In the meantime.. some mood board for our bedroom

17097232710_04486a1366_b.jpg

17077341207_53f8910fe6_b.jpg

17284268111_503f14d45c_b.jpg

17258822226_cbd0a2b555.jpg

17097226970_dd808b031f.jpg

As you can tell, I'm a big fan of all things bright and airy.. But my hubs is more into scandi-industrial.. So in order to compromise, we are going to change our theme to Scandi- industrial (for kitchen & living area) and scandi designs for all bedrooms!

 

Share this post


Link to post
Share on other sites
Looking for good contractors? Click here for your request

These recent week, I didn't have much to update as progress is abit slow at the moment.

Basically these are the works done:

  • Aircon Piping,

16782670184_df40f1434b_c.jpg

This is from the MBR. Didn't have much chance to take more pics cause the tilers are waiting for me to be done in order to lay tiles...

I was so worried that the aircon piping will be horrendous.. but to my surprize.. it's actually quite neat! I just need to box up the piping that's under the MBR beam. Going to install the units next week!!

  • Laying of floor tiles


17218976009_1791c8bd81_c.jpg

Living Room tiles (Cement screeding look a like)

16782680374_ae071b5167_c.jpg

All bedroom tiles (wood look a like)

Mr E whatapp me that today flooring is all done.. but he didn't send me any photos to show me though. Next up, will be craftstone.

Supposed to start hacking the kitchen wall today however HDB has yet to approved our permit! Haiz. gotta chase them again! =(

 

Share this post


Link to post
Share on other sites

These are the items that we have purchased!

  • Sofa - Fortytwo.sg

16783653574_d7d13bf5d4.jpg

  • Kitchen Sink & Mixer (Blanco from Hoe Kee)

16784949803_ceb647ee77.jpg

17219009409_f429cf8d0d.jpg

Got this set at their promotional price... I didn't do much homework on kitchen stuffs cause I don't really cook so basic stuffs will do.

  • Kitchen Hob & Hood (Kuche from GAB

17379228966_9afbb8fac6.jpg

17403250302_cbc1ca5a21.jpg

Super happy to have find this combination at a price is that way below my budget!!!

  • Dining table set (Purchased from Taobao)

17404338942_5f97428dc7.jpg

 

Share this post


Link to post
Share on other sites

17219009409_f429cf8d0d.jpg

Just want to point out a small issue with this type of tap.

Due to the curve design, when after usage and close the tap, the balance water in the curve part will continue to drain out.

Some may find it a nuisance, some may get use to it.

 

Share this post


Link to post
Share on other sites

Just want to point out a small issue with this type of tap.

Due to the curve design, when after usage and close the tap, the balance water in the curve part will continue to drain out.

Some may find it a nuisance, some may get use to it.

Hi there...

Thanks for sharing.. maybe I should go Hoe Kee and check out again and see what are my option before they deliver the goods to my place.

 

Share this post


Link to post
Share on other sites

Just want to point out a small issue with this type of tap.

Due to the curve design, when after usage and close the tap, the balance water in the curve part will continue to drain out.

Some may find it a nuisance, some may get use to it.

Just received my 3D drawings from Mr E...

Not finalize yet as we have afew changes here and there.

Kitchen

17327931650_378b07187f_z.jpg

Shoe Rack

17327733098_1be1e045ae_c.jpg

There are quite a few changes to be done on the shoe racks, eg, the ventilation vent to change its color to black etc.. Plus I requested for a suspended shoe rack.. =(

Master bedroom

16895203193_6589cdb69d_z.jpg

Something simple for the bedroom.

Going to inform Mr E on the amendments on the 3D drawings and see how's the final draft going to be like.

So far from my contacts with Mr E & J are quite good.. Just some minor details which they can forget. However I don't blame them as I know they have quite few projects ongoing so I don't expect them to remember everything.

Will share more when its time for carpentry works

 

Share this post


Link to post
Share on other sites

Kitchen

17327931650_378b07187f_z.jpg

Nice clean look! :good:

Ever thought of adding more storage top hung cabinets? You will be surprise the a mount of things/appliances needed in the kitchen.

I see that you have no built in oven but maybe you may have a microwave. Have to ensure counter top cater space for it.

Also not forgetting the num of 3 pin wall plug needed in the kitchen. :)

 

Share this post


Link to post
Share on other sites

Since our renovations are underway, it's time for the shopaholic me to shop!!

We are planing to purchase most of the items from TB.

17592071475_b47f071917_z.jpg

The toilets accessories shipments are on its way to SG.. so I'm hoping that the quality will be good!!

In the meantime, our renovation permit has been approved and within 2 days, walls are being hacked.

16968674304_c66578a291_z.jpg

17591206385_073b477f31_z.jpg

Yohoo!!!

 

Share this post


Link to post
Share on other sites

Hello.. its been a while since I've updated the renovation progress as we didn't have much time to go up to our place to check out..

17997663478_96c663a59c_z.jpg

The walls has been hacked and one part of the kitchen wall is begin cement screed.

17997708958_d8b147935a_z.jpg

Protective layers are placed on the floor

17999378049_08ea33ba8c_z.jpg

Base for the Kitchen Sink

17997868960_da4147789c_z.jpg

Base for Kitchen's cabinet

18185588885_93ef6c6c53_z.jpg

Breakfast counter up

 

Share this post


Link to post
Share on other sites

18160081706_562fa50c49_z.jpg

Aircon are up too.. Didn't want to install the aircon unit till at least the carpentry works are 80% done. However there is some boo boo, ended up the aircon guy install my units when my renovation is only 30% done. Haiz..

18186578015_dcd6ba3560_z.jpg

Aircon pipping are all boxed by!

17998863640_12b969e0ac_z.jpg

Got my contractor to change the bomb shelter ventilation vent. Cause it's pretty eye sore to see the silver thingy protruding out!

18187751431_acfa92e834_c.jpg

Walls has been painted with 1st coat of paint.. As you can see no doors yet for both the bedrooms and toilets.

Bedroom doors will be installed by mid of June...

18000365639_a8e84e5c63_c.jpg

Tempered Glass Shower Panel is up.. Waitin for my contractor to install the rainshower set that I've purchased from TB.

17563990144_931505663d_c.jpg

Conduits for tracks lights! No lights for our place as we are eagerly waiting for our light shipment from TB to arrive in SG.

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×