butterscotch 0 Report post Posted December 4, 2014 (edited) Continuation of Shopping !We bought the following furniture too!Star LivingStriell Dining TableJotterGood 2.5 Cabin SofaDining ChairsRed Apple Furniture (Do not buy from them, we will explain in future thread.. )TV Console (Chosen white laminate with some light wood laminate)Divider (Chosen some light wood laminate)- Didnt have the picture online and didnt take through phone tooWill share also the things we bought from Taobao too! Edited December 4, 2014 by butterscotch Share this post Link to post Share on other sites
ElvisP 0 Report post Posted December 4, 2014 Ready to move in? Must b very eager right? Share this post Link to post Share on other sites
butterscotch 0 Report post Posted December 5, 2014 Ready to move in? Must b very eager right? Should be able to move in before 2015 ... Share this post Link to post Share on other sites
butterscotch 0 Report post Posted December 5, 2014 (edited) After the floor tiling has been completed, they have asked us to arrange for 1st appointment for the air con fixture.During the fixture, to our horror, the air con piping has to run across our MBR toilet (The wall which I did the tiling at one side of the wall.) We tried to ask if there are any other alternatives but there aren’t. The air con guys told me that they have encountered this before in other BTO flats and there aren’t much choices to run the piping. We quickly called for help. As he was nearby, he came over to check out the issue.After discussion and checking other units how they fixed up the air con, Nic told us that it has to run through the MBR toilet and he will boxed up the air con piping in MBR toilet and piping above MBR door frame.This are the photos after the air-con fixture.BeforeAfterIt took about 6 hours for the air con guys to fix up the piping ... Edited March 26, 2015 by butterscotch Share this post Link to post Share on other sites
butterscotch 0 Report post Posted December 8, 2014 Here are some of the items we bought from Taobao (Part 1):Kitchen BasinToilet TapsToilet Roll HolderToilet RackClothes Hanger Share this post Link to post Share on other sites
butterscotch 0 Report post Posted December 8, 2014 Taobao (Part 2)Water SprayCommon Toilet Vanity (Stainless Steel)MBR Rain ShowerBook Shelves Share this post Link to post Share on other sites
butterscotch 0 Report post Posted December 8, 2014 Taobao (Last Part) ...Clock (Double Sided)Dining LightsDoor Peep HoleKeys HolderStoreroom & MBR Corridor Light Share this post Link to post Share on other sites
butterscotch 0 Report post Posted December 9, 2014 (edited) After the air con fixture, we will need to choose the laminates and paint colour. They pass us 3 brochures to choose the wall paint colours and the cabinet’s laminates. He asked us to choose and we will meet up in a week time to discuss gain. We were overwhelmed by the selection of the laminates. As we are going for Scandi style, we have decided on light wood colour and white laminates. The following is what we have chosen:He informed us that the 3D layout will be ready in approximately a week time while they proceed to do the painting of the walls...These are the colours in which we have chosen for our walls:Living Room & Passageway - WhiteMBR and Bedroom 2 - Whisper Grey & Creamy WhiteBedroom 3 - Cucumber & Apple WhiteService Yard - Bluebell White Edited March 26, 2015 by butterscotch Share this post Link to post Share on other sites
butterscotch 0 Report post Posted December 10, 2014 (edited) Before the start of the carpentry works, these are the 3D designs !Nic proposed to us to do something out of the norm as the full brick wall is very common. He proposed to do unregular half brick wall with painted white wood in the middle. Cant really see from the 3D drawing... but this is the preview of our unfinished wall...Our Kitchen 3D Layout ! Edited March 26, 2015 by butterscotch Share this post Link to post Share on other sites
hazelline 6 Report post Posted December 10, 2014 Wow...the 3D design very nice...ohh and hope to hear your review on red apple soon...what happen to them?? Share this post Link to post Share on other sites
butterscotch 0 Report post Posted December 11, 2014 Wow...the 3D design very nice...ohh and hope to hear your review on red apple soon...what happen to them??Hi,Will provide an update soon for the red apple review... thanks for the compliments too ! Share this post Link to post Share on other sites
butterscotch 0 Report post Posted December 11, 2014 (edited) Morning everyone!During the installation of the air-con piping, we met the carpenter. We saw him with pen and papers and he started drawing the layout. He is meticulous as he take note of very fine details like the position of the power point etc .For the next entire week, the electrician and painter came and do the fix-up of the electrical points and the false ceiling. When we visit our house again on the following weekend, we saw this !Excited to see the outcome of our cabinets Edited December 15, 2014 by butterscotch Share this post Link to post Share on other sites
ElvisP 0 Report post Posted December 11, 2014 hi butterscotch,please post more pics! the 3d design really looks cool Share this post Link to post Share on other sites
intonewlife 2 Report post Posted December 11, 2014 Can I have e url for book shelves from taobao? Share this post Link to post Share on other sites
butterscotch 0 Report post Posted December 12, 2014 hi butterscotch,please post more pics! the 3d design really looks cool Will post more photos!Can I have e url for book shelves from taobao?Hi, the url is as follow:http://item.taobao.com/item.htm?id=39006073383&spm=2014.12193480.0.0 Share this post Link to post Share on other sites