lookaround 24 Report post Posted August 23, 2014 Hi, May I get the contact for your quote 3? thanksHi, can pm me the contact for quote 3 ? thank you very much!PM sent, enjoy ur renovator search Share this post Link to post Share on other sites
hellomello963 0 Report post Posted August 23, 2014 PM sent, enjoy ur renovator searchHi, Can PM me the quote 3 Share this post Link to post Share on other sites
Prince7 0 Report post Posted August 24, 2014 Hi Turnaround, Please kindly PM me your quote 3 contacts. Share this post Link to post Share on other sites
doggylover 0 Report post Posted August 24, 2014 In the end, i settle for Quote 3 from a ID.Wet Works1 To supply labor and material to construct 2 nos cabinet bases $290.002 To supply labor and materials to construct fridge bases $90.003 To supply labor and materials to construct washing machines bases $130.004 To supply labor and materials to construct shower kerb $70.00Total Wet Work Cost $580Plumbing works1 To supply labor and materials to extend stainless steel piping @ existing HDB copper piping point for new kitchen sink position $1802 To supply and lay conseal PVC piping for drainage area @ kitchen sink $903 To supply and lay conseal PVC piping for drainage area @ washing machine $1104 To supply labour only to install storage heater c/w storage heater stainless steel piping extension for hot & cold $1405 To supply labor only to install toilet/whole house accessories FOC6 To supply labor only to install & connect new kitchen sink & tap FOC7 To supply labor only to install 2nos mini-spray sets FOCTotal Plumbing works $520Ceiling/Parition works1 To supply labor and materials to construct full height 2 sided partition wall c/w wood base board @ foyer area $430Total Ceiling/Parition works 430Glass works1 To supply labor and materials to install full height plain edge clear mirror @ foyer area partition wall $4502 To supply labor and materials to install designer series full height plain edge strip effect clear mirror @ foyer area partition wall 5303 To supply labor and materials to install 2 D casement glass door between kitchen partition $5804 To supply labor and install 1 set tempered glass shower screen @ master bathroom [1pcs fixed , 1casement[ $530Total Glass works :2090Aluminium Windows works1 To supply and install HDB approve standards grade aluminium sliding window grill @ service yard, living/dining & 3 bedrooms/[max height 4 ft][bronze/Silver] $9802 To supply labor and material to install 1 set powder coated sliding aluminium window @ service yard c/w HDB approved coloured glass. $680Total Aluminium works $1660Electrical works1 To supply labor only to install internal light fixtures @ HDB standard ceiling light points(13 lighting points,lighting provided by owner) FOCTotal Electrical works $0Carpentery worksFoyer Area1 To fabricate and install full height shoes cabinets c/w casement door, ABS trimming, soft close mechanim hingers and designers handler in laminate finish[est 3ft] $650Living Room2 To fabricate and install low height storage cabinets daybeds c/w PVC cushion, casement sling door, ABS trimming, slow close mechanism hindges & designer handles in laminate finishes [est 10.5ft] $1470Master Bathroom area3 To fabricate and install suspended storage cabinets c/w 1 sliding mirror door, top and bottom coverlight , internal shelving, ABS trimming and designer handles in PVC finishes [est 5 ft] $690Kitchen Area4 To fabricate and install top tread removable pelmet box up in laminate finish @ both side 7005 To fabricate and install top & bottom kitchen cabinet c/w ABS trimming, slow close mechanicsm hindges, 2 set of drawers and designer handles in laminate finish[est 20 ft] $20006 To supply and install 1 no frosted glass for kitchen cabinet FOC7 To supply and install 1 nos 2-tier stainless stell dish rack FOC8 To supply labor only to install cooker hob and hood FOC9 To supply and install1 no PVC cutlery tray10 To supply and install polyester base heavy duty solid surface worktop c/w front profile & backsplash [est 17ft][Test and appoved by PSB] 1150*All carpentry works are all using solid 3 plywood c/w high pressure laminate finish, use only local laminate materials, material quality assuredTotal carpentry costs=6660Misc works1 To supply labor and materials to pain whole unit using Original Nippon/ICI paint [4+1 colors] include Matex paint for ceiling (min two coats), painting of all PVC/stainless steel pipes, all doors, door frame c/w glossy paint if needed, main gaite c/w glossy paint if needed $10602 To supply labor and materials to acid wash for entire unit FOC3 To supply labor and materials to do general cleanin for entire unit FOC4 To supply labor and materials to lay corrugated paper for whole house by HDB haulage FOC5 HDB parking of skip tank at loading and unloading fees FOC6 HDB Permit and handling fees FOC7 Haulage and debris removal fees [include upload of sand] As charged as per receiptTotal misc work :$1060 + ?Total renovation cost = $13000** does not include haulage and debris removal fee and additional electical routing.Hi, can you pm me the ID and renovation company details please? i am sourcing for quotations for comparison too.. thanks! Share this post Link to post Share on other sites
Lutheran 0 Report post Posted August 29, 2014 Can someone pls pm me the quote 3 ID? Thank you. Share this post Link to post Share on other sites
alexng 0 Report post Posted August 29, 2014 look for contractor, can someone pls pm me thank you Share this post Link to post Share on other sites
davidlim563 0 Report post Posted August 29, 2014 pls pm me too Share this post Link to post Share on other sites
Jungor Tan 0 Report post Posted August 31, 2014 Hi Lookaround, Could help to PM me your ID contact to me as well ? Thank you..My Email ID : jungor@gmail.com. Share this post Link to post Share on other sites
Pearlyn Chuah 1 Report post Posted September 1, 2014 (edited) Hi lookaround. Could you email me your #3 id contact details at pearlyn_8@hotmail.com pls?Thanks alot! Edited September 1, 2014 by Pearlyn Chuah Share this post Link to post Share on other sites
sha21 0 Report post Posted September 1, 2014 hi, would u be able to forward me your id contact u went with? thanks in advance! Share this post Link to post Share on other sites
mydestiny 0 Report post Posted September 7, 2014 Hi,Can I have the contact of quote 3 as well? How long is the renovation period? Any pics to share? Many TIA! Share this post Link to post Share on other sites
sweetevil 0 Report post Posted September 7, 2014 HiPlease send me your ID #3 contact. sweetevilspree@gmail.comMany thanks! Share this post Link to post Share on other sites
Ismail Hamzah 1 Report post Posted September 8, 2014 Hi guys anyone can send me the ID for no 2 and no 3..my collection of keys is 4th october 2014costa ris 4 room BTO premium wif floorings from hdb.Appreaciate if anyone can email it to me at@ismail_hmzh@yahoo.com.Thank you so much. Share this post Link to post Share on other sites
Angeljo 0 Report post Posted September 9, 2014 Hi, can pm the 3 ID quotes? Once again congrats on ur new home =) Share this post Link to post Share on other sites
johnlowcw 0 Report post Posted September 11, 2014 Hi lookaround, can PM me the ID3 contact and quotes? Share this post Link to post Share on other sites