Jump to content
Find Professionals    Deals    Get Quotations   Portfolios
Sign in to follow this  
chilarvet

New 5Rm Premium Bto Flat Quotation

Recommended Posts

Hi evryone,

I just got a quotation from an interior designer and the total package quoted to me was $20,466.49. This exculdes the electrical works.

Is the quote ok? Got a few other quotations that are like $35k, $26k and this was the cheapest. They are a small company and not so renowned, but the ID was efficent in sending me my amended quotes. Going to meet her this sunday and will update everyone here.

Water Terrace II 5rm BTO Premium Punggol Flat

1 Consultation & Design Proposal
2 Space Planning & 3D Computerized Perspective Drawing
3 Product & Material Proposal
4 On-Site Supervision & Project Management
5 Haulage of Materials, supply Cement & Sand ( By HDB Approved Contractor )
6 Transport to Clear & Disposed of Debris ( By HDB Approved Contractor )
MASONRY WORKS
1 Showet kerb for 2 toilets complete with tiles finished
2 To supply & construct kitchen cabinet base complete with matching HDB tiles
3 To supply & construct fridge base complete with matching HDB tiles.
4 To supply & construct washing machine base complete with matching HDB tiles.
PLUMBING WORKS
1 To supply & lay conceal drainage piping for kitchen sink.
2 Extension of copper piping for kitchen sink
3 To supply Material & labour to install 2 nos. of instant heater or 1 no. of storage heater
4 To supply Material & labour to install 2 set of bathroom accessories.
5 To supply Material & labour to install 2 nos. of mirror
6 To supply Material & labour to install kitchen sink & tap.
PAINTING WORKS
To supply & paint whole unit wall & ceiling with Nippon/ICI emulsion paint. Max 5 paints
CEILING WORKS
1 To supply & install Flase Ceiling at foyer & dining area
2 To supply & install Flase Ceiling at bedroom passage way
3 To supply & install L-Box **** area
CARPENTRY WORKS
1 To design & fabricate 24ft kitchen cabinet using solid plywood in laminated finish (14ft top & 10 ft bottom)
a.Postfoam kitchen worktop.
b.Designer handle.
c.2 tier stainless steel dish rack.
d.Cutlery tray.
e.Supply & install white solid top surface at kitchen's cabinet table top area with backsplash 10ft
2 Design & fabricate T.V Console **** 6 ft
3 Deisgn & fabricate feature wall for living room 6ft
4 Full height swing door wardrobe for master bedroom (L Shape or walk - in wardrobe)12 ft
5 Deisgn & fabricate full height glass display unit **** room 3 ft
6 Vanity cabinet top for masterbedroom and common toilet 2nos
MISCELLANEOUS WORKS
1 Chemical washing upon completion of work.
2 Laying of protection sheet upon completion of flooring works.
3 HDB permit Handling Fees
Additional Item
1 Tempered glass shower screen w/ door for master toilet ( wall to wall ) for master bedroom
2 Tempered glass shower screen w/ door for common toilet ( L-shape, sliding ) for common toilet
3 Install aluminium sliding grilles for service yard
4 Install windows for Service yard
5 To supply & install Brick Wall design wall at foyer/entrance to block the view of the living area
6 To construct and build a kitchen door entrance ( L-shape, with the wall facing the living room to be top half glass tempered screen and bottom half hollow wall)
Edited by chilarvet
 
  • Like 3

Share this post


Link to post
Share on other sites

Join 46,923 satisfied homeowners who used renotalk quotation service to find interior designers. Get an estimated quotation

Hi Chilavert,

Just curious, for your carpentary works, your are already quoted 10ft solid surface top, why do you still have a postform worktop? Double quote?

 

Share this post


Link to post
Share on other sites

Hi Chilavert,

Just curious, for your carpentary works, your are already quoted 10ft solid surface top, why do you still have a postform worktop? Double quote?

Hi CrimsonX,

Hmm.. Your right. I did not see that. Shall check with my ID this weekend and see what she says.

Thanks for bringing that up. :)

 

Share this post


Link to post
Share on other sites

Hi Chilarvet,

just curious, under plumbing, item 1 (supply & lay conceal piping for kitchen sink)

isn't your new BTO flat already concealed the plumbing piping ?

what the HDB permit handling fee for.

personally think that your quote is on the high side.

It's just my 2 cents

cheer

 

Share this post


Link to post
Share on other sites

Hi Chilarvet,

just curious, under plumbing, item 1 (supply & lay conceal piping for kitchen sink)

isn't your new BTO flat already concealed the plumbing piping ?

what the HDB permit handling fee for.

personally think that your quote is on the high side.

It's just my 2 cents

cheer

HDB will only run the water piping and drainage to a certain location. the plumber has got to extend the piping and drainage to wherever you decide to run your kitchen sink.

i din see a HDB permit handling fee. but most IDs will be willing to pay the $20+ out of their pockets if you sign the contract with them. And since its a new flat, no requirement for HDB permit anyways, unless doing hacking works.

but personally, i feel its unfair to judge people's quotation based on Length and square area alone.

Just like buying a car, both are Toyota Altis for eg, but maybe one is premium spec got bodykit, leather seats, DVD player thrown in. naturally premium more exp, but both also Altis mah.

Just ensure when you compare apple to apple pricing, make sure both are giving identical products.

Just sharing my tots to everyone who is doing their reno, dun be shortchanged on design if pricing dun differ too much. :notti:

 

Share this post


Link to post
Share on other sites

Hi Chilarvet,

I got mind @ $19,800/= include electrical.

Hi Joycetay,

Thats cheaper than mine without electrical. :(

Pm you for your quote if possible. hehe

 

Share this post


Link to post
Share on other sites

HDB will only run the water piping and drainage to a certain location. the plumber has got to extend the piping and drainage to wherever you decide to run your kitchen sink.

i din see a HDB permit handling fee. but most IDs will be willing to pay the $20+ out of their pockets if you sign the contract with them. And since its a new flat, no requirement for HDB permit anyways, unless doing hacking works.

but personally, i feel its unfair to judge people's quotation based on Length and square area alone.

Just like buying a car, both are Toyota Altis for eg, but maybe one is premium spec got bodykit, leather seats, DVD player thrown in. naturally premium more exp, but both also Altis mah.

Just ensure when you compare apple to apple pricing, make sure both are giving identical products.

Just sharing my tots to everyone who is doing their reno, dun be shortchanged on design if pricing dun differ too much. :notti:

I see.. yes mine does not invovle hacking so no need HDB permit fees and my sink might be further away from the original site too.

Thats true CrimsonX, I'm comparing specs with other IDs based on the same products quoted. But some other IDs quoted me like half of the above, and already reach $20k. :o

 

Share this post


Link to post
Share on other sites

Hi,

I got a quote around $23k+.

PROFESSIONAL SERVICES

1 Design consultation, furniture layout plan & material proposal

2 3D perspective drawing, project management plan

3 On site supervision & coordination

MASONRY WORKS

1 Supply/lay homogeneous tiles (600×600) mm with skirting for living/dining halls

2 Supply/construct kerb for main entrance

3 Supply/construct 50mm height kitchen washing machine with tile finish

4 Supply/lay laminated flooring with skirting for all bedrooms

5 Supply/construct 50mm height kitchen cabinet base with tile skirting finish

6 Supply/construct 50mm height kitchen fridge base with tile finish

PLUMBING WORKS

1 Supply labour to install new sink/ storage water heater/ toilet accessories and connection of inlet/ outlet piping

CEILING WORKS
1 To supply & install Flase Ceiling at foyer, living & dining area
2 To supply & install Flase Ceiling at bedroom passage way
3 To supply & install L-Box at 2 common room area
4 To supply & install False ceiling with pelmet at Master room

CARPENTRY WORKS

1 Kitchen: Design/Supply/Construct solid surface top c/w backsplash for kitchen cabinet (10fts)

2 Supply labour to install cooker hood, cooker hob and oven

3 Deisgn & fabricate & install suspended full height shoe cabinet

4 Deisgn & fabricate & install feature wall for living room 6ft

5 Deisgn & fabricate & install 2x vanity cabinet bottom with solid top for masterbedroom and common toilet

PAINTING WHOLE HOUSE AND GENERALS

1 Painting of whole house walls/ceilings with ICI pentalite or Nippon 5000

2 Floor protection (include disposal)

3 Debris removal services

4 Whole house acid washing and cleaning

ADDITONAL ITEMS
1 Tempered glass shower screen w/ door with stainless RE-INFORCED rod for master toilet
2 Tempered glass shower screen w/ door for common toilet ( L-shape, sliding ) for common toilet
3 Install aluminium sliding grilles for all whole house
4 Install sliding windows for Service yard
5 To construct and install a kitchen Glass sliding door entrance
Is the quote ok? I'm still thinking of hacking off the one common room wall to link up with master room. Gonna meet with this interior renovation company to finalize the detail again next week.
 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  


×