OceanEleven 203 Report post Posted June 24, 2015 Ohhh! Looking good. Love the interior colored laminate.Great that you had choosed to use this. Share this post Link to post Share on other sites
HansamuQ 5 Report post Posted June 25, 2015 Ohhh! Looking good. Love the interior colored laminate.Great that you had choosed to use this. Hi Ocean, thanks for visiting. Yeah am glad that I actually top up for internal color pvc. It's definely worth it.See that you are also a taobao fans. Lol.. Share this post Link to post Share on other sites
HansamuQ 5 Report post Posted July 1, 2015 Was away for few days, and saw that about 95 percent of my capentry was up, doors and glass shower screen all up. Now pending with table top, platform and painting touch up then all is good to go.Bedroom 2 completed. Master bedroom except for TV mounting. Toilet glass door up, left with plumbing and table topAm happy with the door lock from Taobao. Living TV console Living area. Left with study bi fold door and kitchen windows.My kitchen without the table top. Share this post Link to post Share on other sites
tarzanboy 6 Report post Posted July 2, 2015 Hi hansa may I ask you is your id charge GST and hdb register and please share me the contact for reference thank. Share this post Link to post Share on other sites
HansamuQ 5 Report post Posted July 5, 2015 Hi hansa may I ask you is your id charge GST and hdb register and please share me the contact for reference thank.No GST, and details PMed Share this post Link to post Share on other sites
HansamuQ 5 Report post Posted July 5, 2015 Progress has been going on smoothly now.. Had install the platform and table top. Wednesday another round of acid cleaning and can start checking for defects. Platform for cosy area and MBRTable top for kitchen and toilets Share this post Link to post Share on other sites
HansamuQ 5 Report post Posted July 5, 2015 Mirror and glass backing and fan installation has been installed too. Fan I'm getting Fanco airtrack 56" and Fanco FF9 48" for living room and all bedrooms respectively. Fan contact is from renotalk Eric bro. Good service and cheap!Mirror and glass backing. Living room fanBedrooms fan Share this post Link to post Share on other sites
tarzanboy 6 Report post Posted July 5, 2015 Hi, may i know how much is your id quote you materroom tv panel,2 toilets with glass door quote as now i am looking for contactor or id for my resale 4 room flat thank Share this post Link to post Share on other sites
Freb 10 Report post Posted July 5, 2015 Nice design & progress! Share this post Link to post Share on other sites
puglet 0 Report post Posted July 12, 2015 Hi HansamuQ,Can you share your ID's contact and reno quite please ?Thanks Share this post Link to post Share on other sites
Parbuaytoh 0 Report post Posted July 20, 2015 Hi HansamuQ,Tried PM-ing you but your inbox is full.Could you kindly share the breakdown of the reno, as well as the contact to your ID?Thanks in advance! Share this post Link to post Share on other sites
ahzai66 0 Report post Posted July 20, 2015 Hi! Can share the contact of your ID? Share this post Link to post Share on other sites
forkel 0 Report post Posted July 28, 2015 Any feedback for the ceiling fan?Been eyeing fanco fan,Bt scare it spoilt easily. Share this post Link to post Share on other sites
doubleEM 4 Report post Posted July 28, 2015 Progress looking good. Share this post Link to post Share on other sites
Titan501 0 Report post Posted July 28, 2015 Aircon piping more or less done for now. Except for some rework required at the kitchen and dining beam as i plan to install glass windows. But the aircon installer (Ah di) are good. He do not mind coming down a couple of times. Had spoken with other aircon guys before, some ask them to come twice already not easy. But Ah di, seems easy going. Willing to come down to do the re piping first. But not yet done la, need to check with ID where should they move the pipe to. Quite happy to have engaged him, talk to him, most of the things he also ok. All thanks to renotalk!This is the place where need to rework, the pipe should be outside the dining area, cause my ID will do box up.You can see that my piping is running on the outside, and the pipe are not covered with PVC trunking. Because i upgraded the pipe and insulation, so if put PVC trunking, it will be very thick and box up will not be that nice. So decided to do box up only, and to make it not that thick, they install the gas pipe on top while the water pipe below.View from my Master bedroom. Will box up for my masterbed room too.Now the whole house is in a mess. Lol. Wires everywhere, sand everywhere. Electrical and LAN wires are concealed on the floor before laying tilesHi gd morning, may I have the contact no. of Ah Di & ID? Any issues to install 2 a/c system?(mine also 5 room bto)Thanks Share this post Link to post Share on other sites