Jump to content
Find Professionals    Deals    Get Quotations   Portfolios
Sign in to follow this  
movie247

Our.grey.grey.loft

Recommended Posts

Hi All,

Having greatly benefited from reading from all your blogs, have decided to share our renovation experience as well.

Collected our keys in end May'2014, and renovation started since 23Jun after spending 2 weeks with BSC for the rectification works.

Here's our floor-plan to our 5RM BTO unit.

gallery_56173_3_20201.jpg
Like most couples, we did our fair share of IDs hunting 6 months prior to key collection. Our inspiration comes from the below color-scheme.

gallery_56173_482_15416.jpg

 
  • Like 1

Share this post


Link to post
Share on other sites

Join 46,923 satisfied homeowners who used renotalk quotation service to find interior designers. Get an estimated quotation

1st entry to our new home.

Living room view

gallery_56173_482_30091.jpg

Full living room wall which we planned to cover with craftbrick

gallery_56173_482_4812.jpg

The study area in the living room

gallery_56173_482_19280.jpg

Entrance to kitchen from living, db-box beside maindoor

gallery_56173_482_29838.jpg

Kitchen view from entrance

gallery_56173_482_10078.jpg

Kitchen view from service yard

gallery_56173_482_16442.jpg

 

Share this post


Link to post
Share on other sites

Week 1 - 28Jun visit

Tiles ordered from Hafary are here. Hacking is completed.

Wall between kitchen & living removed after permit w/o PE is approved

gallery_56173_482_16739.jpg

Service yard prep for half-height tiling works

gallery_56173_482_34197.jpg

Craftbrick order for living room

gallery_56173_482_23630.jpg

Carpet-lookalike tilies for bedrooms

gallery_56173_482_24323.jpg

Service yard - wooden washboard lookalike tiles for service yard

gallery_56173_482_22056.jpg

Edited by movie247
 

Share this post


Link to post
Share on other sites

Week 2 - 05 Jul

Preliminary electrical works, aircon trunking and tiling completed

Hacked wall made smooth, the original wall tiles grinded, kitchen cabinet base of 200mm completed

gallery_56173_482_10218.jpg

Washboard wall tiles done in service yard

gallery_56173_482_23403.jpg

Bedroom tiles done

gallery_56173_482_31319.jpg

Love the transition from passageway to bedrooms - grey concrete to grey carpet

gallery_56173_482_930.jpg

Finally, our brickwall is up. The void spaces are for the tv bracket and console to wall-mount

gallery_56173_482_20486.jpg

Edited by movie247
 

Share this post


Link to post
Share on other sites

Week 5 - 26 Jul

1st round of painting, fans and aircon installation, service yard windows, and gas pipe extension are completed.

M.Bedroom Crestar Rainlite - ice-cream stick blades

gallery_56173_482_2290.jpg

Bedroom 2 & 3 Crestar Rainlite in white with LED light unit

gallery_56173_482_8667.jpg

Living room Crestar Skylite in gunmetal black

gallery_56173_482_17858.jpg

Decided not to go for system 4 due to long-term maintenance consideration, so here's our 3+1 split aircon from Daikin.

Living Daikin single split unit

gallery_56173_482_9965.jpg

M.Bedroom - daikin system 3

gallery_56173_482_28020.jpg

 

Share this post


Link to post
Share on other sites

Week 5 - 26 Jul - Continued

Bedroom 2 & 4 - system 3

gallery_56173_482_22546.jpg

gallery_56173_482_14808.jpg

Gas pipe extended to stove position

gallery_56173_482_10249.jpg

gallery_56173_482_20516.jpg

gallery_56173_482_17260.jpg

Edited by movie247
 

Share this post


Link to post
Share on other sites

Week 6 - 02 Aug

Light fittings and carpentry installation in progress.

Foyer - shoe & display cabinet

gallery_56173_482_20133.jpg

Living track light & dining pendants

gallery_56173_482_4231.jpg

living tracks with fan

gallery_56173_482_8493.jpg

Left side of living area - hidden study table & shelving within a cabinet

gallery_56173_482_30171.jpg

Storage unit outside of kitchen

gallery_56173_482_15982.jpg

 

Share this post


Link to post
Share on other sites

Week 6 - 02 Aug - Continued

Kitchen cabinets are installed. View from foyer. That hole on the right is reserve for coffee machine

gallery_56173_482_48282.jpg

Hidden dresser in M.Bedroom

gallery_56173_482_45673.jpg

 
  • Like 1

Share this post


Link to post
Share on other sites

Errr... how is this a loft?

Hi binka, just like the sound of the title.

No clear theme to begin with, we're just putting the looks we like in different areas of our home. Our main consideration was that it must be easy to clean which explains the amount of cabinets we have to reduce dust collection (aka exposed horizontal surfaces) & hide away clutter when needed :D

 

Share this post


Link to post
Share on other sites

Hi movie247, nice colour scheme you got there! My wife dislikes dust as well. Haha..I love your ideas of hidden cabinet as well.

Are the cabinet doors single doors?or foldable 2 piece doors?

Are the black items lights in front of your storage unit outside of kitchen??

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×