udtdvr 0 Report post Posted September 10, 2014 (edited) Hi forumersGetting my keys on 22nd this month.Already engaged one contractor to settle those priority things that have to do first due to limited time frame(1 month max) for me to do the renovation before moving in.Below are the quotation after negotiation.Hack and Redo whole MBR toilet..supply and install WC..Basin and accessories-$4000overlay common toilet floor only..supply and install WC. .basin and accessories-$1000a)Hack and redo kitchen flooring.b) Dismantle kitchen cabinet demolish concrete basin and cooking area and one bedroom wardrobe.c)Create Base for kitchen cabinet..fridge..washing machine.d)built half wall to divide washing machine and cabinet.e)Hack off wall between hall and kitchen to make it open concept.f)chip wall tiles at partial living hall's wall and make good.above items (a to f) -$5800Total $10800. Edited September 10, 2014 by udtdvr Share this post Link to post Share on other sites
udtdvr 0 Report post Posted September 14, 2014 (edited) will be start the reno on 23rd so one more week to count down..hope everything goes smoothly. Edited September 14, 2014 by udtdvr Share this post Link to post Share on other sites
tarzanboy 6 Report post Posted September 15, 2014 Hi may I know why you hack everything in master toilet and only overlay the common toilet thank. Share this post Link to post Share on other sites
udtdvr 0 Report post Posted September 27, 2014 (edited) ">http://Wall tiles in living hall to be chip off. Edited September 27, 2014 by udtdvr Share this post Link to post Share on other sites
udtdvr 0 Report post Posted September 27, 2014 cant continue upload rest of the pics...why?? Share this post Link to post Share on other sites
udtdvr 0 Report post Posted September 28, 2014 (edited) still trying.. Edited September 28, 2014 by udtdvr Share this post Link to post Share on other sites
Troublemaker 31 Report post Posted September 28, 2014 Nice! Your house is big!Sorry that i can't help you regarding uploading of the photos as i did not use photobucket. Share this post Link to post Share on other sites
udtdvr 0 Report post Posted September 28, 2014 Nice! Your house is big!Sorry that i can't help you regarding uploading of the photos as i did not use photobucket.No la juat 104 m2 ..the two common room and hall is quite big but MBR is smaller compare to my previous 4A flat 100m2. Share this post Link to post Share on other sites
udtdvr 0 Report post Posted September 28, 2014 ">http://http://s1095.photobucket.com/user/7udtdvr/media/255/20140924_120111.jpg.html'>after chip off the tiles Share this post Link to post Share on other sites
udtdvr 0 Report post Posted September 28, 2014 ">http://http://s1095.photobucket.com/user/7udtdvr/media/255/20140922_191911.jpg.html'>this whole piece of internal wall still waiting for hdb's approval to hack off..two weeks already sigh... Share this post Link to post Share on other sites
udtdvr 0 Report post Posted September 28, 2014 ">http://http://Kitchen before and after hacking Share this post Link to post Share on other sites
udtdvr 0 Report post Posted September 28, 2014 MBR Toilet ">http://http://http:// Share this post Link to post Share on other sites
udtdvr 0 Report post Posted September 28, 2014 ">http://http://s1095.photobucket.com/user/7udtdvr/media/255/20140927_173129.jpg.html'>Works resume on monday.. Share this post Link to post Share on other sites
my1234 2 Report post Posted September 28, 2014 I need a contractor, can you please pm me your's contractor company. Thank you Share this post Link to post Share on other sites
udtdvr 0 Report post Posted October 3, 2014 ">http://http://s1095.photobucket.com/user/7udtdvr/media/255/20141002_122146.jpg.html'> Share this post Link to post Share on other sites