cable83 0 Report post Posted March 31, 2015 (edited) Hi All, I am a first time buyer and very lost on renovation. So appreciate advice if these items are reasonable.Kitchen Area:1. To do base for kitchen cabinet. - $400.00 2. "Supply & install one set kitchen cabinet with selected laminate & abs trimming up & downest 22ft c/w s. steel dish rack at right wall kitchen". - $2,640.00 3. Supply & install Quartz top for cabinet est 11ft at right wall kitchen area. - $1,320.00 4. Supply & install kitchen cabinet at left wall kitchen up & down est 15ft. - $1,800.00 5. Supply & install 4ft Quartz table top at left wall kitchen. - $480.00 6. To do sink support at kitchen sink area. - $750.00 7. Eletrical point at kitchen & change est 2 pcs wall tiles. - $200.00 8. Connection for kitchen sink. - $100.00 9. Supply & install tempred glass backing at cabinet area est 15ft. - $900.00 Remarks : If only cooker area $180 KITCHEN YARD: 1. Supply & install aluminium 3 track sliding window c/w aluminium grills LIVING & DINING AREA:1. Supply & install false ceiling at main entrance , dining area & walk-way c/w curtain pelmet at window living with one side L-box. - $1,100.00 Remarks : If living need cove light design + $ 300 2. To do looping point est 10 nos with labour installation down light & one ceiling fan. - $420.00 Remarks : If have cove light add 4 point +$ 140 3. Supply & install one nos 4ft full height shoe rack with design at entrance. - $1,200.00 4. Supply & install tv feature wall c/w console with design est 11ft. - $3,520.00 Remarks : If 8ft $ 2560 5. Install one nos scv point , 2 double point & main control at tv area. - $180.00 MASTER BEDROOM: 1. Supply & install one nos 6.5ft sliding wardrobe. - $1,885.00 BEDROOM 2: 1. Supply & install one nos 5.5 sliding wardrobe at room 2. - $1,595.00 2 TOILET:1. Supply labour to install 2 toilet assoseries & one heater tank. - $160.00 2. Supply & install one nos bi-fold door at master toilet. - $220.00 3. Supply & install cabinet at vanity master toilet. - $300.00 4. To do one kerd at master toilet. - $120.00 5. Supply & install one nos 10mm tempred glass shower screen at m.toilet. $450.00 6. To do one L-shape kerd at c.toilet. - $120.00 7. Supply & install L-shape shower screen at c.toilet. - $680.00 OTHER:1. To do whole house painting ( original paint ). - $1,250.00 2. Haulage & debris. - $250.00 3. wash & clean up window. - $180.00 4. Supply labour to install 3 bedroom light , balcony , 2 toilet light. - $80.00 5. Supply & install living & 3 bedroom grills est 95sqft. - $665.00 Total $ 23,615.00 Edited March 31, 2015 by cable83 Share this post Link to post Share on other sites
kangeroo168 10 Report post Posted March 31, 2015 hmm... quite reasonable, but can get at a lower price by a bit if u shop around.. Share this post Link to post Share on other sites
cable83 0 Report post Posted April 2, 2015 hmm... quite reasonable, but can get at a lower price by a bit if u shop around..Thanks Kangeroo168. do u think if anything missing? Share this post Link to post Share on other sites
kangeroo168 10 Report post Posted April 2, 2015 don't quite understand by 'anything missing'... u mean your contractor forget input something for u, then later become hidden cost?what i can see is the the service yard window and grille no pricing lor... and haulage no input price Share this post Link to post Share on other sites
Tiler Seng 57 Report post Posted April 3, 2015 ok lah...quite competitive, consider on the mid-high side,btw, you can try my service Share this post Link to post Share on other sites
Wade322 1 Report post Posted April 7, 2015 yea the price is a little bit high. Share this post Link to post Share on other sites
hellothere 0 Report post Posted April 8, 2015 Here's my quote (elements that compare to yours)1. To do base for kitchen cabinet. - $400.00 Base $200, 8ft.2. "Supply & install one set kitchen cabinet with selected laminate & abs trimming up & downest 22ft c/w s. steel dish rack at right wall kitchen". - $2,640.00 8 ft cabinet - 960.3. Supply & install Quartz top for cabinet est 11ft at right wall kitchen area. - $1,320.00 iquartz 8ft - 10408. Connection for kitchen sink. - $100.00 Sink and tap - $100 LIVING & DINING AREA:1. Supply & install false ceiling at main entrance , dining area & walk-way c/w curtain pelmet at window living with one side L-box. - $1,100.00 Remarks : If living need cove light design + $ 300Cove lighting - $800 (54ft) 4. Supply & install tv feature wall c/w console with design est 11ft. - $3,520.00 Remarks : If 8ft $ 25604ft - $1,,280 MASTER BEDROOM:1. Supply & install one nos 6.5ft sliding wardrobe. - $1,885.00 6 ft swing door - 2,200 BEDROOM 2:1. Supply & install one nos 5.5 sliding wardrobe at room 2. - $1,595.00 2 TOILET:1. Supply labour to install 2 toilet assoseries & one heater tank. - $160.00 Accessories $80 / Heater tank $1002. Supply & install one nos bi-fold door at master toilet. - $220.00 Aluminium PD door 450. OTHER:1. To do whole house painting ( original paint ). - $1,250.00 Painting - 13002. Haulage & debris. - $250.00 Haulage 750. Share this post Link to post Share on other sites
cable83 0 Report post Posted January 8, 2017 To those of you view and reply. Thanks you all!!! And sorry for the late thank you. End up everything go well and move in last year :DDD with good service, no hidden costs and save alot on my light and toliet accessories! Share this post Link to post Share on other sites
sherli 0 Report post Posted January 9, 2017 Hi Caleb, would you be able to share the contractor's contact? Many thanks Share this post Link to post Share on other sites
cable83 0 Report post Posted January 9, 2017 8 hours ago, sherli said: Hi Caleb, would you be able to share the contractor's contact? Many thanks PM u liao Share this post Link to post Share on other sites
cable83 0 Report post Posted January 18, 2017 PM u all liao.... Share this post Link to post Share on other sites
Kotan 0 Report post Posted January 24, 2017 It's expensive ? For Haulage & debris :$900 Share this post Link to post Share on other sites
kangeroo168 10 Report post Posted January 25, 2017 21 hours ago, Kotan said: It's expensive ? For Haulage & debris :$900 hi kotan, it depends on what u are hacking/moving/disposing. because different jobscope have different prices. anyway I pm u one professional haulage people. u might want to check out with them. Share this post Link to post Share on other sites
Kotan 0 Report post Posted January 25, 2017 thanks for the information Share this post Link to post Share on other sites
Kotan 0 Report post Posted January 25, 2017 24 minutes ago, kangeroo168 said: hi kotan, it depends on what u are hacking/moving/disposing. because different jobscope have different prices. anyway I pm u one professional haulage people. u might want to check out with them. Thanks for the information Share this post Link to post Share on other sites