Takaishi 44 Report post Posted December 1, 2014 Hacking/Works by TilerSo far so good, the curbs are up in no time and the hacking of wall is down in a day, still waiting for it to be made good.The electrical point discussion was pretty tedious and i was quite taken aback how much work is needed.Originally wanted additional ports for living room. End up deciding to retain the TV area's power points and simply use an extension cord which will be hidden within the TV console, 2 extension cords to be exact Since that area is just a small area, some plants/lights/decoration could just block the wires away from sight.Now i finally understand why its difficult to plot the power point relocation especially if you buy furniture yourself, its almost impossible to plot it as accurately compared to built in furniture. If you do built in, eveyrthing will be aligned sui sui one. If you purchase off the shelf, when you eventually shift the furniture around, it'll deviate from your initial plan... Share this post Link to post Share on other sites
bianzi 52 Report post Posted December 1, 2014 Hi just quote your nick takaishi I can help pm himI did 2 blinds and 2 curtains day and night and 1 roller blind for kitchen . I don't know the break down but my amts to $2k plus. U can just get him to quote to compare ba. Really depends on the size of your window Thanks Bianzi. Any name or smth so that he knows u recommended me? How much was yours? Share this post Link to post Share on other sites
Takaishi 44 Report post Posted December 1, 2014 Hi just quote your nick takaishi I can help pm himI did 2 blinds and 2 curtains day and night and 1 roller blind for kitchen . I don't know the break down but my amts to $2k plus. U can just get him to quote to compare ba. Really depends on the size of your windowi text him already lol. u can tell him i just text him for quote on roller blinds or the usual venetian blinds. lol.mine is the premium one and i am sibeiiii siannnn Share this post Link to post Share on other sites
Takaishi 44 Report post Posted December 2, 2014 And so the wall came tumbling down!~~~~Tomorrow electrical!Ikea purchasesOn top of those items we bought at Ikea HK, back in SG we continue to hoot whenever we have time.GÖMMAREN Shower rod ($19.90)Asker / FINTORP rail ($11.90)FINTORP hook 7cm (2 piece in one packet $4.90)FINTORP rail ($13.90)FINTORY cutlery stand x 2 $8.90x2FINTORP hook 11cm (5 piece - $4.90)Socker green house ($24.90)FEJKA flowers x 3 pink ($2.90x3)PAPAJA x 3 ($1.90)FJÄDRAR cushion x 4 - $9.90 x 2Things are looking up! Share this post Link to post Share on other sites
coyote 6 Report post Posted December 3, 2014 PrintsRug - might not fit the theme, see how...Hi, may I have the link to where you got your toilet paper (worst job) decal? Thanks. Share this post Link to post Share on other sites
Takaishi 44 Report post Posted December 3, 2014 (edited) Hey coyote, its not a decal, its a print. from society6 ! Edited December 3, 2014 by Takaishi Share this post Link to post Share on other sites
coyote 6 Report post Posted December 3, 2014 Oic Takaishi. Thanks.I am looking for decal Share this post Link to post Share on other sites
Takaishi 44 Report post Posted December 3, 2014 Oic Takaishi. Thanks.I am looking for decal Me too! Seemed really difficult to find Share this post Link to post Share on other sites
coyote 6 Report post Posted December 3, 2014 Indeed, googled for quite awhile also couldn't get a satisfied match. Share this post Link to post Share on other sites
Takaishi 44 Report post Posted December 10, 2014 3D is out but I've resent it back for editing. For this ID, they only do 3D on carpentary and not including toilet ones. I've feedback this to them and thought it should be included. All in all, i'm pretty sure the end product will be way better than its supposed to be. Our design focus on pastels, and most of the pastel stuff don't come from carpentary. Wall painted with pastel colors are also not reflected in 3D.ELECTRICAL IS DONE!All the shifting, relocating, new points. Finally, headache gone... I thought that was the most troublesome part of the renovation!Boxing-upBoxup of top area to accomodate aircon piping after area was hacked off.Boxing up of door area into MBRFlushing of wall in MBRDivider in living room (Gonna be a superb and subtle piece!) Share this post Link to post Share on other sites
Takaishi 44 Report post Posted December 10, 2014 Our prints are framed and ready! Collected all of them. So far this shop has the lowest quote for framing them. Frameandglass in balestier. Quite alot of peeps look for them one. 1 Share this post Link to post Share on other sites
bianzi 52 Report post Posted December 10, 2014 I like the toilet paperprint:) 1 Share this post Link to post Share on other sites
Yelena 8 Report post Posted December 10, 2014 wow i must say i absolutely LOVE all of your purchases!! they are so quirky and fun! 1 Share this post Link to post Share on other sites
Takaishi 44 Report post Posted December 11, 2014 Thanks all! Cant wait for the carpentry and installation of appliances and lightings to arrive from taobao and installed!Next week first coat of painting. Share this post Link to post Share on other sites
DarkFly3r 1 Report post Posted December 14, 2014 Very nice design you have. I am also having Scandinavian theme for my upcoming house and looking forward to your updates! 1 Share this post Link to post Share on other sites