Jump to content
Find Professionals    Deals    Get Quotations   Portfolios
Sign in to follow this  
ILJ

New Quote. Pls Advice.

Recommended Posts

Items

Description

Amount

A

Dismantling & Demolition Works

01

To hack the toilet floor tiles and wall tiles (At common toilet)

02

To hack the toilet floor tiles and wall tiles (At master toilet)

03

To hack kitchen floor tiles and wall tiles (At kitchen)

04

To hack kitchen sink support (At kitchen)

05

To hack the toilet wall entry (At common toilet)

06

To hack the skirting (**** hall)

07

To hack the false wall and door frame (At room 2)

08

To hack the false wall for door frame (At master toilet)

09

To hack the floor tiles (At balcony)

10

To hack the wall at kitchen entry (At kitchen)

11

Dismantle & disposal the existing wardrobe and kitchen cabinet

12

Dismantle and disposal cornice

13

Dismantle & disposal the wardrobe (At master bedroom) Lump-Sum

$4500

Subtotal

$4500

 

Share this post


Link to post
Share on other sites
Looking for good contractors? Click here for your request

B

Wet Works

01

To supply & lay floor tiles at master toilet

$650

02

To supply & lay wall tiles at master toilet 291sqtf

$2328

03

To supply & lay 3-in-1 waterproofing at master toilet and common toilet

$500

04

To supply & lay floor tiles at common toilet

$650

05

To supply & lay wall tiles at common toilet 302sqft

$2416

06

To supply & lay floor tiles at kitchen 190sqft

$1520

07

To supply & lay waterproofing at kitchen

$150

08

To supply & lay wall tiles at kitchen 531sqft

$4248

09

To supply & lay vinly flooring **** hall, master bedroom, room 2 & 3

$6493

999sqft

10

Construct cement base for kitchen cabinet (L25ft-D20”) (At kitchen)

$625

11

Construct washing base and fridge base with tiles finished (At kitchen)

$300

12

Touch up the wall, door frame wall and kitchen entry

$300

Page 1 of 3

13

Construct hollow wall to seal up the door entry at master bedroom

$500

14

Construct hollow wall to seal up the door entry at common toilet,

$800

Master toilet and master toilet

Subtotal

$21480

 

Share this post


Link to post
Share on other sites

C

Plumbing Works

01

Supply & replace the whole house stainless steel cold & hot pipe

02

Supply labour to install toilet bowl for 2 toilet

03

Supply labour to install basin and tap for 2 toilet

04

Supply labour to install shower tap for 2 toilet

05

Supply labour to install accessories for 2 toilet

06

Supply labour to install storage heater 1nos

07

Supply labour to install kitchen sink and tap Lump-Sum

$1600

Subtotal

$1600

 

Share this post


Link to post
Share on other sites

D

Electrical Works

01

Supply & install light point 14nosx$50

$700

02

Supply & install double power point 11nosX$80

$880

03

Supply & install single power point 5nosX$70

$350

04

Supply & install water heater point 2nosx$100

$200

05

Supply labour to install light 14nosX$10

$140

06

Supply & install 20A isolator point 1nos

$150

07

Supply & install SCV point 4nosX$100

$400

08

Supply & install tel point 4nosX$60

$240

09

Supply & install D.B box (12/18) way

$350

10

Supply & install hood point 1nos

$65

11

Supply & install oven point 1nos

$100

12 Supply & install 2 way switch 2nosx80 $160

Subtotal $3735

E Door Works

  1. 01 Supply & install tempered shower screen glass door (At common toilet) $500

  2. 02 Supply & install tempered shower screen glass door (At master toilet) $500

  3. 03 Supply & install PD door 2nosX$480 (At mater toilet & common toilet) $960

  4. 04 Supply & install tempered sliding glass door (L36”-H96”) (AT study room) $850

    Supply & install fix tempered glass with frosted (L6.5ft-H8ft) (At study room) $1300

  5. 05 Supply & install tempered sliding glass (At kitchen entry ) $850 Subtotal $4960

 

Share this post


Link to post
Share on other sites

F Partition Works

01 Supply & install L-shape divider partition (L14ft-H8.5ft) (At study room) $700

  1. 02 Supply & install ceiling L-box (L64ft-W16”) (**** hall)

  2. 03 Supply & install ceiling L-box (L45ft-W16”) (At dining hall)

  3. 04 Supply & install divider partition (L5ft-H102”) (At master bedroom)

G Other

  1. 01 Paint whole house Nippon or ICI (5 colour)

  2. 02 Cardboard protection and chemical wash for whole house

                $576                $405                $350

Subtotal $2031

$1700 $450

03

Haulage ,debris fee

$450

Edited by ILJ
 

Share this post


Link to post
Share on other sites

wow i find it expensive. Neverthe less, me and my wife are newbies here and am not updated to know the current market quotation or prices. Pardon us. However we have engaged a contractor to do up our new BTO home. They are from Meraki Renovation. - Victor Lim 97656674

You may want to call him up to enquire and get direct cheap deals with this guy and maybe say u were recommended by us to get better deals i hope.. lol.. nevertheless we are very happy with his work.
Cheers on your new home. :)
Hi Haris.
Thank you for your input.
I compare your quotation and mine and i find yours is on the high side still.
This reno company that you recomend have no website or any media online to see the works they completed. thus its a big risk.
 

Share this post


Link to post
Share on other sites

to me, i felt that hacking is quite reasonable. cos TS mentioned that there is balcony. so i ASSUME that this flat is a 5 room flat. and since it has hacked everything, again i ASSUME that this flat is those type of 5 room old type which have a bigger floor area than the new BTO 5 room flat. further more, it is to remove everything from the interior part, thus looks ok. some more find contractors willing to do it at +/- $200 but 4.5k should be indicative using my asumption.

only thing i feel its price is high is the tiling works. too high to be exact. the rest, is more or less there liao...

 

Share this post


Link to post
Share on other sites

to me, i felt that hacking is quite reasonable. cos TS mentioned that there is balcony. so i ASSUME that this flat is a 5 room flat. and since it has hacked everything, again i ASSUME that this flat is those type of 5 room old type which have a bigger floor area than the new BTO 5 room flat. further more, it is to remove everything from the interior part, thus looks ok. some more find contractors willing to do it at +/- $200 but 4.5k should be indicative using my asumption.

only thing i feel its price is high is the tiling works. too high to be exact. the rest, is more or less there liao...

HI Kangeroo,

Yes. its 5 room flat. 126sqm with balcony.

Hacking at $200 ? any recomendations?

Tiling works im checking, its according to 4psf tiles base on floor are..

My contractor is quite friendly. he will be able to adjust all my concerns.

thanks

 

Share this post


Link to post
Share on other sites

wow to hack off the said flooring n tiles costs 4500? wow seriously

ur electrical too expensive

Thanks i do agree electrical works is on high side. cause is sub-con i guess.

searching for one.

 

Share this post


Link to post
Share on other sites

Hi IJL,

Sorry to misled u. Actually is i meant this : $4500 +/- $200. Means some many do at $4300, some may do at $4700.

Second point. Even if its based on $4psf, its still very very high..seriously..

 

Share this post


Link to post
Share on other sites

Hi IJL,

Sorry to misled u. Actually is i meant this : $4500 +/- $200. Means some many do at $4300, some may do at $4700.

Second point. Even if its based on $4psf, its still very very high..seriously..

Hi kangeroo,

May i know which item u refering to above ? and whats a decent rate to counter propose please. thanks

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  


×