smiley73 0 Report post Posted May 22, 2014 the 50k does not include the kitchen appliances, aircon, toilet kitchen accessories and lights.My 5rm Reno about 52K Share this post Link to post Share on other sites
bianzi 52 Report post Posted May 25, 2014 mine is a 4 room resale and i am not even replacing the room parquet and living room homogenous tiles... my quote is 50+ before electrical... sigh... Share this post Link to post Share on other sites
tampan 4 Report post Posted May 25, 2014 Hi joannYour 3d drawing is very nice.. can share to me your id contact? Share this post Link to post Share on other sites
J0ANN3 2 Report post Posted May 26, 2014 mine is a 4 room resale and i am not even replacing the room parquet and living room homogenous tiles... my quote is 50+ before electrical... sigh... Sign nowadays everything also expensive. You must have a lot carpentry? Share this post Link to post Share on other sites
J0ANN3 2 Report post Posted May 26, 2014 Hi joannYour 3d drawing is very nice.. can share to me your id contact?Have Pm'ed you Tampan. Share this post Link to post Share on other sites
J0ANN3 2 Report post Posted May 26, 2014 Many things cork up this week. It is a bad bad week! First, it was the Viewqwest. Signed up with them for Bundle 300. They confirmed with email for installation of opennet to be fixed on 19 May but no one came and it was not even in their system. So I rang them up and $^*#%^&@$^#$^&@. Hehe they gave me speed boost 3 months for their overlook in the matter. The new date for opennet installation is fixed on 29 May Thursday. Delayed my reno abit. Second was my aircon from Mega Discount Store. Arranged for Aircon on 20 May, and no one came. End up I call Mega and overheard that Mitsubishi overlooked. Okay but they arranged for Thursday 22 May. That was fast. Settled. Thirdly, Mega Discount Store again. Delivery was supposed to be on 16 May but claimed that EF agent computer system down so couldn't deliver on 16 May and changed to 19 May. But no one will be at site on that day cause all completed just pending for carpentry and lights. So, I changed to Saturday 24 May 3pm to 5pm where I will be around to receive the Hob. EF agent will deliver the Hob back to Mega store cause EF agent don't work on Saturdays. Purposely went there to wait at 2.30pm and wait wait wait. Guess what? No one came. It was so hot and no chairs to sit. I called Mega Discount Store at 5pm to check, they tell me the EF agent sent it to their store and not warehouse. So, wasted the whole of my afternoon! Angryyyy! End up delivery fixed today afternoon. I must get them to compensate me with something for their cork ups twice. Pending to replace Gate My Aircon trunking is concealed in the Master BR toilet Common BR aircon is up and running Master BR Aircon Living Rm 24VAMy ID says today is Carpentry day! Wonder if I should pop by in the evening... I'm so excited! The Completion date is near! Share this post Link to post Share on other sites
bianzi 52 Report post Posted May 26, 2014 My carpentry not a lot .. Shoe cabinet 1.6mKitchen cabinets top and bottom... Tv console Wardrobes 3.2m Toilet vanity x 2 That is it? I wanted more but can't afford Sign nowadays everything also expensive. You must have a lot carpentry? Share this post Link to post Share on other sites
J0ANN3 2 Report post Posted May 26, 2014 I just pop by and have a peek! Camera no flash >_< too dark to take photos. Feature wallProgress: 85%WardrobeProgress: 80%Study TableProgress : 95%Master Bedroom storage under windowProgress : 50%Master bedroom toilet vanityProgress : 0%Top & Bottom Kitchen cabinetsProgress : 35%Kitchen IslandProgress : 50% Share this post Link to post Share on other sites
Songz 132 Report post Posted May 27, 2014 Rem to check the internal of the carpentry which I heard usually they will not put silicon as it is not seenBy the way mind taking a pic of the feature wall when its convenient ? Share this post Link to post Share on other sites
J0ANN3 2 Report post Posted May 27, 2014 (edited) Progress of 2nd day carpentryKitchen top and bottom / with Island + top hung tempered glass kitchen sliding door trackTv feature wallThe wood on the left below I forget is to install the mirror or laminate. LoL!Master bedroom storage, pending laminates.Wardrobe almost completedStudy Table, pending the installation of drawers Edited May 27, 2014 by J0ANN3 1 Share this post Link to post Share on other sites
Songz 132 Report post Posted May 28, 2014 Good progress on the reno. Starting of carpentry is the most need to check but also another milestone journey . Share this post Link to post Share on other sites
J0ANN3 2 Report post Posted May 28, 2014 Rem to check the internal of the carpentry which I heard usually they will not put silicon as it is not seenBy the way mind taking a pic of the feature wall when its convenient ?silicon? Put where which part of internal? Im a total newbie in all these stuff. Share this post Link to post Share on other sites
Songz 132 Report post Posted May 28, 2014 silicon? Put where which part of internal? Im a total newbie in all these stuff.Example those back piece joint part, flooring and carpentry joint part, and etc. Share this post Link to post Share on other sites
J0ANN3 2 Report post Posted May 31, 2014 Updates - Mirrors & Glass doors up - Countdown to 12 June Share this post Link to post Share on other sites
tampan 4 Report post Posted June 26, 2014 hi Joanne,any new updates? how is the end result? Share this post Link to post Share on other sites