon too.. Edited May 18, 2015 by Nana Chan Share this post Link to post Share on other sites
Nana Chan 0 Report post Posted May 19, 2015 MBR Bathroom.. (this was taken before chemical wash)MBR (this will be the mini walk in closet area)MBR - sealed up and plastered old air con unit wall..Electric works in kitchen, new stainless steel water pipe and copper gas pipes. Share this post Link to post Share on other sites
Nana Chan 0 Report post Posted May 19, 2015 (edited) Kitchen after chemical wash yesterday..Service Yard after chemical wash. All new stainless steel water pipes now..love my new windows.. Common bathroom after chemical wash..HERF Flooring laying today.. Amsterdam Eggshell Checked. Edited May 19, 2015 by Nana Chan Share this post Link to post Share on other sites